| Literature DB >> 32787835 |
Seema Vyas1, John Songo2, Lorna Guinness3, Albert Dube2, Steffen Geis4,2,5, Thokozani Kalua6, Jim Todd4, Jenny Renju4, Amelia Crampin4,2, Alison Wringe4.
Abstract
BACKGROUND: Reaching the 90-90-90 targets requires efficient resource use to deliver HIV testing and treatment services. We investigated the costs and efficiency of HIV services in relation to HIV testing yield in rural Karonga District, Malawi.Entities:
Keywords: Costs; Financing, efficiency; HIV care and treatment; HIV testing services; Malawi
Mesh:
Year: 2020 PMID: 32787835 PMCID: PMC7422472 DOI: 10.1186/s12913-020-05446-5
Source DB: PubMed Journal: BMC Health Serv Res ISSN: 1472-6963 Impact factor: 2.655
Facility characteristics [source facility survey; HMIS]
| Facility | Size/typea | Authority | Number outpatient attendanceb | Location |
|---|---|---|---|---|
| Clinic A | Small clinic | Faith-based | 3437 | Remote rural |
| Clinic B | Large clinic | Public | 25,451 | Rural |
| Clinic C | Large clinic | Public | 17,778 | Remote rural |
| Hospital D | Small hospital | Faith-based | 5464 | Rural |
| Hospital E | Medium hospital | Public | 36,535 | Rural |
aFacility type classified by facility in-charge. Size classified by authors and is based on number of outpatient visits i.e. small clinic & small hospital < 10,000 outpatient visits per annum
bAnnual outpatient attendance from October 2016 to September 2017
Number of HIV tests conducted from October 2016 to September 2017
| Facility | No. staff / trained | No. FTE staff | No. FTE counsellorsa | Testing episodes | Confirmatory | New positive | Annual positivity rate |
|---|---|---|---|---|---|---|---|
| Clinic A | 4 / 3 | 1.0 | 0.6 | 520 | 26 | 19 | 3.7% |
| Clinic B | 9 / 9 | 4.0 | 4.0 | 3144 | 178 | 74 | 2.4% |
| Clinic C | 3 / 0 | 2.5 | 2.5 | 1916 | 64 | 36 | 1.9% |
| Hospital D | 13 / 0 | 4.2 | 4.0 | 3385 | 152 | 84 | 2.5% |
| Hospital E | 8 / 0 | 4.6 | 4.0 | 9544 | 553 | 240 | 2.5% |
aIncludes lay (volunteer) counsellors: 2 in Clinic C
Fig. 1Number of HIV testing episodes by health facility and by month
Annual HIV testing services costs; cost per testing episode (cost per test); and cost per HIV case diagnosed (cost per HIV) in 2017 US$ (October 2016 to September 2017)
| Clinic A | Clinic B | Clinic C | Hospital D | Hospital E | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Total cost | Cost per test | Cost per HIV | Total cost | Cost per test | Cost per HIV | Total cost | Cost per test | Cost per HIV | Total cost | Cost per test | Cost per HIV | Total cost | Cost per test | Cost per HIV | |
| Building | 115 | 0.22 | 6.04 | 14 | 0.00 | 0.19 | 22 | 0.01 | 0.60 | 26 | 0.01 | 0.30 | 215 | 0.02 | 0.90 |
| Equipment | 15 | 0.03 | 0.80 | 78 | 0.02 | 1.05 | 13 | 0.01 | 0.36 | 65 | 0.02 | 0.77 | 33 | 0.00 | 0.14 |
| Training | 393 | 0.76 | 20.69 | 1179 | 0.38 | 15.94 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0.00 | 0.00 |
| Personnel | 2109 | 4.06 | 111.02 | 5116 | 1.63 | 69.13 | 4615 | 2.41 | 128.21 | 7154 | 2.11 | 85.17 | 7537 | 0.79 | 31.40 |
| HIV test kits | 458 | 0.88 | 24.08 | 2800 | 0.89 | 37.84 | 1821 | 0.95 | 50.59 | 2954 | 0.87 | 35.17 | 8531 | 0.89 | 35.55 |
| Other supplies | 179 | 0.34 | 9.43 | 525 | 0.17 | 7.09 | 152 | 0.08 | 4.22 | 635 | 0.19 | 7.56 | 842 | 0.09 | 3.51 |
| Utilities & other | 433 | 0.83 | 22.82 | 81 | 0.03 | 1.09 | 35 | 0.02 | 0.98 | 155 | 0.05 | 1.84 | 678 | 0.07 | 2.82 |
| Supervision | 410 | 0.79 | 21.55 | 410 | 0.13 | 5.53 | 410 | 0.21 | 11.38 | 410 | 0.12 | 4.88 | 410 | 0.04 | 1.71 |
| M&E | 336 | 0.65 | 17.69 | 336 | 0.11 | 4.54 | 336 | 0.18 | 9.33 | 336 | 0.10 | 4.00 | 336 | 0.04 | 1.40 |
Fig. 2HIV testing resource input share of total HIV testing costs, and average cost per testing episode in US$. ($ figure overlaid in shaded bars is average cost per testing episode for resource input category)
Sensitivity analysis results and percent change in cost in HIV positive person diagnosed
| Parameter | Range from base estimate | 2017 US$ | % Change in cost | |
|---|---|---|---|---|
| Staff level | (−10% to + 10%) | 110.49 | 122.20 | +/− 5% |
| Annual positivity rate | (−10% to + 10%) | 129.28 | 105.77 | +/− 11% |
| Annual positivity ratea | 9% | 31.64 | − 73% | |
aAs observed elsewhere in Malawi by Mwenge et al. [16]
Fig. 3HIV testing resource input share of total HIV testing costs, and average cost per HIV case detected in $US in a Clinics versus hospital. b Public versus faith-based facilities. c Remote rural versus rural. ($ figure overlaid in shaded bars is average cost per HIV case diagnosed for resource input category)
HIV care and treatment service delivery (October 2016 to September 2017)
| Facility | No. ART staff / trained | No. FTE ART staff | No. ART patients | No. ART adult/paediatric | No. viral load tests | No. initiated in past 12 months |
|---|---|---|---|---|---|---|
| Clinic A | 3 / 3 | 0.4 | 187 | 178/9 | 7 | 13 |
| Clinic B | 10 / 10 | 4.5 | 477 | 459/18 | 133 | 83 |
| Clinic C | 2 / 2 | 1.0 | 233 | 218/15 | 80 | 40 |
| Hospital D | 10 / 10 | 2.4 | 192 | 185/7 | 96 | 53 |
| Hospital E | 17 / 4 | 4.4 | 1021 | 952/69 | 362 | 223 |
Annual HIV care and treatment costs; and cost per patient-year on ART in 2017 US$ (October 2016 to September 2017)
| Clinic A | Clinic B | Clinic C | Hospital D | Hospital E | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Total cost | Cost per ART patient | Total cost | Cost per ART patient | Total cost | Cost per ART patient | Total cost | Cost per ART patient | Total cost | Cost ART per patient | |
| Building | 555 | 2.97 | 16 | 0.03 | 23 | 0.10 | 5 | 0.03 | 239 | 0.23 |
| Equipment | 17 | 0.09 | 129 | 0.27 | 52 | 0.22 | 13 | 0.07 | 53 | 0.05 |
| Training | 786 | 4.20 | 2621 | 5.49 | 524 | 2.25 | 2621 | 13.65 | 1048 | 1.03 |
| Personnel | 850 | 4.55 | 6668 | 13.98 | 1785 | 7.66 | 4046 | 21.07 | 9411 | 9.22 |
| ART | 12,610 | 67.43 | 32,270 | 67.65 | 15,482 | 66.45 | 12,266 | 63.89 | 76,619 | 75.04 |
| Cotrimoxazole | 1098 | 5.87 | 2710 | 5.68 | 1324 | 5.68 | 1061 | 5.53 | 6241 | 6.11 |
| Viral load | 98 | 0.52 | 1862 | 3.90 | 1120 | 4.81 | 1344 | 7.00 | 5068 | 4.96 |
| Other supplies | 24 | 0.13 | 64 | 0.13 | 31.34 | 0.13 | 27 | 0.14 | 142 | 0.14 |
| Utilities & other | 2220 | 11.87 | 86 | 0.18 | 38.58 | 0.17 | 32 | 0.17 | 752 | 0.74 |
| Supervision | 410 | 2.19 | 410 | 0.86 | 410 | 1.76 | 410 | 2.13 | 410 | 0.40 |
| M&E | 336 | 1.80 | 336 | 0.70 | 336 | 1.44 | 336 | 1.75 | 336 | 0.33 |
| 746 | 3.99 | 746 | 1.56 | 746 | 3.20 | 746 | 3.88 | 746 | 0.73 | |