| Literature DB >> 30020336 |
Rafael Fernandes Bel Homo1, Antônio Fernandes Costa Lima2.
Abstract
OBJECTIVE: to identify the average direct cost of maintaining the patency of totally implanted central venous catheter with heparin at a Day Hospital of a public hospital of high complexity specialized in the treatment of cancer patients, and estimate the average direct cost of replacing heparin with sodium chloride 0.9%.Entities:
Mesh:
Substances:
Year: 2018 PMID: 30020336 PMCID: PMC6053289 DOI: 10.1590/1518-8345.2263.3004
Source DB: PubMed Journal: Rev Lat Am Enfermagem ISSN: 0104-1169
Distribution of the observations related to the first step “collection of material in the MAC* at the 11th floor”, according to cost with personnel. São Paulo, SP, Brazil, 2017
| Observations | n | Mean US$† | SD‡ US$† | Median US$† | Mode US$† | Minimum-Maximum US$† |
| Cost with Nurses | 08 | 1.75 | 0.55 | 1.60 | 1.60 | 1.2-3.0 |
| Cost with Technicians | 192 | 0.88 | 0.25 | 0.80 | 0.80 | 0.40-1.90 |
| Total average direct cost with personnel | 200 | 0.92 | 0.32 | 0.80 | 0.80 | 0.40-3.00 |
*MAC - Material and Drug Assistance Center; †Conversion rate: US$ 0.31/R$, quoted in 29/07/2016, provided by the Central Bank of Brazil; ‡SD - Standard deviation.
Distribution of the observations related to the second step “preparation of material and asepsis” according to cost with personnel, material, solutions and additional material. São Paulo, SP, Brazil, 2017
| Observations | n | Mean US$* | SD† US$* | Median US$* | Mode US$* | Minimum-Maximum US$* |
| Cost with Nurses | 200 | 1.29 | 0.46 | 1.20 | 1.40 | 0.40-4.00 |
| Cost with Material | 200 | 5.55 | 0.14 | 5.57 | 5.51 | 5.20-5.84 |
| Cost with Solutions | 200 | 0.96 | 0.07 | 0.96 | 0.96 | 0.95-1.71 |
| Cost with Additional Material | 25 | 0.71 | 0.00 | 0.71 | 0.71 | 0.71-0.71 |
| Total average direct cost | 200 | 7.89 | 0.67 | 7.86 | 7.46 | 6.55-11.41 |
*Conversion rate: US$ 0.31/R$, quoted in 29/07/2016, provided by the Central Bank of Brazil; †SD - Standard deviation
Distribution of the observations related to the second step “puncture and CVC-TI heparinization”* according to cost with personnel, material and solutions. São Paulo, SP, Brazil, 2017
| Observations | n | Mean US$† | SD‡ US$† | Median US$† | Mode US$† | Minimum-Maximum US$† |
| Cost with Nurses | 200 | 0.49 | 0.54 | 0.40 | 0.40 | 0.20-7.20 |
| Cost with Material | 03 | 4.76 | 0.73 | 4.42 | - | 4.27-5.60 |
| Cost with Solutions | 03 | 0.33 | 0.53 | 0.05 | - | 0.01-0.95 |
| Total average direct cost | 200 | 0.56 | 1.08 | 0.40 | 0.40 | 0.20-13.75 |
*CVC-TI - Totally implanted central venous catheter; †Conversion rate: US$ 0.31/R$, quoted in 29/07/2016, provided by the Central Bank of Brazil; ‡SD - Standard deviation
Distribution of the observations related to the fourth step “disposal of material” according to cost with personnel, material and solutions. São Paulo, SP, Brazil, 2017
| Observations | n | Mean US$* | SD† US$* | Median US$* | Mode US$* | Minimum-Maximum US$* |
| Cost with Nurses | 200 | 0.31 | 0.13 | 0.20 | 0.20 | 0.20-0.80 |
| Cost with Material | 196 | 0.03 | 0.02 | 0.02 | 0.02 | 0.01-0.11 |
| Cost with Solutions | 200 | 0.01 | 0.00 | 0.01 | 0.01 | 0.01-0.01 |
| Total average direct cost | 200 | 0.34 | 0.14 | 0.27 | 0.23 | 0.21-0.92 |
* Conversion rate: US$ 0.31/R$, quoted in 29/07/2016, provided by the Central Bank of Brazil; †SD - Standard deviation
Distribution of the average total direct cost in the four steps of heparinization of CVC-TI* and of the estimated average total direct cost with the use of 0.9% sodium chloride. São Paulo, SP, Brazil, 2017
| Maintenance of permeability with heparin (heparinization) | Total average direct cost US$† | SD‡ US$† | Minimum-Maximum US$† |
| Step 1 | 0.92 | 0.32 | 0.40-3.00 |
| Step 2 | 7.89 | 0.67 | 6.55-11.41 |
| Step 3 | 0.57 | 1.17 | 0.20-13.75 |
| Step 4 | 0.34 | 0.14 | 0.21-0.92 |
| Total average direct cost of heparinization | 9.71 | 1.35 | 7.98-23.28 |
| Maintenance of permeability with sodium chloride 0.9% (salinization) | Estimated total average direct cost US$† | SD‡ US$† | Minimum-Maximum US$† |
| Step 1 | 0.92 | 0.32 | 0.40-3.00 |
| Step 2 | 6.99 | 0.65 | 5.67-9.82 |
| Step 3 | 0.56 | 1.02 | 0.20-12.87 |
| Step 4 | 0.34 | 0.14 | 0.21-0.92 |
| Total average direct cost of salinization | 8.81 | 1.29 | 7.10-21.52 |
*CVC-TI - Totally implanted central venous catheter; †Conversion rate: US$ 0.31/R$ quoted in 29/07/2016, provided by the Central Bank of Brazil; ‡SD - Standard deviation