| Literature DB >> 32296520 |
Delin Wang1,2, Nathan Calabro-Kailukaitis1, Mahmoud Mowafy1, Eric S Kerns1, Khetisuda Suvarnasuddhi1, Jonah Licht1,3, Sun H Ahn1,4, Susie L Hu1.
Abstract
BACKGROUND: Peritoneal dialysis (PD) is an underutilized modality for hospitalized patients with an urgent need to start renal replacement therapy in the USA. Most patients begin hemodialysis (HD) with a tunneled central venous catheter (CVC).Entities:
Keywords: access-related procedures; end-stage renal disease; urgent-start hemodialysis; urgent-start peritoneal dialysis
Year: 2019 PMID: 32296520 PMCID: PMC7147319 DOI: 10.1093/ckj/sfz053
Source DB: PubMed Journal: Clin Kidney J ISSN: 2048-8505
FIGURE 1Flow chart of patients who received a tunneled dialysis catheter for HD and met inclusion or exclusion criteria for eligibility for PD. ICU, intensive care unit.
Baseline characteristics of urgent-start HD and PD patients
| Baseline characteristics | All | Case-matched | ||||
|---|---|---|---|---|---|---|
| HD ( | PD ( | P-value | HD ( | PD ( | P-value | |
| Age (years) | 60 ± 16 | 47 ± 16 | 0.002 | 52 ± 14 | 52 ± 14 | 0.99 |
| Gender (male %) | 66 | 78 | 0.29 | 72 | 72 | 1.0 |
| Race (Caucasian %) | 38 | 52 | 0.26 | 33 | 55 | 0.18 |
| Follow-up duration (months) | 16.7 ± 11.1 | 14.7 ± 10.3 | 0.47 | 18.2 ± 11.8 | 15.1 ± 10.8 | 0.30 |
| Potassium (mEq/L) | 4.6 ± 0.7 | 4.3 ± 0.7 | 0.05 | 4.5 ± 0.7 | 4.3 ± 0.6 | 0.23 |
| HCO3 (mEq/L) | 19 ± 5 | 19 ± 5 | 0.92 | 19 ± 3 | 19 ± 4 | 0.70 |
| BUN (mg/dL) | 94 ± 40 | 110 ± 44 | 0.14 | 94 ± 43 | 104 ± 38 | 0.37 |
| Creatinine (mg/dL) | 8.1 ± 4.3 | 11.8 ± 5.7 | 0.0031 | 9.9 ± 3.3 | 9.7 ± 3.4 | 0.82 |
| Albumin (g/dL) | 3.3 ± 0.5 | 3.3 ± 0.6 | 0.41 | 3.2 ± 0.5 | 3.3 ± 0.6 | 0.68 |
| Coronary artery disease (%) | 38 | 17 | 0.08 | 33 | 22 | 0.46 |
| Congestive heart failure (%) | 44 | 48 | 0.76 | 33 | 50 | 0.31 |
| Hypertension (%) | 92 | 96 | 0.56 | 89 | 94 | 0.55 |
| DM (%) | 58 | 30 | 0.029 | 33 | 33 | 1.0 |
| Malignancy (%) | 12 | 4 | 0.30 | 6 | 6 | 1.0 |
| Obesity (BMI >30) (%) | 24 | 35 | 0.34 | 33 | 33 | 1.0 |
| Dialysis access | 10 | 30 | 0.029 | 11 | 33 | 0.10 |
Dialysis access planned (but not mature or healed at the time of urgent-start dialysis).
Data are presented as mean ± SD or %.
BUN, blood urea nitrogen; BMI, body mass index.
Comparison of the mean number of access procedures performed per patient cumulatively over follow-up duration, and per patient-month between urgent start HD and PD patients (all and case-matched for age, sex and DM)
| All patients | HD ( | PD ( | P-value |
|---|---|---|---|
| Number of all access-related procedures, mean ± SD (median) | |||
| 30 days | 0.38 ± 0.73 (0) | 0.21 ± 0.42 (0) | 0.32 |
| Cumulative events | 4.6 ± 3.9 (4) | 0.61 ± 0.84 (0) | <0.0001 |
| Per patient-months | 0.37 ± 0.57 (0.23) | 0.081 ± 0.18 (0) | 0.019 |
| Mechanical procedures mean ± SD (median) | |||
| 30 days | 0.34 ± 0.63 (0) | 0.22 ± 0.42 (0) | 0.40 |
| Cumulative events | 4.4 ± 3.9 (3.5) | 0.52 ± 0.79 (0) | <0.0001 |
| Per patient-months | 0.30 ± 0.27 (0.21) | 0.078 ± 0.18 (0) | 0.0007 |
| Infection-related procedures mean ± SD (median) | |||
| 30 days | 0.040 ± 0.28 (0) | 0.0 ± 0.0 (0) | 0.32 |
| Cumulative events | 0.22 ± 0.68 (0) | 0.087 ± 0.42 (0) | 0.39 |
|
Per patient-months |
0.073 ± 0.38 (0) |
0.0028 ± 0.014 (0) |
0.38 |
|
Case-matched |
HD ( |
PD ( |
P-value |
| Number of all access-related procedures mean ± SD (median) | |||
| 30 days | 0.56 ± 0.86 (0) | 0.22 ± 0.43 (0) | 0.16 |
| Cumulative events | 5.7 ± 4.4 (5) | 0.61 ± 0.85 (0) | 0.0002 |
| Per patient-months | 0.39 ± 0.29 (0.29) | 0.094 ± 0.20 (0) | 0.0026 |
| Mechanical procedures mean ± SD (median) | |||
| 30 days | 0.56 ± 0.86 (0) | 0.22 ± 0.43 (0) | 0.16 |
| Cumulative events | 5.4 ± 4.4 (5) | 0.61 ± 0.85 (0) | 0.0004 |
| Per patient-months | 0.34 ± 0.26 (0.26) | 0.094 ± 0.20 (0) | 0.0096 |
| Infection-related procedures mean ± SD (median) | |||
| 30 days | 0.0 ± 0.0 (0) | 0.0 ± 0.0 (0) | – |
| Cumulative events | 0.33 ± 0.97 (0) | 0.0 ± 0.0 (0) | 0.16 |
| Per patient-months | 0.073 ± 0.17 (0) | 0.0 ± 0.0 (0) | 0.28 |