| Literature DB >> 30712545 |
Treasa 'Susie' Leming-Lee1, Shea Polancich2, Bonnie Pilon3.
Abstract
The purpose of the Toyota Production System (TPS) Lean 5S methodology project is to improve the efficiency and effectiveness in a process by eliminating identified process waste of (1) defects (errors), (2) overproduction, (3) waiting, (4) confusion, (5) motion/travel, (6) excess inventory, (7) overprocessing, and (8) human potential. The specific aim of this quality improvement project was to evaluate the impact of the TPS 5S tool process, a problem-solving, space-organizing tool, on distractions and interruptions in the neurosurgery operating room (OR) workflow with a goal to decrease neurosurgery craniotomy infection rates in a neurosurgery OR suite within a 3-month period.Entities:
Keywords: 5S; Distractions; Interruptions; Lean; Operating room; Quality improvement; Toyota Production System; Waste
Mesh:
Year: 2019 PMID: 30712545 DOI: 10.1016/j.cnur.2018.10.008
Source DB: PubMed Journal: Nurs Clin North Am ISSN: 0029-6465 Impact factor: 1.208