| Literature DB >> 32795375 |
Jean-Baptiste Rayaisse1, Fabrice Courtin2,3, Mahamat Hisséne Mahamat4, Mahamat Chérif4, Wilfrid Yoni1, Nadmba M O Gadjibet4, Mallaye Peka5, Philippe Solano3, Steve J Torr6, Alexandra P M Shaw7,8.
Abstract
BACKGROUND: Since 2012, the World Health Organisation and the countries affected by the Gambian form of human African trypanosomiasis (HAT) have been committed to eliminating the disease, primarily through active case-finding and treatment. To interrupt transmission of Trypanosoma brucei gambiense and move more rapidly towards elimination, it was decided to add vector control using 'tiny targets'. Chad's Mandoul HAT focus extends over 840 km2, with a human population of 39,000 as well as 14,000 cattle and 3000 pigs. Some 2700 tiny targets were deployed annually from 2014 onwards.Entities:
Keywords: Chad; Cost; Human African trypanosomiasis; Mandoul; Tiny targets; Tsetse control
Mesh:
Substances:
Year: 2020 PMID: 32795375 PMCID: PMC7427721 DOI: 10.1186/s13071-020-04286-w
Source DB: PubMed Journal: Parasit Vectors ISSN: 1756-3305 Impact factor: 3.876
Fig. 1The Mandoul HAT focus
Fig. 2Cattle in the Mandoul HAT focus. a Mbororo transhumant cattle grazing in marshland. b Sedentary cattle used for animal traction
Fig. 3Schedule of work for which costs were collected and analysed
Timing and duration of field activities
| Activity | Timing | Trip duration (days) | Description |
|---|---|---|---|
| Preliminary tsetse survey T0 | October–November 2013 | 30 | Traps deployed at 108 sites |
| Initial sensitisation | December 2013 | 15 | Radio spot produced and broadcast. Creation of CSSEsa |
| Period before cost monitoring started | January–November 2014 | – | First deployment January 2014, trap monitoring T1, T2 and T3 in March, May and October 2014 |
| Re-sensitisation | December 2014 | 9 | Sensitisation campaign and revitalization of CSSEs |
| Target redeployment | January-February 2015 | 17 | 2600 targets replaced and 108 extra deployed, making a total of 2708 |
| Trap monitoring T4 | March–April 2015 | 15 | Traps deployed at 44 sites |
| Sensitisation | March 2015 | 8 | Sensitisation targeting transhumant pastoralist populations |
| Trap monitoring T5 | May 2015 | 14 | Traps deployed at 44 sites |
| Trap monitoring T6 | October 2015 | 13 | Traps deployed at 44 sites |
| Target redeployment | January–February 2016 | 25 | 2708 targets replaced |
| Trap monitoring T7 | March 2016 | 11 | Traps deployed at 44 sites |
| Trap monitoring T8 | May 2016 | 17 | Traps deployed at 44 sites |
| Target check | September 2016 | 7 | Placement and condition of deployed targets checked |
| Trap monitoring T9 | October 2016 | 13 | Traps deployed at 44 sites |
a “Comités de suivi et de sauvegarde des écrans”, committees for monitoring and safeguarding of targets
Field travel days for staff from the research institutes
| Activity | 2013a | 2015b | 2016 | |||
|---|---|---|---|---|---|---|
| No. of staff | Person days | No. of staff | Person days | No. of staff | Person days | |
| Tsetse surveys and monitoring | 9 | 282 | 3 | 128 | 3–4 | 151 |
| Sensitisation | 5 | 75 | 2 | 34 | – | – |
| Deployment | – | – | 4 | 74 | 4 | 94 |
| Maintenance | – | – | – | – | 5 | 33 |
| Total | – | 357 | – | 236 | – | 278 |
aPreparatory work before target deployment undertaken
bSensitisation to prepare for the January 2015 target deployment was undertaken in December2014
cThere were three monitoring field trips each year in 2015 and 2016
Fig. 4Target deployment
Fig. 5Accessing target deployment and trap monitoring sites by canoe (note the biconical trap just behind the canoe)
Cost of initial tsetse survey and subsequent monitoring using traps
| Item (percentage of average monitoring round’s costs) | 2013 | 2015 | 2016 | Average cost per monitoring round (USD) |
|---|---|---|---|---|
| Specialised equipment (0.6%) | ||||
| Traps (depreciation)a | 114 | 126 | 126 | 42 |
| Trap cages and sleeves | 14 | 24 | 14 | 6 |
| Transport (24.2%) | ||||
| Vehicle hireb | 2403 | 3946 | 3794 | 1293 |
| Fuel | 2040 | 2000 | 1235 | 539 |
| Vehicle maintenance charge and repairsb | 582 | – | – | – |
| Canoe hire | – | 9 | 24 | 6 |
| Motorcycle hire | 540 | – | 17 | – |
| Staff (58.1%) | ||||
| Share of staff salaries | 11,047 | 5464 | 6223 | 1948 |
| Travel allowances | 13,153 | 6476 | 8331 | 2468 |
| Local labour (2.1%) | ||||
| Supervisors, guards and field assistants | 354 | 498 | 438 | 156 |
| Village chiefs | 337 | – | – | – |
| Administrative support (11.8%) | 3996 | 2697 | 2697 | 899 |
| Consumables and equipment (3.2%) | ||||
| GPS sets (depreciation) | 82 | 122 | 122 | 41 |
| GPS sets batteries | 71 | 101 | 57 | 26 |
| Fuel for generatorc | 303 | 191 | – | 32 |
| Electrical supplies, hammers and stationery | 339 | – | – | – |
| Gas bottle refills, grease | 30 | 16 | 28 | 7 |
| Sundries (including internet, medical supplies) | 571 | 420 | 376 | 133 |
| Total | 35,977 | 22,090 | 23,482 | 7595 |
| Cost per km2 protected | 42.8 | 26.3 | 28.0 | 9.0 |
a30 traps were used for regular monitoring and 45 for the initial tsetse survey
bFor the initial survey two IRED vehicles were used, in addition to the hired vehicle. Thus, hire charges were estimated as explained under methods and the costs include a repair plus the lump sum running cost charge made for using those vehicles
cDuring 2016 the local area electricity generator was functional, so no generator was needed by the team
Cost of preliminary sensitisation mission in 2013 and follow up operational missions in 2014 and 2015
| Item (percentage of total costs for 2014/2015 work) | 2013 | 2014/2015 |
|---|---|---|
| Specialised equipment (3.0%) | ||
| Distribution of leaflets and posters | 169 | 67 |
| Creation of radio broadcast in Arabic, French and Ngor | 422 | – |
| Cost of broadcasting on local radio stations | 379 | 127 |
| Transport (34.2%) | ||
| Vehicle hire | 1475 | 1762 |
| Fuel | 292 | 479 |
| Staff (50.1%) | ||
| Share of staff salaries | 3238 | 1560 |
| Travel allowances | 3794 | 1720 |
| Local labour (1.2%) | ||
| Supervisor | 278 | 76 |
| Administrative support (10.7%) | 982 | 688 |
| Consumables and equipmentb (0.9%) | ||
| Fuel for generator | 71 | 61 |
| Total | 11,117 | 6551 |
| Cost per km2 protected | 13.2 | 7.8 |
aPosters were only used in 2015
bGPS were sets not used for sensitisation field work
Cost of deploying targets
| Item (percentage of two years’ total costs) | 2015 | 2016 |
|---|---|---|
| Specialised equipment (25.8%) | ||
| Targetsa | 3000 | 3000 |
| Target insurance and freight | 1050 | 930 |
| Target assembly and fixing: cutting up 12,000 sticks and assembling of targets | 506 | 101 |
| String, wire and glue | 452 | 295 |
| Transport (14.4%) | ||
| Vehicle hire | 1973 | 2108 |
| Fuel | 422 | 547 |
| Canoe hire (5 days, from several jetties) | 84 | 84 |
| Staff (43.0%) | ||
| Share of staff salaries | 3188 | 3895 |
| Travel allowances | 3744 | 4755 |
| Local labour (3.8%) | ||
| Supervisor, guard | 110 | 599 |
| CSSEs incentive payments | – | 658 |
| Administrative support (9.1%) | 1599 | 1698 |
| Consumables and equipment (3.9%) | ||
| GPS sets (depreciation) | 68 | 68 |
| GPS sets batteries | 101 | 51 |
| Fuel for generator | 49 | 74 |
| Digital camera (depreciation) | 105 | 105 |
| Stationery (markers, batteries, etc.) | 68 | 9 |
| Machetes (depreciation, 2 year life) | 253 | 253 |
| Sundries, including internet | 84 | 134 |
| Total | 16,856 | 19,364 |
| Cost per km2 protected | 20.1 | 23.1 |
aThe number of targets actually deployed in 2015 and 2016 was 2708, as numbers were slightly increased from the original number of 2600 deployed in 2014 [21]. However, as 3000 targets were ordered, assembled, and paid for each year the full number is included here
Costs of target checking
| Item (percentage of total costs) | 2016 |
|---|---|
| Specialised equipment (0%) | |
| None, no targets were replaced | 0 |
| Transport (17.4%) | |
| Vehicle hire | 688 |
| Fuel | 187 |
| Canoe hire (5 days, several jetties) | 8 |
| Staff (66.6%) | |
| Share of staff salaries | 1484 |
| Travel allowances | 1906 |
| Local labour (1.0%) | |
| Supervisor | 51 |
| Administrative support (11.8%) | 599 |
| Consumables and equipment (3.2%) | |
| GPS sets (depreciation) | 10 |
| GPS sets batteries | 17 |
| Fuel for generator | 11 |
| Generator maintenance charge | 8 |
| Sundries | 116 |
| Total | 5085 |
| Cost per km2 protected | 6.1 |
Summary of costs for one year’s tsetse control by activity
| Activity | Average per year (USD) | % of expenditure | USD/km2 protected |
|---|---|---|---|
| Initial tsetse surveya | 7182 | 12.8 | 8.6 |
| Preliminary sensitisationa | 2220 | 4.0 | 2.6 |
| Tsetse monitoring | 22,741 | 40.6 | 27.1 |
| Target deployment | 18,082 | 32.3 | 21.6 |
| Target checking | 2538 | 4.5 | 3.0 |
| Sensitisation | 3270 | 5.8 | 3.9 |
| Total | 56,133 | 100.0 | 66.8 |
a20% of the cost of these preparatory activities is attributed to each year’s tsetse control operation
Summary of costs by category of expenditure
| Activity | Average per year (USD) | % of expenditure |
|---|---|---|
| Specialised equipment | 5129 | 9.1 |
| Vehicle costs | 11,150 | 19.9 |
| Staff Salaries | 13,763 | 24.5 |
| Staff field allowances | 16,856 | 30.0 |
| Community workers | 1408 | 2.5 |
| Administrative support | 5994 | 10.7 |
| Consumables and equipment | 1833 | 3.3 |
| Total | 56,133 | 100.0 |