| Literature DB >> 33937419 |
Daem Roshani1, Aram Karimian2.
Abstract
OBJECTIVE: To assess the preparedness of Iranian hospitals against earthquake.Entities:
Keywords: Earthquakes; Hospitals; Iran
Year: 2021 PMID: 33937419 PMCID: PMC8062888 DOI: 10.30476/BEAT.2021.86968
Source DB: PubMed Journal: Bull Emerg Trauma ISSN: 2322-2522
Fig. 1PRISMA flow diagram. PRISMA: Preferred Reporting Items for Systematic Reviews and Meta-Analysis
Distribution of Eleven Preparation Percentages of Hospital Preparedness against Earthquake by Author Name, Year and Number of Hospitals
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Arab ( | 2008 | 15 | 0.6118 | 0.5511 | 0.4708 | 0.3741 | 0.45 | 0.4002 | 0.3754 | 0.5669 | 0.4954 | ||
| Daneshmandi ( | 2010 | 30 | 0.80 | 0.702 | 0.686 | 0.488 | 0.443 | 0.544 | |||||
| mohammadi yeganeh ( | 2011 | 7 | 0.5457 | 0.29 | 0.14 | ||||||||
| Hekmatkhah ( | 2012 | 10 | 0.4417 | 0.4118 | 0.20 | 0.437 | 0.528 | 0.625 | 0.2138 | 0.1684 | 0.207 | ||
| Rabeian ( | 2013 | 4 | 0.8725 | 0.72 | 0.55 | 0.40 | 0.4125 | 0.28 | 0.495 | 0.415 | 0.5181 | ||
| Afkar ( | 2013 | 19 | 0.43 | 0.43 | 0.26 | 0.43 | 0.64 | 0.83 | 0.66 | 0.59 | |||
| Asadzadeh ( | 2014 | 22 | 0.338 | ||||||||||
| hosseini shokouh ( | 2014 | 15 | 0.955 | 0.972 | 0.791 | 0.833 | 0.933 | 0.566 | 0.812 | 0.912 | 0.855 | ||
| Heidaranlu( | 2016 | 8 | 0.6375 | ||||||||||
| Abedi ( | 2017 | 4 | 0.8908 | 0.67 | 0.39 | 0.38 | 0.25 | 0.26 | 0.33 | 0.33 | 0.5887 |
Integrated percentages of hospital preparedness components against earthquake with 95% confidence interval
|
|
|
|
|
|
|
| |
|---|---|---|---|---|---|---|---|
|
|
| ||||||
| 0.688 | 0.231 | 0.455 | 0.0013 | 74.8% | 19.837 | 67 | Construction mitigation |
| 0.707 | 0.346 | 0.528 | 0.0368 | 57.8% | 11.857 | 67 | Safety of equipment and hazardous materials |
| 0.665 | 0.317 | 0.490 | 0.0017 | 69.6% | 23.041 | 104 | Hospital evacuation and field treatment |
| 0.650 | 0.326 | 0.487 | 0.0059 | 64.7% | 19.854 | 104 | Necessary medical and nonmedical equipment |
| 0.697 | 0.267 | 0.480 | 0.004 | 71% | 17.255 | 67 | Hospital environmental health proceedings |
| 0.736 | 0.323 | 0.533 | 0.0002 | 77.3% | 26.472 | 97 | Hospital curriculum program |
| 0.881 | 0.499 | 0.709 | 0.0022 | 73.3% | 18.734 | 82 | Disaster plan management |
| 0.875 | 0.406 | 0.662 | 0.0003 | 78.8% | 23.541 | 67 | Support for critical services |
| 0.804 | 0.353 | 0.588 | 0.8382 | *% | 0.041 | 15 | Non-Structural Vulnerabilities |
| 0.619 | 0.340 | 0.479 | 0.412 | *% | 0.673 | 46 | Human resource |
| 0.564 | 0.376 | 0.470 | 0.4135 | 1.4% | 6.087 | 100 | Overall preparedness |
Fig 2Forest plot with 95%CI for pooled proportion of Disaster plan management, Construction mitigation and overall preparedness
Fig 3Funnel plot detecting biases in the identification and selection of studies