Study on overburden failure law and surrounding rock deformation control technology of mining through fault.

Chunlin Zeng1, Yuejin Zhou1, Leiming Zhang1, Donggui Mao1, Kexin Bai1.   

Abstract

In the mining process of working face, the additional stress generated by the fault changes the law of roadway deformation and failure as well as the law of overburden failure. Aiming at the influence of the fault in the mining process of working face, this study introduced the geological strength index (GSI) to analyze the stress distribution in the elastic-plastic zone of the surrounding rock of the roadway. And similar experiments under different engineering backgrounds were combined to study the characteristics of overburden movement and stress evolution. Based on the conclusions obtained, the roadway support scheme was designed. This study shows that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The "three zones" characteristics of the overburden movement disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advanced mining stress on the working face is extended from 20m to 30m. The instability range of roadway surrounding rock is exponentially correlated with the rupture degree of the surrounding rock. Through the introduction of GSI, the critical instability range of roadway surrounding rock is deduced to be 2.32m. According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support.

Entities:  

Mesh:

Substances:

Year:  2022        PMID: 35073363      PMCID: PMC8786183          DOI: 10.1371/journal.pone.0262243

Source DB:  PubMed          Journal:  PLoS One        ISSN: 1932-6203            Impact factor:   3.240


1. Introduction

Fault structure is a common geological structure in underground engineering, which affects mine safety production and underground engineering construction. The mechanical properties of the broken rock mass near the fault structure zone are obviously different from those of other rock masses. As the working face is advanced along the fault, the fault will interfere with the initial stress field, resulting in local subsidiary stress through the complexity and variability of the geological conditions near the fault [1]. In this case, fault activation is easily induced by mining stress. Due to the superposition of the initial stress and the mining stress, the stress environment becomes more complex, which leads to the unbalanced deformation of the roadway and even serious disasters [2-5]. Therefore, when the working face is advanced along the fault, a reasonable and effective support method should be adopted in the area affected by the fault to ensure the stability of the roadway and realize the safe and efficient operation of the mine. Scholars at home and abroad have done a lot of research on the law of overburden failure and the stability of surrounding rock under the influence of faults. By studying the mining of fault footwall where steeply inclined ore bodies intersect, Atsushi Sainoki [6] found that the stress change caused by mining would lead to the fault activation. Qinglong Zhou [7] maintained that the stress concentration at the tip of the fault may cause the overburden movement, and quantitatively evaluated the stress concentration in the stress field at the tip of the fault. Qinglong Zhou [8] analyzed the failure trend of mining-induced fault based on mining-induced differential stress. Hongwei Wang et. al [9] simulated the fault movement in the process of coal mining by conducting similar experiments. On this basis, they concluded that the sharp increase of acoustic emission events could be used as the precursor of fault activation. Huiyong Yin [10] analyzed the movement law of coal seam roof and floor under different mining schemes by means of numerical simulation, which led to the conclusion that reasonable arrangement of mining sequence in the working face was an effective method to mitigate the influence of fault. Jeon [11] found that due to the existence of weak plane, the deformation of surrounding rock was asymmetric and the amount of deformation increased obviously. Donnelly [12] discovered that the stress distribution near the fault fracture zone played an important role in the safety and stability of mining operation, and the stress distribution of the long wall plate caused by mining exerted a significant impact upon the surrounding rock. In order to improve the integrity of the surrounding rock and the stability of the roadway, Liu Jun [13] and Fei Wan [14] et. al used the grouting reinforcement technology to study the surrounding rock control technology near the fault. By means of numerical simulation, Pu Wang [15] revealed the effects of strain energy release, fault slip and HTS failure settlement caused by obvious bending failure of HTS, which provided valuable reference for roadway support. Islam and Shinjo [16] studied the stress distribution and deformation of surrounding rock after the fault was activated by mining disturbance, and analyzed the stability and safety around the fault zone. These studies are based on the complex rock and soil environment under the influence of faults on the roadway failure. Due to the complex and changeable engineering geological conditions, the complex rock and soil environment and the impact of mining on the surrounding rock under the influence of faults are the main reasons for roadway failure [17, 18]. In order to ensure the stability of the surrounding rock of the roadway under the superimposed influence of faults and mining, it is necessary to study its failure mechanism, and then propose a reasonable support design. The initial stress of fault itself and the influence of mining caused by underground engineering have great influence on the roadway and overburden [6, 19–21]. By means of the combination of theoretical analysis and similar experiments, this paper studies the characteristics of surrounding rock deformation and stress evolution law of overburden migration during the mining process under the influence of fault. On this basis, the arrangement and detection of supporting schemes was proposed, which further verified the accuracy of the conclusion obtained. This study provides valuable reference for the stability evaluation of surrounding rock and the design and construction of support structure during the process of coal mining.

2. The analysis of stress distribution characteristics around the roadway under the influence of fault

The fault zone is characterized by its broken state and the fracture development. Thus the nearby rock masses can be assumed as having the characteristics of jointed rock. For the large jointed rock mass which is not uniform due to joint fissures, Evert Hoek and E. T. Brown proposed and developed an empirical formula to predict rock fracture by introducing the geological strength index (GSI), which is shown as follows: Where σ1 and σ3 denote the maximum and minimum principal stresses of the rock at the time of fracture, respectively; σci refers to the uniaxial compressive strength of rock; mb and mi denote the constant of rock fragmentation degree; a and s are the constant of material; D is rock disturbance coefficient. A circular roadway can be taken as an example. The ring diameter of the critical range of instability is set as R, the radius of the roadway is set as l, and the distance between the center of the roadway and the elastic-plastic interface is set as R. Considering that the surrounding rock near the fault is in a stress equilibrium state under the combined action of radial stress (σr) tangential stress (σθ) and shear stress (τ), Hoek-Brown strength criterion is introduced as the criterion for judging the rock mass failure near the fault to analyze the instability range of surrounding rock [22, 23], as is shown in Fig 1.
Fig 1

Simplified mechanical model of roadway surrounding rock.

2.1 Essential conditions

Assume that the original rock stress of the roadway is P, and the rock mass is isotropic and homogeneous, then the stress-strain relationship of the rock mass obeys Hoke’s law in the elastic stage. Where εθ and εr denote the tangential and radial strains in the elastic stage respectively; σθ and σr denote the tangential and radial stresses in the elastic stage; σz refers to the stress perpendicular to the roadway; E stands for the elastic modulus of surrounding rock; μ is Poisson’s ratio of surrounding rock. When the surrounding rock yields, it satisfies the Mohr-Coulomb criterion. That is: Where and denote the maximum and minimum principal stress of surrounding rock in the plastic zone; refers to the plastics softening strength of surrounding rock. where Θ denotes the internal friction angle of surrounding rock. Under the condition of small deformation, the surrounding rock in plastic zone satisfies the stress differential equilibrium equation with gravity stress being ignored:

2.2 The surrounding rock stress in elastic-plastic zones

1) The surrounding rock stress in elastic zone. According to Eq (3), it can be obtained: Therefore, the surrounding rock stress in elastic zone can be shown as: 2) The surrounding rock stress in plastic zone. By combining Eq (3) with Eq (5), the following equation can be obtained: Let M = r, and then the above equation can be transformed into: Accordingly, the surrounding rock stress in plastic zone can be shown as follows:

2.3 Analysis of critical instability range of roadway near the fault

According to the stress analysis of the surrounding rock, it can be known that the excavation of the roadway causes the redistribution of the stress field of the surrounding rock. Near the surrounding rock, the annular rock broken area is produced, that is, the instability zone in the roadway. In the instability zone, the relationship among the critical range of instability, the radius of the roadway, the distance between the center of the roadway and the elastic-plastic interface can be expressed by the following equation: The excavation of the roadway changes the initial three-dimensional stress state of the surrounding rock from the elastic zone to the plastic zone. The surrounding rock mass is in a state of dynamic stress equilibrium, and its critical stress state is displayed as follows: The surrounding rock around the roadway is taken as the stress unit, and the radial stress and the tangential stress on it can be regarded as the maximum and minimum principal stress, respectively. By introducing the Hoek-Brown strength criterion, the following equation can be obtained: At the elastic-plastic interface, the sum of the principal stresses in the elastic zone is equal to that of the plastic zone. Consequently, the boundary conditions can be obtained as r = l, σr = 0, α = 0.5. Substitute these conditions into the above equation, and the following equation can be obtained: By combining Eqs (13) and (14) together, Eq (15) can be obtained: let ,and the critical limit stress of the plastic zone can be obtained: According to the critical limit stress state of the plastic zone, when the stress exceeds its limit value, the surrounding rock will be unstable. At the same time, at the interface between the elastic zone and the plastic zone, because the surrounding rock is in a dynamic equilibrium state, the critical limit stress of the surrounding rock in the plastic zone should be equal to that in the elastic zone. In other words, By combining Eqs (16) and (17) together, the following equation can be obtained: Accordingly, Thus, the critical instability range of roadway surrounding rock can be obtained, which provides a basis for the layout of engineering support scheme as follows:

3. Simulation study of overburden movement under the influence of fault

3.1 Physical scaled model and parameter design

The 2401# working face across the S2F4# fault in No. 24 mining area of a coal mine in Henan Province was selected as the study background. In order to study the overburden failure law and the length range under the influence of the fault during the mining process of the working face, similar experiments were carried out by using the plane stress model. Since the roadway is in the same direction as the working face, so no roadway is arranged. The mining plane stress simulation device KD-01 developed by the State Key Laboratory of Deep Geomechanics and Deep Engineering, China University of Mining and Technology was employed; the size of the physical similarity model was 2.55 m×0.85 m×0.30 m; In total, there were 16 layers of strata which were divided into the left part and the right part by the fault; The fault dip angle was about 70°; The bottom and the top of the fault was about 0.70m and 1.00m away to the left boundary, respectively; The drop on both sides of the fault was 0.04m. Since the fault has a small drop and does not connect to the aquifer, the excavation of the working face under the influence of the fault is the main reason for roadway instability, so the groundwater is not considered. Fig 2 displays the schematic diagram of the model.
Fig 2

Schematic diagram of stress measuring point layout.

According to the formation lithology and the strength of similar materials, the experimental design scheme is shown in Table 1. The strata are horizontally arranged, with the geometric similarity ratio being 62.50, the bulk density similarity ratio being 1.47, and the stress similarity ratio is 91.88. According to the thickness of the covering layer is 428.11m and the stress similarity ratio is 91.88, a stress of 0.09 Mpa is applied to the upper surface of the model to compensate for the influence of the overburden load on the model.
Table 1

Experimental design of mixing ratio.

No.lithologyThickness of stratum/mThickness of model/cmMaterial consumption/kg
River sandcalcium carbonategypsum
16mudstone2.50417.951.343.14
15medium sandstone3.816.161.107.3317.11
14aluminous mudstone4.126.671.996.1714.39
13siltstone4.186.770.477.0416.44
12aluminous mudstone2.373.841.453.558.29
11siltstone1.87331.553.157.36
10aluminous mudstone4.687.581.817.0116.36
9medium sandstone1.752.828.053.367.85
8aluminous mudstone3.12554.544.6710.90
7siltstone4.757.679.947.9918.65
6medium sandstone6.2510100.1712.0228.05
5siltstone3.605.759.955.9913.98
4mudstone2.003.235.902.696.28
3coal2.403.843.602.906.78
2mudstone2.313.741.513.117.26
1fine sandstone6.009.588.148.8120.56

3.2 Stress displacement monitoring and excavation design

As is shown in Fig 2, points at an interval of 5 cm are arranged on the surface of the model to serve as displacement measuring points. According to different mining methods, four stress monitoring points are set respectively. At the same time, since the periodic weighting length in the actual engineering cycle under ordinary mining conditions is 20 m, the distance between stress monitoring points is set to 20 cm. The model reserves 15 cm of boundary coal pillar to eliminate the mining boundary effect, and then advances from right to left with the mining step length of 5 cm. The normal excavation method is used before the model advances to 145 cm, and then shifts to the through-the-fault excavation method. The overburden movement and stress evolution in different mining scenarios are analyzed and compared to obtain the parameters of fault activation, rock caving characteristics, and stress concentration in the case of the through-the-fault excavation. On this basis, the roadway damage caused by through-the-fault excavation can be analyzed, which provides relevant experimental and data reference for the further studies on the deformation law and control of roadway surrounding rock.

4. Analysis of overburden movement law and stress evolution in different excavation scenarios

4.1 The overburden movement law in different excavation scenarios

As is shown in Fig 3, in the process of the working face advancing from the open-cut to the fault, when the working face is relatively far from the fault, the ground pressure characteristics of the working face are basically consistent with the law of overburden movement without the influence of faults, displaying obvious “three-zone” characteristics [24]. As is shown in Fig 3A, as the working face advances to 20 cm, the overhanging area of the direct roof increases continuously and the direct roof breaks for the first time. As is shown in Fig 3B, as the working face advances to 28 cm, the whole direct roof caves and the initial caving distance is 28 cm; as the working face advances to 40 cm, the separation appears between the direct roof and main roof; as the working face advances to 45 cm, longitudinal cracks appear at the edge of goaf. Fig 3C shows that the longitudinal cracks increase and develop gradually upward as the working face advances further; meanwhile, the roof bending and sagging becomes increasingly serious. Fig 3D shows that the first breaking of main roof occurs when the working face advances to 60 cm; the first roof weighting length of the main roof is 60cm. As is shown in Fig 3E, as the working face advances further, the periodic weighting length reduces to 30 cm. With the periodic weighting of the main roof, the height of caving zone above the coal seam is 145 cm, and the crack zone continues to expand upward. When the excavation reaches up to 70 cm, the longitudinal cracks at both sides of goaf and in the middle of goaf develop upward continuously; meanwhile a new separation appears about 55cm above the coal seam. The development height of the sagging zone has exceeded 50cm, and most of the load upon the overlying strata is transferred to the direction of the goaf and working face. Fig 3F shows that when the model is excavated to 85 cm, cracks occur in the aluminous mudstone layer, and longitudinal cracks develop further upward in the roof above the coal seam on both sides and in the middle of the goaf. At 76 m above the coal seam, new separation occurs under the siltstone layer, and the development height of the sagging zone has exceeded 70 cm. When the model is excavated to 100 cm, the cracks further develop upward to the upper plane of the model. At this time, the separation layer above the goaf is initially closed, and the overlying strata on the stope bend and sink synchronously with the advance of the working face, which is shown in Fig 3G. As is shown in Fig 3H, when the model is excavated to 110 cm, the separation layer above the goaf at the upper part of the stope is completely closed, and no new separation layer appears.
Fig 3

Working face advancement diagram under normal mining conditions.

(a) The first caving of direct roof. (b) The appearance of separation. (c) The development of cracks. (d) The first breaking of main roof. (e) The cracks develop upward and form the separation. (f) The separation further develops upward. (g). The cracks develop up to the upper plane of the model. (h) The separation is completely closed.

Working face advancement diagram under normal mining conditions.

(a) The first caving of direct roof. (b) The appearance of separation. (c) The development of cracks. (d) The first breaking of main roof. (e) The cracks develop upward and form the separation. (f) The separation further develops upward. (g). The cracks develop up to the upper plane of the model. (h) The separation is completely closed. As is shown in Fig 4, when the working face advances to the influence range of fault, the overburden movement occurs violently, and the “three zones” characteristics of the overlying strata virtually disappear for all. Fig 4A shows that the top of the fault began to dislocate when the model is excavated to 145 cm; and the local activation height was 5cm. Fig 4B displays that the activation range of the local fault is enlarged, and some cracks on one side of the fault are closed when the model is excavated to 150 cm. Fig 4C shows that the activation range of local faults continues to increase when the model is excavated to 155 cm. Fig 4D displays that when the model is excavated to 160 cm, the working face mining enters the forceful through-the-fault stage. At this time, the fault is fully activated, with the footwall of the fault sinking and a wide gap appearing between the hanging wall and footwall of the fault. Ain the meanwhile, some cracks in the footwall of the fault are closed and no new cracks are generated. Fig 4E shows that when the model is excavated to 175 cm, the mining in the working face has been out of the fault footwall range and enters the range of the hanging wall along the floor. The roof in the fault footwall caving zone sinks and fills the goaf. As is shown in Fig 4F, when the model is excavated to 180 cm, the roof breaks for the first time within the range of the fault hanging wall. When the model is excavated to 200 cm, the roof breaks for the second time within the range of the fault hanging wall, and the cracks begin to develop upward, as is shown in Fig 4G. When the model is excavated to 225 cm, the roof breaks for the third time within the range of the fault hanging wall (as shown in Fig 4H). In other words, the periodic break distance of the roof on the fault hanging wall about 25~30 cm. Meanwhile, the cracks continue to develop upward and the overlying strata bend and sink as a whole. At this time, the model excavation is completed.
Fig 4

Working face advancement diagram under normal mining conditions.

(a) Local fault activation occurs in the fault top. (b) Some cracks on one side of the fault are closed. (c) The activation range of the local fault continues to be enlarged. (d) The fault is fully activated. (e) The working face advances across the fault. (f) The roof breaks for the first time. (g) The roof breaks for the second time. (h) The model excavation is completed.

(a) Local fault activation occurs in the fault top. (b) Some cracks on one side of the fault are closed. (c) The activation range of the local fault continues to be enlarged. (d) The fault is fully activated. (e) The working face advances across the fault. (f) The roof breaks for the first time. (g) The roof breaks for the second time. (h) The model excavation is completed. From the excavation of the model, the law of overburden movement under ordinary mining conditions can be revealed. To be specific, in the process of working face advancing, after the initial collapse of the direct roof, the direct roof and the main roof in the caving zone above the coal seam continue to fracture and cave with the advance of the working face, presenting obvious periodical characteristics. Due to the continuous expansion of the goaf area, the overlying strata lose the support, and the separation is constantly generated in the overlying strata of the goaf area, and the formation is mostly located in the lower surface of the relatively thick and hard strata. With the advance of working face, the separation develops continuously until the goaf area is larger than the limit span of the thick hard rock; Then the thick hard rock starts to bend and cave in that the load on it exceeds its own bearing capacity, making the separation space gradually closed. There is a positive correlation between the development of overburden cracks and the advance of working face. The development of overburden cracks is in the form of inverted trapezoid from bottom to top, which ultimately transfers most of the overburden loads to the goaf. However, under the condition of mining through the fault, the characteristics of the three zones in the overlying rock virtually disappear. With the decrease of the distance from the fault, local activation occurs at the top of the fault first, and the hanging wall of the fault is broken in an inverted triangle, and the footwall is separated from the bed and compacted, and the crack is closed. When the excavation exceeds the footwall range of the fault, the overall activation of the fault occurs along the bottom floor of the strong over-fault, and the footwall completely sinks. Therefore, it is necessary to strengthen support in the fault range to prevent the roadway damage and guarantee the production safety.

4.2 The analysis of stress evolution in different excavation scenarios

According to the stress monitoring in each excavation sample section under normal mining conditions, the relationship curve between the stress value of each measuring point under normal mining conditions and the excavation distance is drawn, as shown in Fig 5A. With the advance of the working face, the stress in front of the working face increases and reaches the peak at the nearest place to the stress measuring point. When the working face exceeds the measuring point, the stress decreases rapidly to a certain value and then maintains a slight fluctuation. According to the above data, the stress generally begins to rise when the working face is about 30 cm away from the measuring point. In other words, the advance stress distance of the working face is about 20 m.
Fig 5

Excavation distance-stress value curve.

(a) Normal excavation. (b) Through-the-fault excavation.

Excavation distance-stress value curve.

(a) Normal excavation. (b) Through-the-fault excavation. As is shown in Fig 5B, in the through-the-fault excavation scenario, in addition to the stress peak caused by the working face advancing near the measurement point, due to the activation of the fault, another stress peak appears in the vertical stress of the hanging wall of the fault when the excavation reaches up to about 155~160 cm. By comparing the overburden movement law in the stage of mining through the fault, it can be seen that the fault is fully activated when excavated to 155~160 cm, the hanging wall and foot wall of the fault are dislocated and separated, and the stress on both sides of the fault changes. During the advancement of the working face, the subsidence of the overlying rock layer changes from trapezoid to inverted triangle. A large amount of load migrates to the coal and rock mass of the hanging wall of the fault, causing the peak stresses at the measuring points of the hanging wall to be higher than that of the foot wall. The vertical stress displays the following change trend: remaining stable in the pre-mining stage, rising during the mining stage, and declining in the post-mining stage. The mining distance is synchronized with the vertical stress change. According to the relationship between the stress and the excavation distance, the abutment stress only fluctuates slightly when the working face is far from the stress measuring point, and there is no obvious stress change. When the model excavation advances to about 45 cm away from the fault, the vertical stress starts to rise sharply, corresponding to a 30 m-long influence range of advance support stress in actual engineering. When the model excavation approaches the fault, the stress reaches its peak value; and meanwhile, the influence of fault activation upon the roadway is very strong. When the working face exceeds the fault, the overlying strata collapse and the stress declines to a level slightly higher than the initial stress.

5. Engineering application

5.1 The general situation of the working face

The 2401# fully mechanized working face is located in the 24th mining area of a coal mine, with DF4 fault protecting coal pillar in the west, solid coal in the north, and F40# fault protecting coal pillar in the south. With a strike length of 184.9 m, the working face has a mining area of 147,095 m2, and the average coal seam thickness is 2.4m. The working face is a monoclinal structure as a whole; the strata dips northwestward at a dip Angle of 5~15°; and the average dip Angle is about 12°. The whole working face strikes northeast to east northeast and dips northwest to north northwest. The direct roof is sandy mudstone with a thickness of 2.39~2.59 m, and the immediate floor is mudstone with a thickness of 0.5~1.2 m. During the excavation of the air return way and the haulage way, two normal faults are actually exposed. The distance between the two faults is 387.6m, and they do not affect each other during the mining of the working face, as shown in Fig 6.
Fig 6

The general situation of the working face and layout of measuring points.

5.2 The support design of roadway surrounding rock

According to the analysis of the actual geological conditions of the adjacent excavated roadways, the mining crossheading of the 2401# working face is greatly affected by the fault. As the working face advances towards the fault, the full activation of the faults will lead to abnormal increase of stress near the fault, which may seriously cause dynamic disasters such as rock burst. According to the results of the similar simulation experiment, with the mining face getting closer to the fault, the influence of the fault activity on the roadway increases significantly. Therefore, reinforced support is set within 30m from the fault. At the same time, according to the engineering geological conditions within this range, the relevant parameters of surrounding rock are set as follows: GSI—60, l—2.12 m, σ—16 MPa, and P—9.0 MPa. Through theoretical analysis and by substituting these parameters into Eq (20), the critical instability range of roadway surrounding rock near the fault can be calculated as 2.32 m. According to similar experiments and theories, the influence range of faults on the roadway in the mining process of the working face is obtained, and different supporting designs should be adopted for different mining scenarios.

1) Normal mining support

The support scheme under normal mining conditions is shown in Fig 7. To be specific, the diameter of the bolt is 22 mm, the length is 2.4m, the spacing between rows is 800 mm, the yield strength is 500 MPa, and the pre-tightening force is greater than 100 kN. The anchor cable adopts 4 strands of high strength and low relaxation steel strand with a diameter of 21.6 mm and a length of 7.3 m. Inter-row spacing is set be to 1,500 mm×1,400 mm, the pre-tightening force and anchoring force is greater than 100 kN and 200 kN, respectively. Metal mesh specification is 1,000 mm×2,000 mm, with the size of mesh being 100 mm×100 mm; Three anchor cables and 6 anchor rods are arranged on the roof, and the steel ladder made of steel rods with a diameter of 14mm is also hung on the roof.
Fig 7

Schematic diagram of roadway support.

2) The support scheme adjacent to the fault

The support scheme adjacent to the fault is shown in Fig 8. To be specific, the diameter of the bolt is 22 mm, the length is 2.6 m, the spacing between rows is 600 mm, the yield strength is 500 MPa, and the pre-tightening force is greater than 100 kN. The anchor cable adopts 4 strands of high strength and low relaxation steel strand with a diameter of 21.6 mm and a length of 7.3 m. Inter-row spacing is set be to 1,200 mm×1,400 mm, the pre-tightening force and anchoring force is greater than 100kN and 200kN, respectively. Metal mesh specification is 1,000 mm×2,000 mm, with the size of mesh being 100 mm×100 mm; Four anchor cables and 7 anchor rods are arranged on the roof, and the steel ladder made of steel rods with a diameter of 14 mm is also hung on the roof.
Fig 8

The schematic diagram of roadway support adjacent to the fault.

5.3 Analysis of roadway support effect

When the surrounding rock of the roadway is under the action of stress, it will experience multi-directional dynamic deformation. Therefore, the roadway stability can be intuitively judged by measuring the variation of floor heave horizontal convergence, and vault subsidence. For the air return way on the 2401# working face, measuring stations are set every 30 m starting from the fault position, and three measuring stations (A1, A2, A3) are set in total, as Fig 6 show. The whole observation on the measuring stations lasts for three months. The monitoring results are shown in Fig 9.
Fig 9

The surrounding rock deformation-time diagram.

As Fig 9 show, the deformation rates of surrounding rock in the three roadway sections are below 0.2 mm/d; the variation trend of floor heave, horizontal convergence and vault subsidence observed at all the three measuring stations is basically consistent; the displacement variation rate increases rapidly at first and then decreases gradually, and finally the surrounding rock of the roadway tends to be stable. During the whole process, the stress of roadway surrounding rock experiences a constant and gradual adjustment. As the monitoring results obtained at A1 measuring station show, the average rate of horizontal convergence at two sides is 1.48mm/d, that of vault subsidence is 1.05 mm/d, and that of floor heave is 2.38 mm/d. The monitoring results obtained at A2 measuring station show that the average rate of horizontal convergence at two sides is 0.70 mm/d, that of vault subsidence is 0.57 mm/d, and that of floor heave is 1.40 mm/d. In the case of A3 measuring station, the average rate of horizontal convergence at two sides is 0.89 mm/d, that of vault subsidence is 0.30 mm/d, and that of floor heave is 1.26 mm/d. The field measured data indicate that the reinforced support in the fault-affected stage can effectively reduce the deformation of roadway surrounding rock. To be specific, at the beginning of excavation, the displacement rate of surrounding rock increases rapidly, and then decreases with the increase of distance from the fault; when the excavation lasts for 30 days, the surface displacement rate of surrounding rock begins to decrease; when the excavation continues till 50~60 days, the roadway deformation basically tends to be stable; and at this time the deformation rate is within the normal control range of 0.1~0.5 mm/d. By introducing Hoek-Brown strength criterion to analyze the stress distribution in the elastic-plastic zone, this paper reveals that the instability range of roadway surrounding rock is exponentially correlated with the rupture degree of surrounding rock under the action of fault zone. On this basis, the critical instability range of roadway surrounding rock is deduced to be 2.32 m. Similar experiments show that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement basically disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advance mining stress on the working face is extended from 20m to 30m. The engineering application shows that the reinforced support has a good support effect for the roadway under the influence of the fault in the mining process of the working face. At the beginning of excavation, the displacement rate of surrounding rock increases rapidly, and then decreases with the increase of distance from the fault; when the excavation lasts for 30 days, the surface displacement rate of surrounding rock begins to decrease; when the excavation continues till 50~60 days, the roadway deformation basically tends to be stable; and at this time the deformation rate is within the normal control range of 0.1~0.5 mm/d.

Normal excavation.

(DOCX) Click here for additional data file.

Through-the-fault excavation.

(DOCX) Click here for additional data file.

The surrounding rock deformation-time diagram.

(DOCX) Click here for additional data file. 22 Sep 2021
PONE-D-21-26499
Study on overburden failure law and surrounding rock deformation control technology of mining through fault
PLOS ONE Dear Dr. ZHOU, Thank you for submitting your manuscript to PLOS ONE. The reviewers have commented on your above paper. They indicated it requires some modifications in order to be acceptable for publication After careful consideration, we feel that it has merit but does not fully meet PLOS ONE’s publication criteria as it currently stands. Therefore, we invite you to submit a revised version of the manuscript that addresses the points raised during the review process. If you feel that you can suitably address the reviewers' comments (included below), I invite you to revise and resubmit your manuscript. Please carefully address the issues raised in the comments. Please submit your revised manuscript by Nov 06 2021 11:59PM. If you will need more time than this to complete your revisions, please reply to this message or contact the journal office at plosone@plos.org. When you're ready to submit your revision, log on to https://www.editorialmanager.com/pone/ and select the 'Submissions Needing Revision' folder to locate your manuscript file. Please include the following items when submitting your revised manuscript:
A rebuttal letter that responds to each point raised by the academic editor and reviewer(s). You should upload this letter as a separate file labeled 'Response to Reviewers'. A marked-up copy of your manuscript that highlights changes made to the original version. You should upload this as a separate file labeled 'Revised Manuscript with Track Changes'. An unmarked version of your revised paper without tracked changes. You should upload this as a separate file labeled 'Manuscript'. If you would like to make changes to your financial disclosure, please include your updated statement in your cover letter. Guidelines for resubmitting your figure files are available below the reviewer comments at the end of this letter. If applicable, we recommend that you deposit your laboratory protocols in protocols.io to enhance the reproducibility of your results. Protocols.io assigns your protocol its own identifier (DOI) so that it can be cited independently in the future. For instructions see: https://journals.plos.org/plosone/s/submission-guidelines#loc-laboratory-protocols. Additionally, PLOS ONE offers an option for publishing peer-reviewed Lab Protocol articles, which describe protocols hosted on protocols.io. Read more information on sharing protocols at https://plos.org/protocols?utm_medium=editorial-email&utm_source=authorletters&utm_campaign=protocols. We look forward to receiving your revised manuscript. Kind regards, Fabio Trippetta, Ph.D. Academic Editor PLOS ONE Journal requirements: When submitting your revision, we need you to address these additional requirements. 1. Please ensure that your manuscript meets PLOS ONE's style requirements, including those for file naming. The PLOS ONE style templates can be found at https://journals.plos.org/plosone/s/file?id=wjVg/PLOSOne_formatting_sample_main_body.pdf and https://journals.plos.org/plosone/s/file?id=ba62/PLOSOne_formatting_sample_title_authors_affiliations.pdf 2. We note that the grant information you provided in the ‘Funding Information’ and ‘Financial Disclosure’ sections do not match. When you resubmit, please ensure that you provide the correct grant numbers for the awards you received for your study in the ‘Funding Information’ section. 3. Thank you for stating the following financial disclosure: “This research was supported by the Fundamental Research Funds for the Central Universities (2019ZDPY18), and project supported by the National Natural Science Foundation of China (51874289).” Please state what role the funders took in the study.  If the funders had no role, please state: "The funders had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript." If this statement is not correct you must amend it as needed. Please include this amended Role of Funder statement in your cover letter; we will change the online submission form on your behalf. 4. Thank you for stating the following in the Funding Section of your manuscript: “This research was supported by the Fundamental Research Funds for the Central Universities (2019ZDPY18), and project supported by the National Natural Science Foundation of China (51874289).” We note that you have provided information within the Funding Section. Please note that funding information should not appear in other areas of your manuscript. We will only publish funding information present in the Funding Statement section of the online submission form. Please remove any funding-related text from the manuscript and let us know how you would like to update your Funding Statement. Currently, your Funding Statement reads as follows: “This research was supported by the Fundamental Research Funds for the Central Universities (2019ZDPY18), and project supported by the National Natural Science Foundation of China (51874289).” Please include your amended statements within your cover letter; we will change the online submission form on your behalf. 5. In your Data Availability statement, you have not specified where the minimal data set underlying the results described in your manuscript can be found. PLOS defines a study's minimal data set as the underlying data used to reach the conclusions drawn in the manuscript and any additional data required to replicate the reported study findings in their entirety. All PLOS journals require that the minimal data set be made fully available. For more information about our data policy, please see http://journals.plos.org/plosone/s/data-availability. Upon re-submitting your revised manuscript, please upload your study’s minimal underlying data set as either Supporting Information files or to a stable, public repository and include the relevant URLs, DOIs, or accession numbers within your revised cover letter. For a list of acceptable repositories, please see http://journals.plos.org/plosone/s/data-availability#loc-recommended-repositories. Any potentially identifying patient information must be fully anonymized. Important: If there are ethical or legal restrictions to sharing your data publicly, please explain these restrictions in detail. Please see our guidelines for more information on what we consider unacceptable restrictions to publicly sharing data: http://journals.plos.org/plosone/s/data-availability#loc-unacceptable-data-access-restrictions. Note that it is not acceptable for the authors to be the sole named individuals responsible for ensuring data access. We will update your Data Availability statement to reflect the information you provide in your cover letter 6. PLOS requires an ORCID iD for the corresponding author in Editorial Manager on papers submitted after December 6th, 2016. Please ensure that you have an ORCID iD and that it is validated in Editorial Manager. To do this, go to ‘Update my Information’ (in the upper left-hand corner of the main menu), and click on the Fetch/Validate link next to the ORCID field. This will take you to the ORCID site and allow you to create a new iD or authenticate a pre-existing iD in Editorial Manager. Please see the following video for instructions on linking an ORCID iD to your Editorial Manager account: https://www.youtube.com/watch?v=_xcclfuvtxQ 7. Please amend the manuscript submission data (via Edit Submission) to include author “Kexin Bai”. [Note: HTML markup is below. Please do not edit.] Reviewers' comments: Reviewer's Responses to Questions Comments to the Author 1. Is the manuscript technically sound, and do the data support the conclusions? The manuscript must describe a technically sound piece of scientific research with data that supports the conclusions. Experiments must have been conducted rigorously, with appropriate controls, replication, and sample sizes. The conclusions must be drawn appropriately based on the data presented. Reviewer #1: Yes Reviewer #2: Yes ********** 2. Has the statistical analysis been performed appropriately and rigorously? Reviewer #1: I Don't Know Reviewer #2: Yes ********** 3. Have the authors made all data underlying the findings in their manuscript fully available? The PLOS Data policy requires authors to make all data underlying the findings described in their manuscript fully available without restriction, with rare exception (please refer to the Data Availability Statement in the manuscript PDF file). The data should be provided as part of the manuscript or its supporting information, or deposited to a public repository. For example, in addition to summary statistics, the data points behind means, medians and variance measures should be available. If there are restrictions on publicly sharing data—e.g. participant privacy or use of data from a third party—those must be specified. Reviewer #1: No Reviewer #2: Yes ********** 4. Is the manuscript presented in an intelligible fashion and written in standard English? PLOS ONE does not copyedit accepted manuscripts, so the language in submitted articles must be clear, correct, and unambiguous. Any typographical or grammatical errors should be corrected at revision, so please note any specific errors here. Reviewer #1: Yes Reviewer #2: Yes ********** 5. Review Comments to the Author Please use the space provided to explain your answers to the questions above. You may also include additional comments for the author, including concerns about dual publication, research ethics, or publication ethics. (Please upload your review as an attachment if it exceeds 20,000 characters) Reviewer #1: 1.What is the study object of the paper? Working face or roadway? 2. The Abstract section is suggested to re-write according to the study objective. 3. Please clarify the novelty of the MS. 4. In physical model, why is there no roadway?If you study the surrounding rock deformation control technology of roadway, the roadway shoulde be arrangment in physical model. 5. In section 5.2, please check the reliability of result of 2.32m。 6. In Fig.5b, why two peak stress point with the No.7 205cm and the peak value of rear face exceeds that of front value? 7. What is the basis for setting the two support schemes for the roadway with different mining conditions in section 5.2. Reviewer #2: The manuscript is based on the theoretical analysis and similar material simulation test, the characteristics of roadway deformation, overburden movement and stress evolution in the process of working face fault advance are studied, and the formula for calculating the critical instability range of roadway surrounding rock is derived. The method is applied to engineering practice, which is well verified by field practice and has certain theoretical and practical value. However, there are still some problems in the manuscript, hoping to help improve the quality of the manuscript: 1.It is suggested to put "On this basis, the critical instability range of open-cut surrounding rock is deduced to be 2.32m" in the penultimate sentence of the abstract. Because the critical instability range of open-cut surrounding rock is obtained by inserting the parameters obtained from the simulation of similar materials into the formula. This order makes summaries more organized and readable. 2.The introduction part only lists the research status at home and abroad, but does not get its own understanding and views, and lacks analysis and summary. In addition, the literature tends to be old and should be supplemented with recent research results. 3.Equation (16) can be reduced to the equation with N, since we have set. 4.It is suggested to combine equations (20) and (21) into one set of equations. 5.It is mentioned in the overview of the working face that two faults are actually exposed, but this paper only studies the failure characteristics of surrounding rock over one fault. The two faults interact with each other during exploitation? Please explain. 6.The page 16, line 187, a force equivalent to the overlay load is applied to the upper surface of the model. Please instructions the thickness of the covering layer. What is the magnitude of the equal effect? 7.Please add a plan of the working face in the general section of the working face, indicating the position of the working face in the mining area, the fault position and the position of three measuring stations A1, A2 and A3, etc. 8.Fig.6 and Fig.7 please add the legend part to illustrate the meanings of different lines and marks in the figure. 9.Conclusions should be drawn back to the original text and it is suggested to indicate from which part each conclusion was drawn. For example, numerical simulation experiments show that overburden movement shows obvious "three zones......" 10.The format of 24 references is not correct. ********** 6. PLOS authors have the option to publish the peer review history of their article (what does this mean?). If published, this will include your full peer review and any attached files. If you choose “no”, your identity will remain anonymous but your review may still be made public. Do you want your identity to be public for this peer review? For information about this choice, including consent withdrawal, please see our Privacy Policy. Reviewer #1: No Reviewer #2: No [NOTE: If reviewer comments were submitted as an attachment file, they will be attached to this email and accessible via the submission site. Please log into your account, locate the manuscript record, and check for the action link "View Attachments". If this link does not appear, there are no attachment files.] While revising your submission, please upload your figure files to the Preflight Analysis and Conversion Engine (PACE) digital diagnostic tool, https://pacev2.apexcovantage.com/. PACE helps ensure that figures meet PLOS requirements. To use PACE, you must first register as a user. Registration is free. Then, login and navigate to the UPLOAD tab, where you will find detailed instructions on how to use the tool. If you encounter any issues or have any questions when using PACE, please email PLOS at figures@plos.org. Please note that Supporting Information files do not need this step. 11 Oct 2021 Dear Editors and Reviewers, Thank you very much for your careful review of our paper. The feedback is very valuable. We have revised the manuscript in response to your suggestions and questions. All the modifications made according to reviewer’s comments are highlighted in yellow and using track changes in the manuscript. Our responses are also outlined below following your comments. I hope the revised manuscript is acceptable for publication in our journal. Sincerely, Yuejin Zhou, Ph. D. Corresponding author for the manuscript Ref: PONE-D-21-26499 Title: Study on overburden failure law and surrounding rock deformation control technology of mining through fault Journal: PLOS ONE Journal requirements: 1. Please ensure that your manuscript meets PLOS ONE's style requirements, including those for file naming. Answer: Thank you for this suggestion. We have tried our best to revise the manuscript and file according to the requirements of our journal. 2. We note that the grant information you provided in the ‘Funding Information’ and ‘Financial Disclosure’ sections do not match. Answer: Your help is greatly appreciated. We revised the numbers for the awards. This research was supported by the Fundamental Research Funds for the Central Universities (2019ZDPY18 to JYZ) and the National Natural Science Foundation of China (51874289 to JYZ). 3. Thank you for stating the financial disclosure. Please state what role the funders took in the study. Answer: Thank you for this suggestion. The funders had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript. 4. Please remove any funding-related text from the manuscript and let us know how you would like to update your Funding Statement. Answer: Thank you for this suggestion. We have removed any funding-related text from the manuscript. 5. Upon re-submitting your revised manuscript, please upload your study’s minimal underlying data set as either Supporting Information files or to a stable, public repository and include the relevant URLs, DOIs, or accession numbers within your revised cover letter. Answer: Thank you for this suggestion. We have uploaded experimental data in the manuscript and set it as Supporting Information files. 6. Please ensure that you have an ORCID iD and that it is validated in Editorial Manager. Answer: Thank you for this suggestion. I have set up one ORCID iD, and it is validated in Editorial Manager. 7. Please amend the manuscript submission data (via Edit Submission) to include author “Kexin Bai” Answer: Thank you for this suggestion. We have tried our best to revised the manuscript submission data accordingly. Reviewer #1: 1.What is the study object of the paper? Working face or roadway? Answer: Thanks for your comment. The main research object of this paper is the roadway affected by faults in the mining process of the working face. 2. The Abstract section is suggested to re-write according to the study objective. Answer: Thank you for this suggestion. We have rewritten the abstract section according to the study objective in line 11-29 of the revised manuscript. The abstract is rewritten as follows: “In the mining process of working face, the additional stress generated by the fault changes the law of roadway deformation and failure as well as the law of overburden failure. Aiming at the influence of the fault in the mining process of working face, this study introduced the Hoek-Brown strength criterion to analyze the stress distribution in the elastic-plastic zone of the surrounding rock of the roadway. And similar experiments under different engineering backgrounds were used to study the characteristics of overburden movement and stress evolution. This study shows that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advanced mining stress on the working face is extended from 20m to 30m. The instability range of roadway surrounding rock is exponentially correlated with the rupture degree of the surrounding rock. On this basis, the critical instability range of roadway surrounding rock is deduced to be 2.32m. According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support.” 3. Please clarify the novelty of the MS. Answer: Aiming at the impact of the fault on the roadway in the mining process of working face, this paper analyzes the elastoplastic zone of the roadway and the failure law of the overlying rock layer through a combination of theory and similar experiments under different backgrounds. This study shows that 1) The instability range of roadway surrounding rock is exponentially correlated with the rupture degree of surrounding rock. On this basis, the critical instability range of roadway surrounding rock is deduced to be 2.32m. 2) Compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement basically disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advance mining stress on the working face is extended from 20m to 30m. 3) According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support design. 4. In physical model, why is there no roadway?If you study the surrounding rock deformation control technology of roadway, the roadway shoulde be arrangment in physical model. Answer: Thanks for your comment. In order to study the overburden failure law and the length range under the influence of the fault during the mining process of the working face, similar experiments were carried out by using the plane stress model. Since the roadway is in the same direction as the working face, so no roadway is arranged. We have added the description of similar experiment settings in line 180-183 of the revised manuscript. 5. In section 5.2, please check the reliability of result of 2.32m. Answer: Thanks for your comment. We have partially merged the formulas in line 175 of the revised manuscript, Modify “ The equation(21)” to “The equation(20) ”. and the specific calculation results are written in the file of“Responses to reviewers” 6. In Fig.5b, why two peak stress point with the No.7 205cm and the peak value of rear face exceeds that of front value? Answer: Thanks for your comment. Due to the activation of the fault, another stress peak appears in the vertical stress of the hanging wall of the fault. The hanging wall and foot wall of the fault are dislocated and separated, and the stress on both sides of the fault changes. During the advancement of the working face, the subsidence of the overlying rock layer changes from “trapezoid” to “inverted triangle”. A large amount of load migrates to the coal and rock mass of the hanging wall of the fault, causing the peak stresses at the measuring points of the hanging wall to be higher than that of the foot wall. And we have added relevant explanations in line 317-326 of the revised manuscript. 7. What is the basis for setting the two support schemes for the roadway with different mining conditions in section 5.2. Answer: Thanks for your comment. According to theoretical calculations and similar experiments, the instability range and influence distance of the roadway under the influence of mining and the fault have been obtained, and the bolt length and roadway reinforced support length are redesigned. We have added relevant explanations in line 367-370 of the revised manuscript. Reviewer #2: The manuscript is based on the theoretical analysis and similar material simulation test, the characteristics of roadway deformation, overburden movement and stress evolution in the process of working face fault advance are studied, and the formula for calculating the critical instability range of roadway surrounding rock is derived. The method is applied to engineering practice, which is well verified by field practice and has certain theoretical and practical value. However, there are still some problems in the manuscript, hoping to help improve the quality of the manuscript: 1.It is suggested to put "On this basis, the critical instability range of open-cut surrounding rock is deduced to be 2.32m" in the penultimate sentence of the abstract. Because the critical instability range of open-cut surrounding rock is obtained by inserting the parameters obtained from the simulation of similar materials into the formula. This order makes summaries more organized and readable. Answer: Thank you for this suggestion. We have rewritten the abstract section and put "On this basis, the critical instability range of open-cut surrounding rock is deduced to be 2.32m" behind the conclusions of similar experiments, as showed in line 23-24 of the revised manuscript. 2.The introduction part only lists the research status at home and abroad, but does not get its own understanding and views, and lacks analysis and summary. In addition, the literature tends to be old and should be supplemented with recent research results. Answer: Thank you for this suggestion. We have updated references in line 64 and 74, and added “These studies are based on the complex rock and soil environment under the influence of faults on the roadway failure. Due to the complex and changeable engineering geological conditions, the complex rock and soil environment and the impact of mining on the surrounding rock under the influence of faults are the main reasons for roadway failure. In order to ensure the stability of the surrounding rock of the roadway under the superimposed influence of faults and mining, it is necessary to study its failure mechanism, and then propose a reasonable support design.” in line 70-76 of the introduction section. 3.Equation (16) can be reduced to the equation with N, since we have set. Answer: Thanks for your comment. We have simplified equation (16) to the equation with N in line 162 of the revised manuscript. 4.It is suggested to combine equations (20) and (21) into one set of equations. Answer: Thank you for this suggestion. We have combined equations (20) and (21) into one set of equations in line 173-175 of the revised manuscript. 5.It is mentioned in the overview of the working face that two faults are actually exposed, but this paper only studies the failure characteristics of surrounding rock over one fault. The two faults interact with each other during exploitation? Please explain. Answer: Thanks for your comment. The distance between the two faults is 387.6m. Because they are far apart, they will not affect each other during the mining process of the working face. We have added description of the mining face in line 351-353 of the revised manuscript, and added an overview map and as shown in Fig 6. 6.The page 16, line 187, a force equivalent to the overlay load is applied to the upper surface of the model. Please instructions the thickness of the covering layer. What is the magnitude of the equal effect? Answer: Thanks for your comment. We have replaced “A counterweight equivalent to the overburden load is applied to the upper surface of the model.” with “According to the thickness of the covering layer is 428.11m and the stress similarity ratio is 91.88, a stress of 0.09 Mpa is applied to the upper surface of the model to compensate for the influence of the overburden load on the model.”, as showed in line 196-198 of the revised manuscript. 7.Please add a plan of the working face in the general section of the working face, indicating the position of the working face in the mining area, the fault position and the position of three measuring stations A1, A2 and A3, etc. Answer: Thanks for your comment. We have added a plan of the working face, indicating the position of the working face in the mining area, the fault position and the position of three measuring stations A1, A2 and A3, as shown in Fig 6 of the revised manuscript. 8.Fig.6 and Fig.7 please add the legend part to illustrate the meanings of different lines and marks in the figure. Answer: Thanks for your comment. We have added the legend part to illustrate the meanings of different lines and marks as showed in Fig 7 and Fig 8 of the revised manuscript. 9.Conclusions should be drawn back to the original text and it is suggested to indicate from which part each conclusion was drawn. For example, numerical simulation experiments show that overburden movement shows obvious "three zones......" Answer: Thanks for your comment. We have revised the conclution and indicated from which part each conclusion was drawn, as showed in the conclution part of the revised manuscript. Modify “Under normal mining conditions, overburden movement displays obvious three-zone characteristics and presents trapezoidal subsidence, and the influence distance of mining stress in advance of working face is about 20 m. Under through-the-fault mining conditions, affected by the inherent characteristics of fault, the stress increases abnormally near the fault. Fault slip and dislocation cause overburden load to transfer to both sides of the fault. Abnormal stress accumulation occurs, and the “three zone” characteristics of overburden movement basically disappear. The hanging wall subsides in the form of inverted triangle, and the influence distance of the advance mining stress on the working face is about 30 m from the fault.” to “Similar experiments show that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement basically disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advance mining stress on the working face is extended from 20m to 30m.” Modify “In terms of the roadway under the influence of fault, the reinforced support has a better supporting effect, which verifies the accuracy of the conclusion.” to “The engineering application shows that the reinforced support has a good support effect for the roadway under the influence of the fault in the mining process of the working face.” 10.The format of 24 references is not correct. Answer: Thanks for your comment. We have revised the manuscript to the requirements of our journal as showed in the reference part of the revised manuscript. Submitted filename: Responses to reviewers.docx Click here for additional data file. 16 Nov 2021
PONE-D-21-26499R1
Study on overburden failure law and surrounding rock deformation control technology of mining through fault
PLOS ONE Dear Dr. ZHOU, Thank you for submitting your manuscript to PLOS ONE. After careful consideration, we feel that it has merit but does not fully meet PLOS ONE’s publication criteria as it currently stands. Therefore, we invite you to submit a revised version of the manuscript that addresses the points raised during the review process. In particular, reviewers pointed out that the paper's novelty should be clarified. Moreover they also highlight the need of clarifying some technical steps. I encourage the authors in carefully following the reviewers suggestions, since I think that they will greatly improve the paper. Please submit your revised manuscript by Dec 31 2021 11:59PM. If you will need more time than this to complete your revisions, please reply to this message or contact the journal office at plosone@plos.org. When you're ready to submit your revision, log on to https://www.editorialmanager.com/pone/ and select the 'Submissions Needing Revision' folder to locate your manuscript file. Please include the following items when submitting your revised manuscript:
If you would like to make changes to your financial disclosure, please include your updated statement in your cover letter. Guidelines for resubmitting your figure files are available below the reviewer comments at the end of this letter. A rebuttal letter that responds to each point raised by the academic editor and reviewer(s). You should upload this letter as a separate file labeled 'Response to Reviewers'. A marked-up copy of your manuscript that highlights changes made to the original version. You should upload this as a separate file labeled 'Revised Manuscript with Track Changes'. An unmarked version of your revised paper without tracked changes. You should upload this as a separate file labeled 'Manuscript'. If applicable, we recommend that you deposit your laboratory protocols in protocols.io to enhance the reproducibility of your results. Protocols.io assigns your protocol its own identifier (DOI) so that it can be cited independently in the future. For instructions see: https://journals.plos.org/plosone/s/submission-guidelines#loc-laboratory-protocols. Additionally, PLOS ONE offers an option for publishing peer-reviewed Lab Protocol articles, which describe protocols hosted on protocols.io. Read more information on sharing protocols at https://plos.org/protocols?utm_medium=editorial-email&utm_source=authorletters&utm_campaign=protocols. We look forward to receiving your revised manuscript. Kind regards, Fabio Trippetta, Ph.D. Academic Editor PLOS ONE Journal Requirements: Please review your reference list to ensure that it is complete and correct. If you have cited papers that have been retracted, please include the rationale for doing so in the manuscript text, or remove these references and replace them with relevant current references. Any changes to the reference list should be mentioned in the rebuttal letter that accompanies your revised manuscript. If you need to cite a retracted article, indicate the article’s retracted status in the References list and also include a citation and full reference for the retraction notice. [Note: HTML markup is below. Please do not edit.] Reviewers' comments: Reviewer's Responses to Questions Comments to the Author 1. If the authors have adequately addressed your comments raised in a previous round of review and you feel that this manuscript is now acceptable for publication, you may indicate that here to bypass the “Comments to the Author” section, enter your conflict of interest statement in the “Confidential to Editor” section, and submit your "Accept" recommendation. Reviewer #1: (No Response) Reviewer #2: All comments have been addressed ********** 2. Is the manuscript technically sound, and do the data support the conclusions? The manuscript must describe a technically sound piece of scientific research with data that supports the conclusions. Experiments must have been conducted rigorously, with appropriate controls, replication, and sample sizes. The conclusions must be drawn appropriately based on the data presented. Reviewer #1: Yes Reviewer #2: Yes ********** 3. Has the statistical analysis been performed appropriately and rigorously? Reviewer #1: Yes Reviewer #2: Yes ********** 4. Have the authors made all data underlying the findings in their manuscript fully available? The PLOS Data policy requires authors to make all data underlying the findings described in their manuscript fully available without restriction, with rare exception (please refer to the Data Availability Statement in the manuscript PDF file). The data should be provided as part of the manuscript or its supporting information, or deposited to a public repository. For example, in addition to summary statistics, the data points behind means, medians and variance measures should be available. If there are restrictions on publicly sharing data—e.g. participant privacy or use of data from a third party—those must be specified. Reviewer #1: Yes Reviewer #2: Yes ********** 5. Is the manuscript presented in an intelligible fashion and written in standard English? PLOS ONE does not copyedit accepted manuscripts, so the language in submitted articles must be clear, correct, and unambiguous. Any typographical or grammatical errors should be corrected at revision, so please note any specific errors here. Reviewer #1: Yes Reviewer #2: Yes ********** 6. Review Comments to the Author Please use the space provided to explain your answers to the questions above. You may also include additional comments for the author, including concerns about dual publication, research ethics, or publication ethics. (Please upload your review as an attachment if it exceeds 20,000 characters) Reviewer #1: 1. Please continuously clarify the novelty of the MS because the MS does not well show the novelty. 2. please check the reliability of result of 2.32m. In eq.20, the values of s shows 0.1 and 0.01, please check it. 3. It is suggested to remove the author marks of equally contuibution. Reviewer #2: All the revisions are addressed. What's the groundwater impact the fault movement? does it influnce you results? ********** 7. PLOS authors have the option to publish the peer review history of their article (what does this mean?). If published, this will include your full peer review and any attached files. If you choose “no”, your identity will remain anonymous but your review may still be made public. Do you want your identity to be public for this peer review? For information about this choice, including consent withdrawal, please see our Privacy Policy. Reviewer #1: No Reviewer #2: No [NOTE: If reviewer comments were submitted as an attachment file, they will be attached to this email and accessible via the submission site. Please log into your account, locate the manuscript record, and check for the action link "View Attachments". If this link does not appear, there are no attachment files.] While revising your submission, please upload your figure files to the Preflight Analysis and Conversion Engine (PACE) digital diagnostic tool, https://pacev2.apexcovantage.com/. PACE helps ensure that figures meet PLOS requirements. To use PACE, you must first register as a user. Registration is free. Then, login and navigate to the UPLOAD tab, where you will find detailed instructions on how to use the tool. If you encounter any issues or have any questions when using PACE, please email PLOS at figures@plos.org. Please note that Supporting Information files do not need this step.
19 Nov 2021 Dear Editors and Reviewers, Thank you very much for your careful review of our paper. Those comments are all valuable and very helpful for revising and improving our paper, as well as the important guiding significance to our researches. We have revised the manuscript in response to your suggestions and questions. All the modifications made according to reviewer’s comments are highlighted in yellow and using track changes in the manuscript. Our responses are also outlined below following your comments. I hope the revised manuscript is acceptable for publication in our journal. Sincerely, Yuejin Zhou, Ph. D. Corresponding author for the manuscript Ref: PONE-D-21-26499R1 Title: Study on overburden failure law and surrounding rock deformation control technology of mining through fault Journal: PLOS ONE Reviewer #1: 1. Please continuously clarify the novelty of the MS because the MS does not well show the novelty. Answer: Thanks for your comment. Aiming at the influence of mining face excavation on the roadway through fault, the geological strength index (GSI) was introduced to obtain the basis for judging the instability of the surrounding rock of the roadway through fault, and combined with two different similar tests to analyze the scope of roadway instability and the failure law of overlying rock masses. According to the conclusions obtained, the roadway support scheme is designed. This study shows that: 1) Through the introduction of GSI, it is found that the instability range of roadway surrounding rock is exponentially correlated with the rupture degree of surrounding rock. On this basis, the critical instability range of roadway surrounding rock is deduced to be 2.32m. 2) Compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement basically disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advance mining stress on the working face is extended from 20m to 30m. 3) According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support design. 2. please check the reliability of result of 2.32m. In eq.20, the values of s shows 0.1 and 0.01, please check it. Answer: Thank you very much for your careful review of our paper. The value of s is 0.01, we are very sorry that we missed the number when editing the formula. The overall calculation result is correct. and the specific calculation results are written in the file of“Responses to reviewers” . 3. It is suggested to remove the author marks of equally contuibution. Answer: Thank you for this suggestion. We have removed the author marks of equally contuibution. Reviewer #2: 1. What's the groundwater impact the fault movement? does it influnce your results? Answer: Thanks for your comment. This paper studies the impact of mining face excavation on the roadway through fault. The activation of faults is mainly caused by mining face excavation, and the influence of groundwater in this process is small and does not influnce the results. Submitted filename: Responses to reviewers.docx Click here for additional data file. 2 Dec 2021
PONE-D-21-26499R2
Study on overburden failure law and surrounding rock deformation control technology of mining through fault
PLOS ONE Dear Dr. ZHOU, Thank you for submitting your manuscript to PLOS ONE. After careful consideration, we feel that it has merit but does not fully meet PLOS ONE’s publication criteria as it currently stands. Therefore, we invite you to submit a revised version of the manuscript that addresses the points raised during the review process. I noticed that the author answered to the reviewer's comment only in the "Responses to reviewers" file. However the "Revised Manuscript with Track Changes" show no changes with respect to the previous version. I would like to highlight that if a reviewer ask a question this means that that message is not clear along the paper and, thus, the answer should be added to the paper in order to clarify that point. 
 
Consequently, I suggest the authors to clarify the questions raised by the reviewers directly in the paper. For clarity I report again the previous main reviewers points:
 
1. Please continuously clarify the novelty of the MS because the MS does not well show the novelty.
2. What's the groundwater impact the fault movement? does it influnce your results?
Please submit your revised manuscript by Jan 16 2022 11:59PM. If you will need more time than this to complete your revisions, please reply to this message or contact the journal office at plosone@plos.org. When you're ready to submit your revision, log on to https://www.editorialmanager.com/pone/ and select the 'Submissions Needing Revision' folder to locate your manuscript file. Please include the following items when submitting your revised manuscript:
If you would like to make changes to your financial disclosure, please include your updated statement in your cover letter. Guidelines for resubmitting your figure files are available below the reviewer comments at the end of this letter. A rebuttal letter that responds to each point raised by the academic editor and reviewer(s). You should upload this letter as a separate file labeled 'Response to Reviewers'. A marked-up copy of your manuscript that highlights changes made to the original version. You should upload this as a separate file labeled 'Revised Manuscript with Track Changes'. An unmarked version of your revised paper without tracked changes. You should upload this as a separate file labeled 'Manuscript'. If applicable, we recommend that you deposit your laboratory protocols in protocols.io to enhance the reproducibility of your results. Protocols.io assigns your protocol its own identifier (DOI) so that it can be cited independently in the future. For instructions see: https://journals.plos.org/plosone/s/submission-guidelines#loc-laboratory-protocols. Additionally, PLOS ONE offers an option for publishing peer-reviewed Lab Protocol articles, which describe protocols hosted on protocols.io. Read more information on sharing protocols at https://plos.org/protocols?utm_medium=editorial-email&utm_source=authorletters&utm_campaign=protocols. We look forward to receiving your revised manuscript. Kind regards, Fabio Trippetta, Ph.D. Academic Editor PLOS ONE [Note: HTML markup is below. Please do not edit.] Reviewers' comments: [NOTE: If reviewer comments were submitted as an attachment file, they will be attached to this email and accessible via the submission site. Please log into your account, locate the manuscript record, and check for the action link "View Attachments". If this link does not appear, there are no attachment files.] While revising your submission, please upload your figure files to the Preflight Analysis and Conversion Engine (PACE) digital diagnostic tool, https://pacev2.apexcovantage.com/. PACE helps ensure that figures meet PLOS requirements. To use PACE, you must first register as a user. Registration is free. Then, login and navigate to the UPLOAD tab, where you will find detailed instructions on how to use the tool. If you encounter any issues or have any questions when using PACE, please email PLOS at figures@plos.org. Please note that Supporting Information files do not need this step.
7 Dec 2021 Dear Editors and Reviewers, Thank you very much for your reminder, and thank you very much for your careful review of our paper. Those comments are all valuable and very helpful for revising and improving our paper, as well as the important guiding significance to our researches. We have revised the manuscript in response to your suggestions and questions. All the modifications made according to the reviewer’s comments are highlighted in yellow and using track changes in the manuscript. Our responses are also outlined below following your comments. I hope the revised manuscript is acceptable for publication in our journal. Finally, thank you again for your reminders and comments. Sincerely, Yuejin Zhou, Ph. D. Corresponding author for the manuscript Ref: PONE-D-21-26499 Title: Study on overburden failure law and surrounding rock deformation control technology of mining through fault Journal: PLOS ONE Reviewer #1: 1. Please continuously clarify the novelty of the MS because the MS does not well show the novelty. Answer: Thanks for your comment. Your comment is very helpful for revising and improving our paper. We have revised the abstract section to better express the novelty of the MS in lines 11-15 and line 22 of the revised manuscript. The revised summary section is as follows: In the mining process of working face, the additional stress generated by the fault changes the law of roadway deformation and failure as well as the law of overburden failure. Aiming at the influence of the fault in the mining process of working face, this study introduced the geological strength index (GSI) to analyze the stress distribution in the elastic-plastic zone of the surrounding rock of the roadway. And similar experiments under different engineering backgrounds were combined to study the characteristics of overburden movement and stress evolution. Based on the conclusions obtained, the roadway support scheme was designed. This study shows that, compared with ordinary mining, through-the-fault mining causes slippage and dislocation of the fault, the load of the overburden is transferred to both sides of the fault, and the stress near the fault accumulates abnormally. The “three zones” characteristics of the overburden movement disappear, the subsidence pattern is changed from "trapezoid" to "inverted triangle", and the influence distance of the advanced mining stress on the working face is extended from 20m to 30m. The instability range of roadway surrounding rock is exponentially correlated with the rupture degree of the surrounding rock. Through the introduction of GSI, the critical instability range of roadway surrounding rock is deduced to be 2.32m. According to the conclusion, the bolt length and roadway reinforced support length are redesigned. Engineering application shows that the deformation rate of the roadway within 60 days is controlled below 0.1~0.5mm/d, the deformation amount is controlled within 150mm, and the roadway deformation is controlled, which generally meets the requirements of use. The research results provide guidance and reference for similar roadway support. 2. please check the reliability of result of 2.32m. In eq.20, the values of s shows 0.1 and 0.01, please check it. Answer: Thank you very much for your careful review of our paper. The value of s is 0.01, we are very sorry that we missed the number when editing the formula. The overall calculation result is correct. And the specific calculation results are written in the file of“Responses to reviewers” . 3. It is suggested to remove the author marks of equally contuibution. Answer: Thank you for this suggestion. After our discussion, we have removed the author marks of equally contuibution in line 3 of the revised manuscript. Reviewer #2: 1. What's the groundwater impact the fault movement? does it influnce your results? Answer: Thanks for your comment. Your comment is very valuable for revising our paper. Generally, when a fault zone connects to aquifers, groundwater will spread to the fault. The pressure of pore fluid in the fault zone will increase, and the friction strength of the fault will decrease, which will accelerate fault instability. For this study, since the fault has a small drop and does not connect to the aquifer, the excavation of the working face under the influence of the fault is the main reason for roadway instability, so the groundwater is not considered. We have added relevant explanations in lines 188-190 of the revised manuscript. The distribution law of fault stress under the influence of groundwater, involves water-sediment seepage, the hydration reaction of fault, and the impact on roadway instability. We are researching these aspects, and we have achieved some results so far. We hope to publish relevant research results on PLOS ONE in the future. Submitted filename: Responses to reviewers.docx Click here for additional data file. 20 Dec 2021 Study on overburden failure law and surrounding rock deformation control technology of mining through fault PONE-D-21-26499R3 Dear Dr. ZHOU, We’re pleased to inform you that your manuscript has been judged scientifically suitable for publication and will be formally accepted for publication once it meets all outstanding technical requirements. Within one week, you’ll receive an e-mail detailing the required amendments. When these have been addressed, you’ll receive a formal acceptance letter and your manuscript will be scheduled for publication. An invoice for payment will follow shortly after the formal acceptance. To ensure an efficient process, please log into Editorial Manager at http://www.editorialmanager.com/pone/, click the 'Update My Information' link at the top of the page, and double check that your user information is up-to-date. If you have any billing related questions, please contact our Author Billing department directly at authorbilling@plos.org. If your institution or institutions have a press office, please notify them about your upcoming paper to help maximize its impact. If they’ll be preparing press materials, please inform our press team as soon as possible -- no later than 48 hours after receiving the formal acceptance. Your manuscript will remain under strict press embargo until 2 pm Eastern Time on the date of publication. For more information, please contact onepress@plos.org. Kind regards, Fabio Trippetta, Ph.D. Academic Editor PLOS ONE Additional Editor Comments (optional): Reviewers' comments: 10 Jan 2022 PONE-D-21-26499R3 Study on overburden failure law and surrounding rock deformation control technology of mining through fault Dear Dr. Zhou: I'm pleased to inform you that your manuscript has been deemed suitable for publication in PLOS ONE. Congratulations! Your manuscript is now with our production department. If your institution or institutions have a press office, please let them know about your upcoming paper now to help maximize its impact. If they'll be preparing press materials, please inform our press team within the next 48 hours. Your manuscript will remain under strict press embargo until 2 pm Eastern Time on the date of publication. For more information please contact onepress@plos.org. If we can help with anything else, please email us at plosone@plos.org. Thank you for submitting your work to PLOS ONE and supporting open access. Kind regards, PLOS ONE Editorial Office Staff on behalf of Prof. Fabio Trippetta Academic Editor PLOS ONE
  1 in total

1.  Prediction of water inflow from fault by particle swarm optimization-based modified grey models.

Authors:  Dan Ma; Hongyu Duan; Wenxuan Li; Jixiong Zhang; Weitao Liu; Zilong Zhou
Journal:  Environ Sci Pollut Res Int       Date:  2020-07-23       Impact factor: 4.223

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.