| Literature DB >> 31986175 |
Wen Jiang1, Zhu Huang1, Ying Peng1, Yaqi Fang1, Yunzhong Cao1.
Abstract
Prefabricated construction (PC) has attracted wide spread attention as a model of sustainable development for the construction industry of the future. Although the PC has many advantages, it is still at an initial stage in China. Based on the current conditions in China, this study focuses on the interrelationships of factors affecting PC promotion. Firstly, through a comprehensive review of relevant literatures and expert recommendations, 5 factors were identified: policy factor, technical factor, management factor, market factor and cost factor. Next, the data were collected through a questionnaire survey, and the questionnaire data were processed using SPSS 24.0 and AMOS 22.0. The overall relationships of each factor were quantitatively analyzed with Structural Equation Modeling (SEM). The results show that the policy factor plays a dominant role, while the management factor and market factors are also significant. This study also provides decision makers with relevant information about the factors involved, which will be helpful in devising appropriate strategies for the wider adoption of PC.Entities:
Year: 2020 PMID: 31986175 PMCID: PMC6984738 DOI: 10.1371/journal.pone.0227787
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Conceptual framework model.
Research hypothesis.
| Item | Path hypothesis | Impact | ||
|---|---|---|---|---|
| H1 | Policy factor | → | Technical factor | Significant impact |
| H2 | Policy factor | → | Market factor | Significant impact |
| H3 | Policy factor | → | PC promotion | Significant impact |
| H4 | Technical factor | → | Cost factor | Significant impact |
| H5 | Technical factor | → | PC promotion | Significant impact |
| H6 | Management factor | → | PC promotion | Significant impact |
| H7 | Market factor | → | Cost factor | Significant impact |
| H8 | Market factor | → | PC promotion | Significant impact |
| H9 | Cost factor | → | PC promotion | Significant impact |
Sources of observed variables.
| Potential variables | Observation variables | Literatures | Item |
|---|---|---|---|
| PF | Policy incentive | [ | X11 |
| Industry standard | [ | X12 | |
| Regulatory mechanism | [ | X13 | |
| TF | BIM technology | [ | X21 |
| Standardization | [ | X22 | |
| Technical talent | [ | X23 | |
| MF | Organizational strategy | [ | X31 |
| Information collaboration | [ | X32 | |
| Management mode | [ | X33 | |
| MF | Industry chain | [ | X41 |
| Public acceptance | [ | X42 | |
| Enterprise transformation | [ | X43 | |
| CF | Production cost | [ | X51 |
| Purchase cost | [ | X52 | |
| Transportation cost | [ | X53 | |
| PCP | Environmental performance | [ | X61 |
| Economic performance | [ | X62 | |
| Social performance | [ | X63 |
[1] Gan X.L et al. (2018); [5] Jaillon L et al. (2009); [7] Chiang, Y.H et al. (2006); [8] Tam V.W.Y et al. (2007); [10] Li Z.D et al. (2014); [12] Hong J.K et al. (2018); [13] Foxon T.J et al. (2007); [17] Li C.Z et al. (2018); [29] Abanda, F.H et al. (2017); [30] Blismas N et al. (2009); [31] Dewick P et al. (2004); [32] Eastman, C.M et al. (2008); [33] Gan Y et al. (2017); [34] Hamid Z.A et al. (2011); [35] Jaillon L et al. (2010); [36] Li C.Z et al. (2016); [37] Lu W et al. (2013) [38] Luo L.Z et al. (2015); [39] Mao C et al. (2015); [40] Polat G et al. (2008); [41] Polat G et al.(2010); [42] Teng, Y et al. (2017); [43] Wang J et al. (2016); [44] Xue X et al. (2018); [45] Zhang, X.L et al. (2014).
Reliability test results for each dimension.
| Latent variables | measurable variables | Cronbach's alpha coefficient |
|---|---|---|
| PF | X11 | 0.875 |
| X12 | ||
| X13 | ||
| TF | X21 | 0.881 |
| X22 | ||
| X23 | ||
| MF | X31 | 0.856 |
| X32 | ||
| X33 | ||
| MF | X41 | 0.875 |
| X42 | ||
| X43 | ||
| CF | X51 | 0.866 |
| X52 | ||
| X53 | ||
| PCP | X61 | 0.891 |
| X62 | ||
| X63 |
The values of skewness and kurtosis.
| X11 | X12 | X13 | X21 | X22 | X23 | X31 | X32 | X33 | X41 | X42 | X43 | X51 | X52 | X53 | X61 | X62 | X63 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Skewness | -0.687 | -0.749 | -0.829 | -0.744 | -0.844 | -0.953 | -0.856 | -0.666 | -0.732 | -0.808 | -0.782 | -0.810 | -0.681 | -0.538 | -0.756 | -0.743 | -0.746 | -0.749 |
| Kurtosis | -0.456 | -0.281 | -0.387 | -0.370 | 0.073 | 0.134 | -0.021 | -0.247 | -0.468 | -0.047 | -0.152 | 0.088 | -0.306 | -0.706 | -0.233 | -0.105 | -0.381 | -0.406 |
Results of PCA and rotated factor analysis.
| 1 | 2 | 3 | 4 | 5 | 6 | |
|---|---|---|---|---|---|---|
| .819 | ||||||
| .787 | ||||||
| .817 | ||||||
| .831 | ||||||
| .840 | ||||||
| .832 | ||||||
| .828 | ||||||
| .789 | ||||||
| .822 | ||||||
| .818 | ||||||
| .816 | ||||||
| .840 | ||||||
| .820 | ||||||
| .805 | ||||||
| .835 | ||||||
| .772 | ||||||
| .781 | ||||||
| .819 | ||||||
| 7.980 | 1.491 | 1.383 | 1.362 | 1.218 | 1.041 | |
| 44.336 | 8.282 | 7.684 | 7.568 | 6.766 | 5.785 | |
| 44.336 | 52.618 | 60.301 | 67.869 | 74.635 | 80.419 |
Correlation coefficient matrix.
| X11 | X12 | X13 | X21 | X22 | X23 | X31 | X32 | X33 | X41 | X42 | X43 | X51 | X52 | X53 | X61 | X62 | X63 | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| X11 | 1 | |||||||||||||||||
| X12 | 0.669 | 1 | ||||||||||||||||
| X13 | 0.745 | 0.694 | 1 | |||||||||||||||
| X21 | 0.417 | 0.402 | 0.375 | 1 | ||||||||||||||
| X22 | 0.319 | 0.371 | 0.346 | 0.713 | 1 | |||||||||||||
| X23 | 0.433 | 0.360 | 0.376 | 0.747 | 0.679 | 1 | ||||||||||||
| X31 | 0.376 | 0.378 | 0.400 | 0.344 | 0.366 | 0.329 | 1 | |||||||||||
| X32 | 0.420 | 0.332 | 0.365 | 0.305 | 0.229 | 0.286 | 0.632 | 1 | ||||||||||
| X33 | 0.362 | 0.370 | 0.402 | 0.339 | 0.251 | 0.302 | 0.715 | 0.655 | 1 | |||||||||
| X41 | 0.400 | 0.339 | 0.351 | 0.321 | 0.300 | 0.368 | 0.324 | 0.400 | 0.349 | 1 | ||||||||
| X42 | 0.377 | 0.364 | 0.381 | 0.352 | 0.307 | 0.364 | 0.328 | 0.318 | 0.368 | 0.686 | 1 | |||||||
| X43 | 0.347 | 0.371 | 0.366 | 0.318 | 0.316 | 0.350 | 0.335 | 0.330 | 0.344 | 0.685 | 0.728 | 1 | ||||||
| X51 | 0.379 | 0.375 | 0.364 | 0.373 | 0.343 | 0.321 | 0.338 | 0.335 | 0.346 | 0.320 | 0.358 | 0.268 | 1 | |||||
| X52 | 0.328 | 0.337 | 0.359 | 0.362 | 0.341 | 0.326 | 0.322 | 0.350 | 0.337 | 0.323 | 0.359 | 0.343 | 0.659 | 1 | ||||
| X53 | 0.340 | 0.326 | 0.322 | 0.363 | 0.322 | 0.314 | 0.345 | 0.337 | 0.340 | 0.388 | 0.367 | 0.366 | 0.709 | 0.694 | 1 | |||
| X61 | 0.454 | 0.484 | 0.502 | 0.421 | 0.381 | 0.381 | 0.358 | 0.398* | 0.447 | 0.391 | 0.455 | 0.446 | 0.390 | 0.421 | 0.424 | 1 | ||
| X62 | 0.386 | 0.419 | 0.447 | 0.446 | 0.405 | 0.401 | 0.377 | 0.428 | 0.424 | 0.368 | 0.414 | 0.379 | 0.432 | 0.431 | 0.697 | 0.697 | 1 | |
| X63 | 0.450 | 0.446 | 0.493 | 0.416 | 0.350 | 0.347 | 0.339 | 0.407 | 0.441 | 0.368 | 0.457 | 0.401 | 0.438 | 0.427 | 0.759 | 0.759 | 0.745 | 1 |
** correlation is significant at the 0.01 level (2-tailed).
Fig 2Initial model of PC promotion.
Intrinsic quality verification factor analysis.
| Potential variables | Construction reliability | Average variance extraction | Criteria | Discriminant result |
|---|---|---|---|---|
| Policy factor | 0.8777 | 0.7055 | well | |
| Technical factor | 0.8821 | 0.7140 | Construction reliability ≥0.6 | well |
| Management factor | 0.8754 | 0.7010 | well | |
| Market factor | 0.8687 | 0.6882 | Average variance extraction >0.5 | well |
| Cost factor | 0.8568 | 0.6664 | well |
Fit index calculation.
| Indices | CFA | SEM | Suggested value |
|---|---|---|---|
| χ2/df | 1.467 | 2.93 | <3 |
| RMSEA | 0.036 | 0.072 | <0.08 |
| GFI | 0.959 | 0.904 | >0.9 |
| NFI | 0.966 | 0.936 | >0.9 |
| IFI | 0.989 | 0.964 | >0.9 |
| CFI | 0.989 | 0.964 | >0.9 |
| TLI | 0.985 | 0.964 | >0.9 |
| PGFI | 0.64 | 0.666 | >0.5 |
| PNFI | 0.736 | 0.754 | >0.5 |
| PCFI | 0.753 | 0.776 | >0.5 |
Fig 3Structural equation modeling diagram of factors of PC.
Model path coefficient fitting.
| Path hypothesis | Standardized estimate | S.E. | C.R. | P | Test result | ||
|---|---|---|---|---|---|---|---|
| Policy factor | → | Technical factor | 0.556 | 0.048 | 9.913 | Significant impact | |
| Policy factor | → | Market factor | 0.528 | 0.046 | 9.004 | Significant impact | |
| Policy factor | → | PC promotion | 0.291 | 0.051 | 4.297 | Significant impact | |
| Technical factor | → | Cost factor | 0.293 | 0.065 | 4.836 | Significant impact | |
| Technical factor | → | PC promotion | 0.151 | 0.053 | 2.471 | 0.013 | Significant impact |
| Management factor | → | PC promotion | 0.219 | 0.054 | 3.819 | Significant impact | |
| Market factor | → | Cost factor | 0.387 | 0.075 | 6.162 | Significant impact | |
| Market factor | → | PC promotion | 0.233 | 0.061 | 3.704 | Significant impact | |
| Cost factor | → | PC promotion | 0.184 | 0.050 | 3.011 | 0.003 | Significant impact |
*** p < 0.001