| Literature DB >> 28877933 |
Marasi Mwencha1, James E Rosen2, Cary Spisak3, Noel Watson4, Noela Kisoka1, Happiness Mberesero1.
Abstract
BACKGROUND: To address challenges in public health supply chain performance, Tanzania invested in a national logistics management unit (LMU) and a national electronic logistics management information system (eLMIS). This evaluation examined the impact of those 2 key management upgrades approximately 1 year after they were introduced.Entities:
Mesh:
Substances:
Year: 2017 PMID: 28877933 PMCID: PMC5620337 DOI: 10.9745/GHSP-D-16-00395
Source DB: PubMed Journal: Glob Health Sci Pract ISSN: 2169-575X
FIGURE 1Conceptual Framework for the Management Upgrade Interventions
Abbreviations: eLMIS, electronic logistics management information system; LMU, Logistics Management Unit.
Survey Instruments
| Survey | Sample | Timing |
|---|---|---|
| Distribution and dispensing of commodities | Nationally representative sample of 220 SDPs | Baseline: August, October 2013 |
| Performance and cost | 17 district offices | Baseline: October 2013 |
| Data use and management practice | 16 central-level supply chain stakeholders | Baseline: October–November 2013 |
Abbreviations: MSD, Medical Stores Department; SDPs, service delivery points.
Data Use Scores, Baseline Versus Round 1, by Product Group
| Product Group and Time Period | Data Use Dimension | Average | |||
|---|---|---|---|---|---|
| Accessibility | Visibility | Timeliness | Transparency | ||
| Baseline | 71 | 21 | 62 | 100 | |
| Round 1 | 81 | 81 | 63 | 92 | |
| Baseline | 76 | 74 | 72 | 71 | |
| Round 1 | 82 | 88 | 71 | 92 | |
| Baseline | 65 | 34 | 71 | 71 | |
| Round 1 | 61 | 100 | 56 | 92 | |
| Baseline | 53 | 51 | 56 | 36 | |
| Round 1 | 86 | 86 | 70 | 92 | |
| Baseline | 66 | 45 | 65 | 70 | |
| Round 1 | 77 | 89 | 65 | 92 | |
Abbreviations: ILS, integrated logistics system; MCH, maternal and child health.
Scores on Management Practice Indicators, Baseline Versus Round 1, by Level and Product Group
| Level and Product Group | Management Practice Area | Super Index Score | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Storage | Inventory Management | Transportation | Logistics Data Management | Other Management | ||||||||
| Baseline | Round 1 | Baseline | Round 1 | Baseline | Round 1 | Baseline | Round 1 | Baseline | Round 1 | Baseline | Round 1 | |
| HIV | 80 | 75 | 62 | 63 | — | — | 71 | 72 | 92 | 93 | 77 | 78 |
| ILS | 67 | 66 | 68 | 68 | — | — | 65 | 63 | 67 | 67 | 62 | 67 |
| HIV | 75 | — | 77 | — | 54 | — | 46 | 45 | 51 | 75 | 63 | 69 |
| ILS | 73 | — | 77 | — | 53 | — | 63 | 52 | 67 | 74 | 63 | 66 |
| HIV | 91 | 89 | 82 | 81 | 62 | 75 | 81 | 51 | 61 | 67 | 75 | 74 |
| ILS | 98 | 83 | 84 | 81 | 63 | 74 | 69 | 52 | 40 | 50 | 65 | 68 |
* P<.10; **P<.05; ***P<.01.
Abbreviations: ILS, integrated logistics system; SDP, service delivery point.
a Other management practices comprise design and planning as well as monitoring and control.
b Because of the shift to direct delivery from zonal stores to SDPs at round 1, round-1 storage, inventory management, and transportation scores were absent.
FIGURE 2Stock-out Rates and Stock-Out Duration Greater Than 7 Days, Baseline Versus Round 1, by Product Group
Average Central and Zonal Expiry Rates as Percentage of Throughput, Baseline Versus Round 1
| Product Group | Expiry Rate (%) | |
|---|---|---|
| Baseline | Round 1 | |
| HIV | 1.17 | 0.12 |
| Essential medicines | 3.36 | 3.58 |
| Family planning and MCH | 2.45 | 1.46 |
| Malaria | 2.66 | 3.41 |
| ILS | 3.10 | 3.44 |
Abbreviations: ILS, integrated logistics system; MCH, maternal, newborn, and child health.
Supply Chain Costs by Main Supply Chain Function, Baseline Versus Round 1
| Supply Chain Function | TSh in billions (US$ in millions) | |
|---|---|---|
| Baseline | Round 1 | |
| Procurement | 0.4 (0.3) | 0.3 (0.2) |
| Storage | 29.7 (18.9) | 31.7 (20.2) |
| Transport | 12.0 (7.6) | 11.1 (7.0) |
| Management | 20.2 (12.9) | 23.8 (15.1) |
Comparison in Number of Facilities Served, by Supply Chain Tier, Baseline Versus Round 1
| Supply Chain Tier | Baseline | Round 1 | % Increase |
|---|---|---|---|
| District | 125 | 164 | 31% |
| Dispensary | 3,851 | 4,630 | 20% |
| Health center | 449 | 493 | 10% |
| District hospital | 154 | 191 | 24% |
| Regional hospital | 16 | 21 | 31% |
| Referral hospital | 4 | 4 | 0% |
Cost-Effectiveness Comparison Measures
| Measure | Baseline | Round 1 |
|---|---|---|
| Supply chain cost (TSh) | 62.3 billion | 66.9 billion |
| Value of throughput (TSh) | 242 billion | 298 billion |
| % point product availability | 68 | 78 |
| Supply chain cost as % of value of throughput | 25.7% | 22.5% |
| Supply chain cost per performance-adjusted throughput value | 37.9% | 28.5% |
Results of Sensitivity Analysis Using Monte Carlo Simulation for Cost, Throughput, and Cost-Effectiveness Measures
| Cost, Throughput, and Cost-Effectiveness Measures | Baseline | Round 1 | ||
|---|---|---|---|---|
| Mean (SD) | 95% CI | Mean (SD) | 95% CI | |
| Total cost (Tsh billion) | 62.6 (2.2) | 58.3, 67.0 | 69.0 (3.1) | 62.9, 75.1 |
| Total throughput value | 242.4 (5.6) | 231.4, 253.3 | 297.7 (7.3) | 283.4, 311.9 |
| Cost as a percentage of product value, unadjusted | 25.9% (1.1%) | 23.7%, 28.0% | 23.2% (1.2%) | 20.9%, 25.5% |
| Cost as a percentage of product value, performance-adjusted | 38.2% (1.8%) | 34.6%, 41.7% | 29.4% (1.6%) | 26.3%, 32.4% |
Abbreviations: CI, confidence interval; SD, standard deviation.
a Parameter for which there was no overlap in the 95% confidence interval for the baseline and round 1 measures.
Upfront Investment and Ongoing Operating Costs of the eLMIS and LMU (US$)
| Category | Actual | Projected | ||||
|---|---|---|---|---|---|---|
| Start-up | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| Development and rollout | 1,768,395 | |||||
| Operations | 698,110 | 772,552 | 633,727 | 481,102 | 481,102 | |
| Design | 124,693 | — | — | — | — | — |
| Project implementation and technical assistance | 208,279 | — | 30,000 | 30,000 | 30,000 | 30,000 |
| Existing staffing, supervision, training | — | 1,206,032 | 1,237,960 | 1,270,847 | 1,304,720 | 1,339,609 |
| Incremental staffing | — | 533,758 | 549,771 | 566,264 | 583,252 | 600,749 |
| Incremental supervision and training | 114,215 | 264,322 | 264,027 | 264,027 | 264,027 | 264,027 |
| Vehicles, transport, equipment, etc. | — | 91,687 | 101,760 | 107,866 | 114,338 | 121,198 |
| Office space, equipment, supplies, utilities for LMU | 142,696 | 74,072 | 85,338 | 85,338 | 85,338 | 85,338 |
Abbreviations: eLMIS, electronic logistics management information system; LMU, logistics management unit.
a Personnel and supervision/training activities that were included in the organization's budget before the management upgrades were implemented.
Estimated Cost Savings and Return on Investment After Implementation of the Upgraded Management System (US$)
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
|---|---|---|---|---|---|
| Annual government drug purchases | 47,714,539 | 61,782,129 | 70,716,350 | 79,651,204 | 88,586,058 |
| Average drop in drug costs from better management practices | 668,004 | 864,950 | 990,029 | 1,115,117 | 1,240,205 |
| Current annual drug throughput subject to expiry | 166,707,098 | 123,202,782 | 134,928,853 | 145,538,815 | 155,590,406 |
| Change in expiry rate after better management practices | 625,152 | 462,010 | 505,983 | 545,771 | 583,464 |
| Estimated cost savings due to better management | 1,293,155 | 1,326,960 | 1,496,012 | 1,660,887 | 1,823,669 |
| Absorbed existing staff, supervision, and training | 1,206,032 | 1,237,960 | 1,270,847 | 1,304,720 | 1,339,609 |
| 2,499,187 | 2,564,921 | 2,766,859 | 2,965,607 | 3,163,278 | |
| 2,867,981 | 3,041,408 | 2,958,068 | 2,862,776 | 2,922,023 | |
| (368,794) | (476,487) | (191,209) | 102,831 | 241,255 | |
| (2,727,072) | (3,203,559) | (3,394,768) | (3,291,937) | (3,050,682) | |
| −52% | −39% | −30% | −23% | −18% | |
a Includes US$2,358,278 in start-up costs.