Literature DB >> 29994437

A Two-Phase Meta-Heuristic for Multiobjective Flexible Job Shop Scheduling Problem With Total Energy Consumption Threshold.

Deming Lei, Ming Li, Ling Wang.   

Abstract

Flexible job shop scheduling problem (FJSP) has been extensively considered; however, multiobjective FJSP with energy consumption threshold is seldom investigated, the goal of which is to minimize makespan and total tardiness under the constraint that total energy consumption does not exceed a given threshold. Energy constraint is not always met and the threshold is difficult to be decided in advance. These features make it more difficult to solve the problem. In this paper, a two-phase meta-heuristic (TPM) based on imperialist competitive algorithm (ICA) and variable neighborhood search (VNS) is proposed. In the first phase, the problem is converted into FJSP with makespan, total tardiness and total energy consumption and the new FJSP is solved by an ICA, which uses some new methods to build initial empires and do imperialist competition. In the second phase, new strategies are provided for comparing solutions and updating the nondominated set of the first phase and a VNS is used for the original problem. The current solution of VNS is periodically replaced with member of the set Ω to improve solution quality. An energy consumption threshold is obtained by optimization. Extensive experiments are conducted to test the performance of TPM finally. The computational results show that TPM is a very competitive algorithm for the considered FJSP.

Entities:  

Year:  2018        PMID: 29994437     DOI: 10.1109/TCYB.2018.2796119

Source DB:  PubMed          Journal:  IEEE Trans Cybern        ISSN: 2168-2267            Impact factor:   11.448


  2 in total

1.  An improved multi-objective imperialist competitive algorithm for surgical case scheduling problem with switching and preparation times.

Authors:  Hui Yu; Jun-Qing Li; Xiao-Long Chen; Wei Niu; Hong-Yan Sang
Journal:  Cluster Comput       Date:  2022-04-07       Impact factor: 2.303

2.  Optimization of a molten iron scheduling problem with uncertain processing time using variable neighborhood search algorithm.

Authors:  Linyu Liu; Zhiqi Chang; Shiji Song
Journal:  Sci Rep       Date:  2022-05-04       Impact factor: 4.379

  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.