| Literature DB >> 35270423 |
Jeppe Z N Ajslev1, Jeppe L Møller1, Malene F Andersen2, Payam Pirzadeh3, Helen Lingard3.
Abstract
Occupational safety and health (OSH) in construction work continues to be a problematic issue, and OSH coordinators are a pivotal initiative for improving this in the EU. However, no studies on the impact of (OSH) coordinators in construction exists. This study conceptualizes the hierarchy of controls (HOC) as a means for visualizing and evaluating the impact of OSH coordinators' work. The study engages with a large observational material based on fieldwork notes from 107 days of observations with 12 successful OSH coordinators. The analysis shows that during the 107 observation days, the coordinators implemented 280 OSH measures and were prevented 71 times from implementing measures. Most of the implemented measures were in the administrative (53.6%) and engineering (35%) controls. This may provide part of the explanation of why an increasing focus on OSH coordination has not translated into improved OSH outcomes in construction. The study contributes with insights for OSH coordinators and professionals seeking to improve the visibility and legitimacy of their work. In addition, it may be beneficial to organizations interested in ensuring the effectiveness of their organizational OSH practices. The study also creates foundations for more research-based practices, education, and professionalization of OSH coordinators as a profession.Entities:
Keywords: OSH coordinator; OSH professional; construction industry; observation study; occupational safety and health
Mesh:
Year: 2022 PMID: 35270423 PMCID: PMC8910555 DOI: 10.3390/ijerph19052731
Source DB: PubMed Journal: Int J Environ Res Public Health ISSN: 1660-4601 Impact factor: 3.390
Figure 1NIOSH model of HOC [28].
Figure 2Number of implemented measures and percentage of HOC measures.
Subcategories of successfully implemented substitution measures.
| Type of Implemented | No. of Implemented Measures |
|---|---|
| Use of technical assistive devices | 5 |
| Alternative chemical product | 1 |
| Ergonomic space for tying rebar on site | 1 |
| Platform for materials instead of in-building transport | 1 |
Subcategories of successfully implemented engineering controls.
| Type of Implemented | No. of Implemented Measures |
|---|---|
| Improved access paths | 23 |
| Safety railing | 21 |
| Logistic plan | 12 |
| Move materials from access paths | 11 |
| Procedures for crane work, handling poisoned dirt or concrete montage in design material | 9 |
| Protective cape on rebar, tying fire extinguishers, replacement of worn electrical wires | 7 |
| Proper excavation degrees or digging boxes | 5 |
| Safety gear or dust suction on machines | 4 |
| Lighting on paths | 3 |
| Specific scaffolding for tasks | 2 |
| Improve column safety | 1 |
Subcategories of successfully implemented administrative controls.
| Type of Implemented | No. of Implemented Measures |
|---|---|
| Safety meeting | 44 |
| Perform safety walk | 20 |
| Revise PSS or risk log | 13 |
| Facilitate safety induction | 11 |
| Facilitate startup or process workshop | 8 |
| Demand risk assessment from entrepreneur | 7 |
| Discuss safety at other meeting | 7 |
| Specify OSH management procedure in design material | 6 |
| Specify communication plan in design material | 6 |
| Tutor a colleague in risk assessment or other OSH | 5 |
| Updated visual construction site plan on site | 5 |
| Put up safety signs | 5 |
| Plan social events and external communication (e.g., with municipalities or citizens) | 4 |
| Plan helmet/noise protection campaign | 4 |
| Conduct design phase to execution phase transition meeting | 4 |
| Near-miss accident evaluation meeting | 2 |
Subcategories of successfully implemented personal protective equipment.
| Type of Implemented | No. of Implemented Measures |
|---|---|
| Use of helmets | 10 |
| Use of fall equipment | 3 |
| Use of noise protection | 3 |
| Use of sunscreen | 1 |
| Use of safety glasses | 1 |
| Use of safety shoes | 1 |
| Use of safety masks | 1 |
| Use of fire extinguisher nearby | 1 |
Figure 3Number of denied initiatives and percentage of denied HOC measures.
Subcategories of denied engineering controls.
| Type of Denied | No. of Denied Initiatives |
|---|---|
| Removing materials from access paths | 5 |
| Safety railing | 5 |
| Improving access paths | 4 |
| Logistic plan | 3 |
| Safety gear or dust suction on machines | 2 |
| Protective cape on rebar, tying fire extinguishers, replacement of worn electrical wires | 2 |
| Proper excavation degrees or digging boxes | 2 |
| Specific scaffolding for tasks | 2 |
| Lighting on paths | 1 |
Subcategories of denied administrative controls.
| Type of Denied | No. of Denied Initiatives |
|---|---|
| Specify OSH management procedure in design material | 11 |
| Safety meeting | 8 |
| Facilitate safety introduction | 4 |
| OSH engagement initiative | 3 |
| Specify communication plan in design material | 3 |
| Facilitate startup or process workshop | 1 |
| Near-miss accident analysis | 1 |
| Helmet campaign | 1 |
| Demand risk assessment | 1 |
| Truck certificate | 1 |
| Alcohol policy | 1 |
| Conduct design phase to execution phase transition meeting | 1 |