Multi-level optimization of maintenance plan for natural gas system exposed to deterioration process.

Ahmad BahooToroody1, Mohammad Mahdi Abaei2, Ehsan Arzaghi3, Farshad BahooToroody4, Filippo De Carlo5, Rouzbeh Abbassi6.   

Abstract

In this paper, a risk-based optimization methodology for a maintenance schedule considering Process Variables (PVs), is developed within the framework of asset integrity assessment. To this end, an integration of Dynamic Bayesian Network, Damage Modelling and sensitivity analysis are implemented to clarify the behaviour of failure probability, considering the exogenous undisciplinable perturbations. Discrete time case is considered through measuring or observing the PVs. Decision configurations and utility nodes are defined inside the network to represent maintenance activities and their associated costs. The regression analysis is considered to model the impact of perturbations on PVs for future applications. The developed methodology is applied to a case study of Chemical Plant (Natural Gas Regulating and Metering Stations). To demonstrate the applicability of the methodology, three cases of seasonal observations of specific PV (pressure) are considered. The proposed methodology could either analyse the failure based on precursor data of PVs or obtain the optimum maintenance schedule based on actual condition of the systems.
Copyright © 2018 Elsevier B.V. All rights reserved.

Keywords:  Asset integrity assessment; Dynamic bayesian network; Influence diagram; Regression tools; Risk-based maintenance

Year:  2018        PMID: 30261435     DOI: 10.1016/j.jhazmat.2018.09.044

Source DB:  PubMed          Journal:  J Hazard Mater        ISSN: 0304-3894            Impact factor:   10.588


  2 in total

1.  Bayesian Estimation for Reliability Engineering: Addressing the Influence of Prior Choice.

Authors:  Leonardo Leoni; Farshad BahooToroody; Saeed Khalaj; Filippo De Carlo; Ahmad BahooToroody; Mohammad Mahdi Abaei
Journal:  Int J Environ Res Public Health       Date:  2021-03-24       Impact factor: 3.390

2.  Fuzzy Risk-Based Maintenance Strategy with Safety Considerations for the Mining Industry.

Authors:  Agnieszka Tubis; Sylwia Werbińska-Wojciechowska; Pawel Sliwinski; Radoslaw Zimroz
Journal:  Sensors (Basel)       Date:  2022-01-07       Impact factor: 3.576

  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.