Literature DB >> 29353678

Cost effectiveness of phosphorus removal processes in municipal wastewater treatment.

Rania Bashar1, Kerem Gungor2, K G Karthikeyan3, Phillip Barak4.   

Abstract

Meeting stringent phosphorus (P) discharge standards remains one of the major challenges for wastewater utilities due to increased economic burdens associated with advanced (i.e., secondary, tertiary) treatment processes. In a trade-off between higher treatment cost and enhanced P removal, it is critical for the treatment plants to be able to select the most appropriate technology. To this end, established/emerging high performing P removal/recovery technologies (e.g., Modified University of Cape Towne process, Bardenpho process, membrane bioreactors, IFAS-EBPR, struvite recovery, tertiary reactive media filtration) were identified and full-scale treatment plant designs were developed. Using advanced mathematical modeling techniques, six different treatment configurations were evaluated in terms of performance and cost effectiveness ($/lb of P removed). Results show that the unit cost for P removal in different treatment alternatives range from $42.22 to $60.88 per lb of P removed. The MUCT BNR + tertiary reactive media filtration proved to be one of the most cost effective configurations ($44.04/lb P removed) delivering an effluent with total P (TP) concentration of only 0.05 mg/L. Although struvite recovery resulted in significant reduction in biosolids P, the decrease in effluent TP was not sufficient to meet very stringent discharge standards.
Copyright © 2018 Elsevier Ltd. All rights reserved.

Entities:  

Keywords:  Biological phosphorus removal; Cost of phosphorus removal; Energy requirements; Phosphorus recovery; WWTP sustainability; Waste resource recovery

Mesh:

Substances:

Year:  2018        PMID: 29353678     DOI: 10.1016/j.chemosphere.2017.12.169

Source DB:  PubMed          Journal:  Chemosphere        ISSN: 0045-6535            Impact factor:   7.086


  3 in total

1.  Phosphorus removal from secondary wastewater effluent using copper smelter slag.

Authors:  Moatlhodi Wise Letshwenyo; Thandie Veronicah Sima
Journal:  Heliyon       Date:  2020-06-16

2.  Optimize the Preparation of Novel Pyrite Tailings Based Non-sintered Ceramsite by Plackett-Burman Design Combined With Response Surface Method for Phosphorus Removal.

Authors:  Ruihuan Chen; Zhenlin Pan; Shuyi Chu; Jibo Xiao; Rengui Weng; Da Ouyang; Yunlong Yang; Xiangting Wu; Zhida Huang
Journal:  Front Chem       Date:  2022-03-08       Impact factor: 5.221

3.  A new approach to enhance the conventional two-phase anaerobic co-digestion of food waste and sewage sludge.

Authors:  Mohammad Aminzadeh; Mohammad Javad Bardi; Hassan Aminirad
Journal:  J Environ Health Sci Eng       Date:  2021-01-07
  3 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.