| Literature DB >> 28987916 |
S Szklarek1, I Wagner2, T Jurczak2, M Zalewski2.
Abstract
The study analyses the efficiency of a Sequentional Sedimentation-Biofiltration System (SSBS) built on the Sokolowka river in Lodz (Poland). It was constructed to purify a small urban river whose hydrological regime is dominated by stormwater and meltwater. The SSBS was constructed on a limited area as multi-zone constructed wetlands. The SSBS consists of three zones: sedimentation zone with structures added to improve sedimentation, a geochemical barrier made of limestone deposit and biofiltration zone. The purification processes of total suspended solids (TSS), total phosphorus (TP), total nitrogen (TP) and other nutrients: phosphates (PO43-), ammonium (NH4+) and nitrates (NO3-) of the SSBS were analyzed. Chloride (Cl-) reduction was investigated. Monitoring conducted in the first two hydrological years after construction indicated that the SSBS removed 61.4% of TSS, 37.3% of TP, 30.4% of PO43-, 46.1% of TN, 2.8% of NH4+, 44.8% of NO3- and 64.0% of Cl-. The sedimentation zone played a key role in removing TSS and nutrients. The geochemical barrier and biofiltration zone each significantly improved overall efficiency by 4-10% for TSS, PO43-, TN, NO3- and Cl-. Although the system reduced the concentration of chloride, further studies are needed to determine the circulation of Cl- in constructed wetlands (CWs), and to assess its impact on purification processes.Entities:
Keywords: Multi-zone constructed wetland; Nutrients; Sediments; Stormwater; Urban runoff; Water quality
Mesh:
Substances:
Year: 2017 PMID: 28987916 DOI: 10.1016/j.jenvman.2017.09.066
Source DB: PubMed Journal: J Environ Manage ISSN: 0301-4797 Impact factor: 6.789