Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

Saheed O Ajayi1, Lukumon O Oyedele2.   

Abstract

Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process.
Copyright © 2018. Published by Elsevier Ltd.

Keywords:  Construction waste; Landfill; Materials delivery; Materials take-off; Purchase management; Structural equation modelling; Waste-efficient procurement

Mesh:

Substances:

Year:  2018        PMID: 29426721     DOI: 10.1016/j.wasman.2018.01.025

Source DB:  PubMed          Journal:  Waste Manag        ISSN: 0956-053X            Impact factor:   7.145


  4 in total

1.  The Relationship Between Market Environment Dimensions and Availability of Malaria Pills in Uganda.

Authors:  Pross Nagitta Oluka; Marcia Mkansi; George William Kajjumba
Journal:  Glob Adv Health Med       Date:  2021-03-30

2.  A structural equation modeling of supply chain strategies for artemisinin-based combination therapies in Uganda.

Authors:  Oluka Pross Nagitta; Marcia Mkansi; Sylvia Desire Nyesiga; George William Kajjumba
Journal:  Med Access Point Care       Date:  2021-12-19

3.  Managerial Areas of Construction and Demolition Waste: A Scientometric Review.

Authors:  Jianguo Chen; Yangyue Su; Hongyun Si; Jindao Chen
Journal:  Int J Environ Res Public Health       Date:  2018-10-24       Impact factor: 3.390

4.  A Study on Supply-Demand Satisfaction of Community-Based Senior Care Combined with the Psychological Perception of the Elderly.

Authors:  Jiangang Shi; Wenwen Hua; Daizhong Tang; Ke Xu; Quanwei Xu
Journal:  Healthcare (Basel)       Date:  2021-05-29
  4 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.