| Literature DB >> 29273033 |
Deogratius Bintabara1,2, Keiko Nakamura3, Kaoruko Seino1.
Abstract
BACKGROUND: Global policy reports, national frameworks, and programmatic tools and guidance emphasize the integration of family planning and HIV testing and counseling services to ensure universal access to reproductive health care and HIV prevention. However, the status of integration between these two services in Tanzanian health facilities is unclear. This study examined determinants of facility readiness for integration of family planning with HIV testing and counseling services in Tanzania.Entities:
Keywords: Facility readiness; Family planning; HIV testing and counseling; Integration; Tanzania
Mesh:
Year: 2017 PMID: 29273033 PMCID: PMC5741912 DOI: 10.1186/s12913-017-2809-8
Source DB: PubMed Journal: BMC Health Serv Res ISSN: 1472-6963 Impact factor: 2.655
Percentage distribution of surveyed facilities according to background characteristics, Tanzania SPA 2014–15 (n = 1188)
| Variable | Number (weighted) ( | Percentage (%) |
|---|---|---|
| Facility location | ||
| Zanzibar | 44 | 3.7 |
| Mainland | 1144 | 96.3 |
| Managing authority | ||
| Public | 857 | 72.2 |
| Private | 331 | 27.8 |
| Facility type | ||
| Hospital | 46 | 3.9 |
| Health center | 129 | 10.8 |
| Clinic & dispensary | 1013 | 85.3 |
| Facility residence | ||
| Urban | 324 | 27.3 |
| Rural | 864 | 72.7 |
| Routine management meetings | ||
| No | 266 | 22.4 |
| Yes | 922 | 77.6 |
| FP and HTC guidelines | ||
| Not available | 664 | 55.9 |
| Available | 524 | 44.1 |
| Staff trained for FP and HTC | ||
| Not available | 1052 | 88.5 |
| Available | 136 | 11.5 |
| Laboratories for HIV testing | ||
| Not available | 346 | 29.1 |
| Available | 842 | 70.9 |
| External supervision | ||
| Not done | 34 | 3.0 |
| Done | 1154 | 97.0 |
Percentage distribution of health facilities with the availability and readiness to offer FP and HTC services, Tanzania SPA 2014–15 (n = 1188)
| Variable | *Number (weighted) ( | *Percentage (%) |
|---|---|---|
| Service availability | ||
| FP | 948 | 79.8 |
| HTC | 1039 | 87.5 |
| Both | 915 | 77.0 |
| Components of FP readiness index | ||
| Staff and guidelines | 487 | 41.0 |
| Equipment | 677 | 57.0 |
| Medicine/commodities | 307 | 25.9 |
| Components of HTC readiness index | ||
| Staff and guidelines | 380 | 32.0 |
| Laboratory capacity to test HIV | 842 | 70.9 |
| Supplies/commodities | 674 | 56.7 |
| Overall facility readiness | ||
| FP | 720 | 60.6 |
| HTC | 701 | 59.0 |
| Integrated services | 536 | 45.1 |
Determinants of FRIFHS in bivariate and multivariate analyses, Tanzania SPA 2014–2015 (n = 1188)
| Variable | COR [95%CI] |
| AOR [95%CI] |
|
|---|---|---|---|---|
| Facility location | ||||
| Zanzibar | 1 | 1 | ||
| Mainland | 1.6 [1.1–2.5] | 0.043 | 1.3 [0.6–2.7] | 0.871 |
| Managing authority | ||||
| Private | 1 | 1 | ||
| Public | 8.5 [5.2–13.8] | 0.000 | 3.2 [1.9–5.6] | 0.000 |
| Facility type | ||||
| Hospital | 1 | |||
| Health center | 1.1 [0.8–1.7] | 0.478 | – | |
| Clinic & dispensary | 1.2 [0.8–1.7] | 0.423 | ||
| Facility Residence | ||||
| Urban | 1 | 1 | ||
| Rural | 2.6 [1.7–3.9] | 0.000 | 1.1 [0.6–1.9] | 0.759 |
| Routine management meetings | ||||
| No | 1 | 1 | ||
| Yes | 1.7 [1.1–2.6] | 0.010 | 1.9 [1.1–3.3] | 0.014 |
| External supervision | ||||
| Not done | 1 | 1 | ||
| Done | 3.7 [0.8–16.9] | 0.093 | 1.6 [0.2–11.2] | 0.656 |
| FP and HTC guidelines | ||||
| Not available | 1 | 1 | ||
| Available | 7.1 [4.8–10.2] | 0.000 | 3.8 [2.4–5.8] | 0.000 |
| Staff trained in FP and HTC | ||||
| Not available | 1 | 1 | ||
| Available | 4.7 [2.5–8.7] | 0.000 | 2.6 [1.3–5.2] | 0.006 |
| Laboratories for HIV testing | ||||
| Not available | 1 | 1 | ||
| Available | 32.8 [16.5–65.1] | 0.000 | 17.1 [8.2–35.6] | 0.000 |
“1” indicates the categories considered as references when comparing odds ratios
--- Variable was not included in multivariate analysis because P > 0.2 in bivariate analysis