| Literature DB >> 31315174 |
Jinyue Zhang1, Jianing Guo2, Haiming Xiong3, Xiangchi Liu1, Daxin Zhang4.
Abstract
Many research studies have focused on fire evacuation planning. However, because of the uncertainties in fire development, there is no perfect solution. This research proposes a fire evacuation management framework which takes advantage of an information-rich building information modeling (BIM) model and a Bluetooth low energy (BLE)-based indoor real-time location system (RTLS) to dynamically push personalized evacuation route recommendations and turn-by-turn guidance to the smartphone of a building occupant. The risk score (RS) for each possible route is evaluated as a weighted summation of risk level index values of all risk factors for all segments along the route, and the route with the lowest RS is recommended to the evacuee. The system will automatically re-evaluate all routes every 2 s based on the most updated information, and the evacuee will be notified if a new and safer route becomes available. A case study with two testing scenarios was conducted for a commercial office building in Tianjin, China, in order to verify this framework.Entities:
Keywords: building information modeling; fire evacuation management; personalized routing; real-time location system; smartphone
Year: 2019 PMID: 31315174 PMCID: PMC6679279 DOI: 10.3390/s19143128
Source DB: PubMed Journal: Sensors (Basel) ISSN: 1424-8220 Impact factor: 3.576
Figure 1The framework of the proposed intelligent and real-time fire evacuation management system.
Figure 2User interface for Forge Viewer.
Figure 3Comparison of major RTLS technologies (where the circle size reflects how widely the technology has been adopted).
Figure 4Bluetooth low energy (BLE)-based indoor RTLS.
Factors related to fire and their risk level index (RLI) values.
| Factor Name | Risk Level Index Value | |||||
|---|---|---|---|---|---|---|
| Index = 0 | Index = 1 | Index = 2 | Index = 3 | Index = 4 | Index = 500 | |
| Temperature (°C) | 0–40 | 41–60 | 61–80 | 81–100 | 100–147 | 148+ |
| CO density (ppm) | 0–50 | 50–100 | 100–1000 | 1000–3200 | 3200–12,600 | 12,600+ |
| Visibility (meters) | 30+ | 20–30 | 10–20 | 5–10 | 0–5 | |
Factors related to building occupants and their index values.
| Factor Name | Risk Level Index Value | ||||
|---|---|---|---|---|---|
| Index = 0 | Index = 1 | Index = 2 | Index = 3 | Index = 4 | |
| Human density (person/m2) | 0–0.8 | 0.8–1.8 | 1.8–2.8 | 2.8–4 | 4+ |
| Building familiarity | Very Familiar | Familiar | Not Familiar | ||
| Fire/smoke protection | Yes | No | |||
Factors related to building and their index values.
| Factor Name | Risk Level Index Value | ||||
|---|---|---|---|---|---|
| Index = 0 | Index = 1 | Index = 2 | Index = 3 | Index = 4 | |
| Evacuation route type | Room | Corridor | Ramp | Stair | Elevator |
| Emergency lamp | Yes | No | |||
| Fire sprinkler | Yes | No | |||
Mean and standard deviation of all risk factors.
| Order | Factor | Mean | Standard Deviation |
|---|---|---|---|
| F1 | Temperature | 6.34 | 2.07 |
| F2 | Visibility | 6.11 | 2.81 |
| F3 | Fire/smoke protection | 5.94 | 2.15 |
| F4 | CO density | 5.85 | 2.33 |
| F5 | Human density | 3.77 | 2.69 |
| F6 | Fire sprinkler | 3.36 | 3.32 |
| F7 | Building familiarity | 3.28 | 2.96 |
| F8 | Evacuation route type | 1.92 | 2.68 |
| F9 | Emergency lamp | 1.16 | 3.22 |
Figure 5(a) Floorplan of the office building, (b) building information modeling (BIM) model for the building with navigation tools.
Figure 6(a) Bluetooth sensor employed in this study, (b) layout of 26 Bluetooth sensors.
Figure 7Evacuation route selection in (a) Scenario 1 and (b) Scenario 2.
RS calculation for Route 1.
| S. No | Time | L (m) | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | W. Sum |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0:00 | 4.2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 5.96 |
| 2 | 0:02 | 5 | 1 | 1 | 1 | 1 | 0 | 0 | 0 | 1 | 0 | 26.16 |
| 3 | 0:04 | 1.2 | 3 | 2 | 1 | 2 | 0 | 0 | 0 | 1 | 0 | 12.19 |
| 4 | 0:05 | 3.8 | 4 | 4 | 1 | 3 | 0 | 0 | 0 | 1 | 0 | 57.16 |
| TT = | 0:07 | RS = | 101.48 |
S. No = segment number, Time = time of arrival, L = segment length, F1–F9 are factors listed in Table 4, W. Sum = weighted sum, TT = total time, and RS = Risk Scale.
RS calculation for Route 2 (without a second fire).
| S. No | Time | L (m) | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | W. Sum |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0:00 | 4.2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 5.96 |
| 2 | 0:02 | 5 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 20.31 |
| 3 | 0:04 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 4 | 0:06 | 0.9 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 1.41 |
| 5 | 0:06 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 6 | 0:08 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 7 | 0:10 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 8 | 0:12 | 1.3 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 2.04 |
| 9 | 0:13 | 4.3 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 6.76 |
| TT = | 0:15 | RS = | 67.93 |
S. No = segment number, Time = time of arrival, L = segment length, F1–F9 are factors listed in Table 4, W. Sum = weighted sum, TT = total time, and RS = Risk Scale.
Figure 8Smartphone display in (a) Scenario 1 and (b) Scenario 2.
RS calculation for Route 2 (including the second fire).
| S. No | Time | L (m) | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | W. Sum |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0:00 | 4.2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 5.96 |
| 2 | 0:02 | 5 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 20.31 |
| 3 | 0:04 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 4 | 0:06 | 0.9 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 1.41 |
| 5 | 0:06 | 5 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 14.20 |
| 6 | 0:08 | 5 | 2 | 1 | 1 | 1 | 0 | 0 | 0 | 1 | 0 | 32.50 |
| 7 | 0:10 | 5 | 3 | 2 | 1 | 2 | 0 | 0 | 0 | 1 | 0 | 50.80 |
| 8 | 0:12 | 1.3 | 3 | 2 | 1 | 2 | 0 | 0 | 0 | 1 | 0 | 13.21 |
| 9 | 0:13 | 4.3 | 2 | 1 | 1 | 1 | 0 | 0 | 0 | 1 | 0 | 27.95 |
| TT = | 0:15 | RS = | 174.21 |
S. No = segment number, Time = time of arrival, L = segment length, F1–F9 are factors listed in Table 4, W. Sum = weighted sum, TT = total time, and RS = Risk Scale.
RS calculation for Route 3 (in response to the second fire).
| S. No | Time | L (m) | F1 | F2 | F3 | F4 | F5 | F6 | F7 | F8 | F9 | W. Sum |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 0:00 | 4.2 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 1 | 5.96 |
| 2 | 0:02 | 5 | 1 | 1 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 20.31 |
| 3 | 0:04 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 4 | 0:06 | 0.9 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 1.41 |
| 5 | 0:06 | 5 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 14.20 |
| 6 | 0:08 | 2.7 | 2 | 1 | 1 | 1 | 0 | 0 | 0 | 1 | 0 | 17.55 |
| 7 | 0:10 | 5 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 14.20 |
| 8 | 0:12 | 5 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 7.86 |
| 9 | 0:14 | 4.1 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 11.64 |
| 10 | 0:15 | 5 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 14.20 |
| 11 | 0:17 | 3.8 | 0 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 5.97 |
| 12 | 0:18 | 5 | 1 | 0 | 1 | 0 | 0 | 0 | 0 | 1 | 0 | 14.20 |
| 13 | 0:20 | 3.5 | 2 | 1 | 1 | 1 | 0 | 0 | 0 | 1 | 0 | 22.75 |
| TT = | 0:21 | RS = | 158.13 |
S. No = segment number, Time = time of arrival, L = segment length, F1–F9 are factors listed in Table 4, W. Sum = weighted sum, TT = total time, and RS = Risk Scale.