| Literature DB >> 30998712 |
Anne Carolus1, Wolfgang Richter2, Claus-Peter Fritzen2, Kirsten Schmieder1, Christopher Brenke1.
Abstract
BACKGROUND: Manual skull drilling is an old but in modern neurosurgery still established procedure which can be applied quickly and universally in emergency situations. Electrical drilling requires more complex equipment and is usually reserved to the Operating Room (OR). It also seems desirable to apply an electrical drill for bedside usage but a suitable product does not exist so far.Entities:
Mesh:
Year: 2019 PMID: 30998712 PMCID: PMC6472766 DOI: 10.1371/journal.pone.0215171
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Experimental setup.
(A) Test specimen clamped on load cell (B) Manual and electric drilling machine (C) triaxial acceleration sensor attached to the drilling machine (D) Force components resolved.
Fig 2Resulting boreholes.
(A) Measuring angle deviation with the help of a set square (B) Typical borehole electric drilling (C) Typical borehole manual drilling.
Spindle speed of drills.
| Principal experiment | Drill diameter [mm] | Max. spindle speed [rpm] | Frequency [Hz] |
|---|---|---|---|
| Electric drill, test person 1 | 4.5 | 165 | 2.75 |
| Electric drill, test person 2 | 4.5 | 160 | 2.,67 |
| manual drill, test person 1 | 4.5 | 420 | 7 |
| manual drill, test person 2 | 4.5 | 480 | 8 |
Triaxial acceleration sensors, model PCB 356 A16 (Fig 1B, Fig 1C) were applied with glue to both drilling machines. Both sensors were connected to a coupler (type Kistler 5134) and measured the vertical (z) and horizontal (x,y) acceleration during the drilling process (Fig 1D). This data was also recorded with the same data acquisition system.
Parameters of electrical drilling, Part 1 (E+no = mean of 5 drilling procedures).
| Experiment no. | Penetration rate [%] | Drilling time [s] | Deviation in angles | Force–mean [N]** | Force–max [N]** | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| xz | yz | x | y | z | x | y | z | |||
| 1–5 (E1) | 60 | 58 | 1.7 | 1.4 | 2 | 0 | 60 | 7 | 6 | 84 |
| 6–10 (E2) | 100 | 65 | 0.8 | 0.8 | 6 | -5 | 68 | 12 | 9 | 86 |
| 11–15 (E3) | 100 | 50 | 3.6 | 1,3 | 12 | -5 | 98 | 21 | 15 | 132 |
| 16–20 (E4) | 100 | 79 | 1.9 | 1.7 | 10 | -9 | 77 | 19 | 18 | 123 |
| max | 100 | 163 | 5 | 4 | 18 | 5 | 116 | 25 | 22 | 142 |
| mean | 90 | 63 | 2 | 1.3 | 7 | -5 | 76 | 15 | 12 | 106 |
| min | 69 | 26 | 0 | 0 | -3 | -13 | 44 | 3 | 3 | 65 |
Parameters of electrical drilling, Part 2 (E+no = mean of 5 drilling procedures).
| Experiment no. | Impulse (J = ʃF dt) [Ns] | Total impulse [Ns] | Acceleration | ||||
|---|---|---|---|---|---|---|---|
| x | y | z | p-tot* | xy | z | ||
| 1–5 (E1) | 131 | -6 | 3610 | 3616 | 4.7 | 0.4 | |
| 6–10 (E2) | 377.2 | -309.3 | 4410.0 | 4438 | 3.7 | 0.8 | |
| 11–15 (E3) | 502.2 | -213.7 | 4548.8 | 4591 | 6.4 | 0.6 | |
| 16–20 (E4) | 593.2 | -526.5 | 4326.2 | 4399 | 5.7 | 0.8 | |
| max | 1042 | 190 | 9159 | 9266 | 7.9 | 3.3 | |
| mean | 434 | -294 | 434 | 4574 | 5.1 | 0.8 | |
| min | -91 | -939 | -91 | 1525 | 2.4 | 0.1 | |
** values with 30 Hz lowpass filter
*** vector sum
Parameters of manual drilling, Part 1 (E+no = mean of 5 drilling procedures).
| Experiment | Penetration rate [%] | Drilling time [s] | Deviation in angles | Force–mean [N]** | Force–max [N]** | |||||
|---|---|---|---|---|---|---|---|---|---|---|
| xz | yz | x | y | z | x | y | z | |||
| 21–25 (E5) | 80 | 56 | 1,9 | 0,8 | -0,6 | 11,6 | 33,9 | 9,3 | 21,5 | 58,8 |
| 26–30 (E6) | 100 | 27 | 1,2 | 2,4 | 0,9 | 5,1 | 43,4 | 17,2 | 18,1 | 89,3 |
| 30–35 (E7) | 80 | 54 | 0,9 | 0,2 | -5,5 | 14,4 | 44,4 | 14,3 | 28,1 | 83,7 |
| 35–40 (E8) | 80 | 24 | 0,3 | 1,1 | -0,4 | 8,8 | 58,3 | 17 | 24,2 | 114 |
| max | 100 | 70 | 4,0 | 5 | 2 | 18 | 71 | 22 | 34 | 123 |
| mean | 80 | 38 | 1,1 | 1,1 | -1,4 | 10 | 45 | 14,5 | 23 | 86,5 |
| min | 60 | 15 | 0,0 | 0,0 | -11 | 3 | 30 | 7 | 16 | 52 |
Parameters of manual drilling, Part 2 (E+no = mean of 5 drilling procedures).
| Experiment no. | Impulse (J = ʃF dt) [Ns] | Total impulse [Ns] | Acceleration | ||||
|---|---|---|---|---|---|---|---|
| x | y | z | p-total* | xy | z | ||
| 21–25 (E5) | -9,7 | 523 | 1490,7 | 1583 | 13,8 | 2,2 | |
| 26–30 (E6) | 27,3 | 138,4 | 1158 | 1167 | 23,8 | 3,5 | |
| 30–35 (E7) | -299,6 | 759,2 | 2352 | 2502 | 14,6 | 1,9 | |
| 35–40 (E8) | -5,7 | 210 | 1312,2 | 1330 | 24,4 | 4,5 | |
| max | 116 | 921 | 2758 | 2916 | 32,7 | 8,7 | |
| mean | -72 | 408 | 1578 | 1646 | 19,2 | 3,0 | |
| min | -647 | 73 | 930 | 933 | 9,9 | 1,4 | |
** values with 30 Hz lowpass filter
*** vector amount
Fig 3Drilling parameters (I).
(A) Drilling time (B) Drilling Force x-direction (C) Drilling Force y-direction (D) Drilling Force z-Direction.
Fig 5Borehole geometry.
(A) Hole diameter (B) Deviation angle xy-direction (C) Deviation angle xz-direction.
Fig 4Drilling paramaters (II).
(A) Impulse (B) Acceleration xy-plane (C) Acceleration z-plane (D) Penetration force.