| Literature DB >> 31832958 |
Davids O Raphael1, David A Okunade2, Kola Ogedengbe3, Oluwadamilola A Adekunle4.
Abstract
A pilot-scale batch-flow free water surface (FWS) constructed wetland (CW) system planted with Rhynchospora corymbosa (L.) Britton was developed with a hydraulic retention time (HRT) of 2.5 days. The average porosity of the substrate was 0.55 and calculated hydraulic loading rate (HLR) was 3.96 (g BOD/m2-day). Quantitative and qualitative characterization of the greywater were done. The concentrations of pollutants in the greywater before and after it was fed into the FWS CWs were measured using standard sampling and analyses methods. The average daily per capita water use estimated was 162 L, out of which 72.5 L was greywater. The mean removal efficiencies (RE) of the CWs were 81% COD, 85% TN, 82% TK, 10% TP, 0.2% pH, 81% TSS, Zn 91%, 81% Al, 94% Mg, and 90% Fe. It was observed that the FWS with batch-flow configuration tested in the study was slightly different in terms of results reported on the conventional continuous flow system. R. corymbosa as a macrophyte has roots that can provide a surface area for microbial growth and oxygen exchange and can be used as emergent macrophytes in phytoremediation of greywater. The result provided information on the performance and pollutant removal efficiency of a batch-operated FWS CW system planted with R. corymbosa.Entities:
Keywords: Batch-flow; Constructed wetlands; Free water surface; Greywater; Rhynchospora corymbosa (L.) Britton phytoremediation
Mesh:
Substances:
Year: 2019 PMID: 31832958 DOI: 10.1007/s11356-019-07095-6
Source DB: PubMed Journal: Environ Sci Pollut Res Int ISSN: 0944-1344 Impact factor: 4.223