Abstract
Background: The global health community and funding agencies are currently engaged in ensuring that worthwhile research-based programmes are sustainable. Despite its importance, few studies have analysed the sustainability of global health interventions. In this paper, we aim to explore barriers and facilitators for the wider implementation and sustainability of a mobile health (mHealth) intervention (Supporting LIFE Community Case Management programme) in Malawi, Africa.Entities:
Keywords: Malawi; child health; community case management; mHealth; policy impact; sustainability
Year: 2019 PMID: 31839886 PMCID: PMC6895377 DOI: 10.4314/mmj.v31i3.3
Source DB: PubMed Journal: Malawi Med J ISSN: 1995-7262 Impact factor: 0.875
Figure 1Shediac-Rizkallah and Bone framework conceptualising programme sustainability19
The sampling strategy used to identify participants
| Objective | Procedure |
| Criteria | Participants were selected on the basis |
| Method | Participants who met the above criteria were |
| Interview | In-depth and semi-structured |
A priori and emergent themes derived from the framework and transcripts
| Priori Themes | Emergent Themes | Quotes | |
| Programme | Programme | Consistent engagement with | “approve NGOs or research being done, so all those |
| Programme | Vital information is missed on the | “when there is a certain part you have missed, the | |
| Improvement in accuracy in | “advantage is to do with the accuracy that the app | ||
| Reduction in caregivers seeking | “so some of them did not even come here, they | ||
| Limited resources impacted the | “other organisations that are dealing with the | ||
| Programme | Financial sustenanace through the | “for the MoH, I have my doubts because the ministry | |
| MoH in favour of mHealth | “there is a lot of reaching out to the communities, so I | ||
| Need to build local technical | “have an external stakeholder to provide technical | ||
| Training | Need for Training of trainers (ToT) | “train them as part of the project. If the project goes, | |
| Factors Within the | Integration with | Imperative to integrate with DHIS2 | “responsible for punching data are the HMIS |
| Factors in the | Socioeconomic | Insufficient human resources | “one HSA has to serve a huge number. The population |
| Community | Communities felt empowered | “so that means that our village is intending to be | |
| Caregivers felt the HSAs were | “that I have gained a certain knowledge from | ||