Abstract
In this study, research on a pile group system was conducted using shaking table tests under four working conditions: a natural foundation and pile-spacing conditions of 3D, 3.5D, and 4D (D is the diameter of the pile). The time histories of the excess pore pressure ratio and settlement were analyzed. It was determined that pile foundations improved the anti-liquefaction performance of the soil, and the effect was much greater when the pile spacing was 3D. In addition, the settlement dynamic amplification factor (SDAF) was proposed and calculated at different vibration times. The result was fitted with a linear relationship, and the correlation coefficient was relatively high. During the aseismic design of the pile foundation bearing capacity, the SDAF was multiplied by the static load, and the results showed that in the dynamic design of the pile foundation, the dynamic problem can be transformed into a static analysis, which can provide a reference for the design of the vertical bearing capacity of pile foundations under seismic force.Entities:
Year: 2020 PMID: 32191717 PMCID: PMC7081995 DOI: 10.1371/journal.pone.0229532
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Test system.
Fig 2Model box.
Main parameters of pile.
| Parameter | Model | Prototype |
|---|---|---|
| Pile Diameter (cm) | 3 | 30 |
| Pile Length (cm) | 60 | 600 |
| Density (kg/ m3) | 1.766×103 | 2.4×103 |
| Elastic Modulus (MPa) | 0.41×104 | 3.0×104 |
Grain composition of sand sample.
| Particle Size (mm) | >1.25 | 1.25~0.63 | 0.63~0.3 |
| Percentage Content (%) | 1.81 | 1.1 | 13.75 |
| Particle Size (mm) | 0.3~0.16 | 0.16~0.1 | <0.1 |
| Percentage Content (%) | 48.61 | 10.02 | 24.71 |
Related parameters of clay and sand sample.
| Sticky Soil | Water Content (%) | Cohesive Force (kPa) | Internal Friction Angle (°) | Permeability Coefficient (m/s) | Density (g/cm3) |
| 10 | 12.8 | 16 | 1×10−5 | 1.43 | |
| Sand | Maximum Dry Density (g/cm3) | Minimum Dry Density (g/cm3) | Inhomogeneity Coefficient | Saturation | Soil Grain Density (g/cm3) |
| 1.798 | 1.201 | 3.75 | 90 | 1.88 |
Fig 3Plan location of pile group.
Fig 4Layout of test instrumentation for pile group.
Parameters of earth pressure cells.
| Type | Range (MPa) | Specifications (mm) | Sensor line length (m) |
|---|---|---|---|
| DZ-I | 0.4 | Φ17×7 | 4 |
| DZ-I | 0.1 | Φ17×7 | 4 |
Parameters of pore water pressure sensor.
| Type | Number | Range (MPa) | Resolution ratio | Synthetic Error | Specifications (mm) |
|---|---|---|---|---|---|
| DYS-3 | 262 | 0.07 | 0.114%F·S | 0.641%F·S | Φ19×30 |
| DYS-3 | 183 | 0.07 | 0.159%F·S | 0.721%F·S | Φ19×30 |
| DYS-3 | 198 | 0.07 | 0.125%F·S | 0.997%F·S | Φ19×30 |
| DYS-3 | 187 | 0.07 | 0.125%F·S | 0.784%F·S | Φ19×30 |
Fig 5Acceleration versus time date.
The initial effective stress of the soil at different depths under different working conditions.
| Working Condition | Natural Foundation | Pile Foundation with 3D Pile Spacing | Pile Foundation with 3.5D Pile Spacing | Pile Foundation with 4D Pile Spacing |
|---|---|---|---|---|
| 5cm | 0.339 | 0.981 | 0.981 | 0.981 |
| 30cm | 2.036 | 2.677 | 2.677 | 2.677 |
| 50cm | 3.393 | 4.034 | 4.034 | 4.034 |
The unit of initial effective stress is kPa.
Fig 6Time history of excess pore pressure ratios at different depths of natural foundation.
Fig 9Time history of excess pore pressure ratios at different depths under 4D spacing conditions.
Time of excess pore water pressure appearance and the time of soil liquefaction unit: S.
| Natural Foundation | Pile Foundation with 3D Pile Spacing | Pile Foundation with 3.5D Pile Spacing | Pile Foundation with 4D Pile Spacing | |
|---|---|---|---|---|
| 5cm | 4/8 | 12/18 | 8/12 | 6/10 |
| 30cm | 5/11 | 13/20 | 10/13 | 8/12 |
| 50cm | 5/15 | 15/25 | 12/18 | 11/16 |
The numbers before '/' in Table 5 indicate the time when excess pore water pressure occurred, and the numbers after '/' indicate the time when liquefaction began.
Fig 10Time history of settlements during vibration of the natural foundation.
Fig 13Time history of settlement during vibration under 4D working conditions.
Maximum settlement and the time of large settlement occurrence.
| Natural Foundation | Pile Foundation with 3D Pile Spacing | Pile Foundation with 3.5D Pile Spacing | Pile Foundation with 4D Pile Spacing | |
|---|---|---|---|---|
| Time at Large Settlement (s) | 8 | 18.5 | 13 | 10.8 |
| Maximum Settlement (mm) | 25 | 21.5 | 22 | 25 |
Settlement at different vibrating moments.
| Pile Spacing | Settlement When Static Load is 750N (mm) | Settlement of Different Vibration Time (mm) | |||
|---|---|---|---|---|---|
| 15 s | 20 s | 25 s | 30 s | ||
| 3D | 3.6 | 1.5 (5.1) | 13 (16.6) | 17 (20.6) | 20.1 (23.7) |
| 3.5D | 3.5 | 6 (9.5) | 17 (20.5) | 19 (22.5) | 21.1 (24.6) |
| 4D | 2.5 | 18 (20.5) | 21 (23.5) | 25 (27.5) | 25 (27.5) |
The total settlement under dynamic load is shown in brackets in the table. The total settlement at a certain moment is the sum of the vibration settlement at the moment and the settlement before vibration.
The SDAF at different vibrating moments.
| Pile Spacing | SDAF of Settlement of Different Vibration Time | |||
|---|---|---|---|---|
| 15 s | 20 s | 25 s | 30 s | |
| 3D | 1.42 | 4.62 | 5.73 | 6.59 |
| 3.5D | 2.72 | 5.86 | 6.43 | 7.03 |
| 4D | 8.20 | 9.40 | 11.00 | 11.00 |
Fig 14Changes in SDAFS with vibration time for the different spacing conditions.