| Literature DB >> 34885450 |
Abstract
A circular economy requires closed circuits of consumed resources. Construction generates approximately 50% of solid waste globally, which is difficult to manage. The aim of this article was to identify the factors that determine the development of circular construction in the context of waste minimisation in the life cycle of building structures. The identification of cause-and-effect relationships by means of the DEMATEL method allows the problems of construction waste management to be taken into account in the context of the development of sustainable construction and fulfilling the principles of the circular economy.Entities:
Keywords: circular construction; circular economy; construction waste; sustainable development
Year: 2021 PMID: 34885450 PMCID: PMC8658276 DOI: 10.3390/ma14237296
Source DB: PubMed Journal: Materials (Basel) ISSN: 1996-1944 Impact factor: 3.623
Figure 13D model of an ILCD [38].
Figure 2Durability in circular economy.
Figure 3Waste minimisation from lean production concept.
Direct influence matrix.
| integrated/multi-criteria structural design | easily adaptable to changing usage requirements | minimize construction activities during the operational phase | extending the life cycle of buildings | interdisciplinary project teams | durability/quality of material and structure | materials/products that are easy to separate, repair and recover | distribution of secondary materials and products | demand for recycled materials and products | Minimization of construction waste | lean construction | knowledge and practice in waste management | waste segregation | waste quality | conditions of the construction site and its surroundings | recyclers | waste management costs and prices of recycled products | building deconstruction | waste recovery | BIM technology in the full life cycle | socio-economic trends | development of recovery techniques and technologies | investment capital | financial and non-financial submeasures | building certification | environmental product declarations | knowledge transfer | time-cost-quality requirements of the investor | societal beliefs about recovery | investment demand/ construction speed | market for low-cost technologies/building materials with low quality/low recovery potential | environmental protection requirements | complex investment path for waste management facilities | circular economy in construction | |
| integrated/multi-criteria structural design | 0 | 3 | 0 | 0 | 0 | 3 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| easily adaptable to changing usage requirements | 0 | 0 | 2 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| minimize construction activities during the operational phase | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| extending the life cycle of buildings | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| interdisciplinary project teams | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| durability/quality of material and structure | 0 | 0 | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| materials/products that are easy to separate, repair and recover | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| distribution of secondary materials and products | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 |
| demand for recycled materials and products | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 |
| Minimization of construction waste | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 |
| lean construction | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| knowledge and practice in waste management | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 3 | 3 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| waste segregation | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| waste quality | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 |
| conditions of the construction site and its surroundings | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 2 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| recyclers | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| waste management costs and prices of recycled products | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| building deconstruction | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| waste recovery | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 |
| BIM technology in the full life cycle | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| socio-economic trends | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 1 | 0 | 2 | 3 | 1 | 2 | 2 | 0 | 0 |
| development of recovery techniques and technologies | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| investment capital | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
| financial and non-financial submeasures | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 |
| building certification | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| environmental product declarations | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 |
| knowledge transfer | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| time-cost-quality requirements of the investor | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 3 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| societal beliefs about recovery | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 |
| investment demand/ construction speed | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 |
| market for low-cost technologies/building materials with low quality/low recovery potential | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 |
| environmental protection requirements | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 | 0 |
| complex investment path for waste management facilities | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| circular economy in construction | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
“Prominence” (R+C), and the “relation” (C−R).
| Factor | C+R | C−R |
|---|---|---|
| Integrated/multi-criteria structural design | 1.7213 | 0.24107 |
| Easily adaptable to changing usage requirements | 0.8107 | 0.06486 |
| Minimize construction activities during the operational phase | 0.5659 | −0.2189 |
| Extending the life cycle of buildings | 0.7506 | −0.2302 |
| Interdisciplinary project teams | 0.4246 | 0.42456 |
| Durability/quality of material and structure | 0.7207 | −0.0251 |
| Materials/products that are easy to separate, repair and recover | 1.6899 | −0.1041 |
| Distribution of secondary materials and products | 1.9235 | −0.9825 |
| Demand for recycled materials and products | 2.0802 | −0.6688 |
| Minimization of construction waste | 1.4567 | −1.0281 |
| Lean construction | 0.3952 | −0.0481 |
| Knowledge and practice in waste management | 1.1936 | 1.19363 |
| Waste segregation | 1.5398 | −0.2892 |
| Waste quality | 1.2300 | −0.0191 |
| Conditions of the construction site and its surroundings | 0.6925 | 0.69249 |
| Recyclers | 1.8481 | 0.00016 |
| Waste management costs and prices of recycled products | 2.3121 | −0.3756 |
| Building deconstruction | 1.5355 | −0.8388 |
| Waste recovery | 2.8024 | −1.7436 |
| Bim technology in the full life cycle | 0.8602 | −0.2419 |
| Socio-economic trends | 1.7668 | 1.76685 |
| Development of recovery techniques and technologies | 1.2954 | 0.37285 |
| Investment capital | 0.4425 | 0.44253 |
| Financial and non-financial submeasures | 0.9006 | 0.47198 |
| Building certification | 0.5023 | 0.5023 |
| Environmental product declarations | 0.7482 | 0.3196 |
| Knowledge transfer | 0.5801 | 0.58013 |
| Time-cost-quality requirements of the investor | 2.0848 | 0.27588 |
| Societal beliefs about recovery | 1.5632 | 0.32328 |
| Investment demand/ construction speed | 0.6897 | 0.54688 |
| Market for low-cost technologies/building materials with low quality/low recovery potential | 0.9093 | 0.16431 |
| Environmental protection requirements | 0.7719 | 0.48615 |
| Complex investment path for waste management facilities | 0.6508 | 0.1610 |
| Circular economy in construction | 2.2165 | −2.2165 |
Figure 4Relationships between factors.
Figure 5Relationship factor and prominence diagram.