| Literature DB >> 29087619 |
Anne G Fitzpatrick1, Sabine E Apitz2, David Harrison3, Betsy Ruffle4, Deborah A Edwards5.
Abstract
This article introduces the Portland Harbor Superfund Site Sustainability Project (PHSP) special series in this issue. The Portland Harbor Superfund Site is one of the "mega-sediment sites" in the United States, comprising about 10 miles of the Lower Willamette River, running through the heart of Portland, Oregon. The primary aim of the PHSP was to conduct a comprehensive sustainability assessment, integrating environmental, economic, and social considerations of a selection of the remedial alternatives laid out by the US Environmental Protection Agency. A range of tools were developed for this project to quantitatively address environmental, economic, and social costs and benefits based upon diverse stakeholder values. In parallel, a probabilistic risk assessment was carried out to evaluate the risk assumptions at the core of the remedial investigation and feasibility study process. Integr Environ Assess Manag 2018;14:17-21.Entities:
Keywords: Economic impact assessment; Environmental cost-benefit analysis (EIBA); Portland Harbor Superfund Site Sustainability Project; Probabilistic risk assessment (PRA); Sustainable social values assessment (SVA)
Mesh:
Substances:
Year: 2017 PMID: 29087619 DOI: 10.1002/ieam.1997
Source DB: PubMed Journal: Integr Environ Assess Manag ISSN: 1551-3777 Impact factor: 2.992