Assessment of risk factors in forest road design and construction activities with fuzzy analytic hierarchy process approach in Turkey.

Anil Orhan Akay1, Murat Demir2, Mustafa Akgul2.   

Abstract

Forest road design and construction are time-consuming and complicated because various risk factors can be encountered during the process. The aim of this study is to comprehensively assess the risk factors in forest road design and construction using the fuzzy analytic hierarchy process (AHP) method in Turkey, thus contributing to the proper performance of these activities. Within the scope of the study, six main risk factors and 22 sub-risk factors were identified based on literature review. In order to determine the weights of the relevant risk factors, the opinions of three different groups [(group 1: academicians), (group 2: forest engineers (private sector employees + public sector employees)), (group 3: group 1 + group 2)] about the risk factors were obtained. Relevant risk factor weights were determined using the fuzzy AHP method. According to group 3, the most important main risk factors are technical risks and environmental risks. In addition, the most important sub-risk factors for each relevant main risk factor were incorrect road alignment, inadequate work safety in the field, insufficient capital, legal problems on the road alignment, landslide risk during road construction, and illegal logging. Differences were observed between groups 1 and 2 in the weight rankings of relevant risk factor. The results demonstrate that the fuzzy AHP method can be used effectively to assess the risks of forest road design and construction.

Entities:  

Keywords:  Forest road; Fuzzy logic; Multi criteria decision-making; Risk assessment

Mesh:

Year:  2018        PMID: 30167894     DOI: 10.1007/s10661-018-6948-0

Source DB:  PubMed          Journal:  Environ Monit Assess        ISSN: 0167-6369            Impact factor:   2.513


  3 in total

1.  Application of decision analysis to forest road deactivation in unstable terrain.

Authors:  Clay Allison; Roy C Sidle; David Tait
Journal:  Environ Manage       Date:  2004-02       Impact factor: 3.266

2.  Functional forest road network planning by consideration of environmental impact assessment for wood harvesting.

Authors:  Selcuk Gumus; H Hulusi Acar; Devlet Toksoy
Journal:  Environ Monit Assess       Date:  2007-09-15       Impact factor: 2.513

3.  Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

Authors:  Saman Aminbakhsh; Murat Gunduz; Rifat Sonmez
Journal:  J Safety Res       Date:  2013-06-06
  3 in total
  1 in total

1.  Quantitative assessment of enterprise environmental risk mitigation in the context of Na-tech disasters.

Authors:  Ruru Han; Beihai Zhou; Luyang An; Haibo Jin; Lei Ma; Nan Li; Ming Xu; Linjun Li
Journal:  Environ Monit Assess       Date:  2019-03-08       Impact factor: 2.513

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.