Life cycle assessment of a large water treatment plant in Turkey.

Alaa Saad1, Nilay Elginoz2, Fatos Germirli Babuna3, Gulen Iskender1.   

Abstract

The objective of this study is to assess the environmental sustainability of a large water treatment plant through life cycle assessment (LCA) approach. This study is a pioneering one that explores the environmental impacts of a water treatment plant in Turkey by using the data collected from an actual plant. Decision makers of the treatment plant under investigation, operators of similar installations, and the scientific researchers that work on LCA of water treatment facilities are defined as the target audience. GaBi software is used for the LCA model, and CML 2001 method is adopted to calculate the results given per 1 m3 water ready to be distributed to the city. The plant serves about 2,600,000 people generating a maximum potable water flow rate of 400,000 m3/day. In the facility, 0.57 kWh of electricity is required to obtain 1 m3 of water. Of this total electricity consumption, 85% is allocated to inlet and outlet pumping stations. The results denote that the environmental impacts are dominated by electricity consumption that in turn depends on the energy source/s adopted. Sensitivity analysis on energy sources reveals the following outcomes: In case of using hard coal as energy source rather than grid mix, impacts are increased apart from freshwater aquatic ecotoxicity potential, ozone layer depletion potential, and abiotic depletion potential elements. Once solar panels are used instead of grid mix, values for all impact categories except abiotic depletion potential elements and human toxicity potential are lowered. The usage of wind turbines in place of grid mix results in 29 to 84% reductions in all investigated impact categories. The best option to decrease the environmental impacts is attained when energy is generated using wind turbines. As pumps having 90% efficiency replace the pumps with 60% efficiency, reductions ranging from 15 to 24% on all impact categories are obtained. The work performed for this study should be further pursued to obtain more representative inventory data for countries with scarce LCA studies.

Entities:  

Keywords:  Environmental impacts; Life cycle assessment; Operation; Sustainability; Water treatment

Mesh:

Substances:

Year:  2018        PMID: 30499087     DOI: 10.1007/s11356-018-3826-9

Source DB:  PubMed          Journal:  Environ Sci Pollut Res Int        ISSN: 0944-1344            Impact factor:   4.223


  2 in total

1.  Life cycle assessment of a printed circuit board manufacturing plant in Turkey.

Authors:  Elif Ozkan; Nilay Elginoz; Fatos Germirli Babuna
Journal:  Environ Sci Pollut Res Int       Date:  2017-09-29       Impact factor: 4.223

2.  The study of potable water treatment process in Algeria (boudouaou station) -by the application of life cycle assessment (LCA).

Authors:  Messaoud-Boureghda Mohamed-Zine; Aksas Hamouche; Louhab Krim
Journal:  J Environ Health Sci Eng       Date:  2013-12-19
  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.