Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China.

Ruibo Hu1, Ke Chen2, Weiya Chen3, Qiankun Wang4, Hanbin Luo5.   

Abstract

Estimation of construction waste generation (CWG) at the field scale is a crucial but challenging task for effective construction waste management (CWM). Extant field-scale CWG modeling approaches have faced difficulties in obtaining accurate results due to a lack of detailed CWG data, and most of them fail to consider the complex relationship among predictive variables. This study attempts to tackle this issue by proposing a novel CWG modeling approach that integrates improved on-site measurement (IOM) and a support vector machine (SVM)-based prediction model. To achieve this goal, 206 ongoing commercial construction sites were investigated to obtain the predictor values and waste generation rates (WGRs) of five types of waste (i.e., inorganic nonmetallic waste, organic waste, metal waste, composite waste, and hazardous waste) generated at three construction stages (i.e., the understructure stage, superstructure stage, and finishing stage). The data were introduced to the SVM to develop the relationships between predictive variables and WGRs. An actual commercial building under construction was used to demonstrate the applicability of the proposed approach. The results showed that the superiority of the IOM can be used as a basis to implement robust CWG data collection. In addition, the SVM-based WGR prediction model (SWPM) can obtain more accurate prediction results (R2 = 86.87%) than the back-propagation neural network (R2 = 75.14%) and multiple linear regression (R2 = 61.93%).
Copyright © 2021 Elsevier Ltd. All rights reserved.

Entities:  

Keywords:  Construction waste management; On-site measurement; Prediction; Support vector machine; Waste generation rate

Year:  2021        PMID: 33894559     DOI: 10.1016/j.wasman.2021.04.012

Source DB:  PubMed          Journal:  Waste Manag        ISSN: 0956-053X            Impact factor:   7.145


  2 in total

1.  Design and development of smart Internet of Things-based solid waste management system using computer vision.

Authors:  Senthil Sivakumar Mookkaiah; Gurumekala Thangavelu; Rahul Hebbar; Nipun Haldar; Hargovind Singh
Journal:  Environ Sci Pollut Res Int       Date:  2022-04-27       Impact factor: 5.190

2.  Nonlinear Dynamic Response Analysis of a Three-Stage Gear Train Based on Lightweight Calculation for Edge Equipment.

Authors:  Dongdong Ren; Yangwu Yao; Huiyuan Wang; Huixian Qu; Guoqiang Wang
Journal:  Comput Intell Neurosci       Date:  2022-08-21
  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.