Water services providers should supply water that is fit for human consumption, taking into account multi-barrier approaches and technical aspects such as design aspects, operation monitoring, final water quality compliance monitoring, plant monitoring practices, maintenance, and risk management practices. Against this background, this study focused on applying the diagnostic tool for technical compliance as well as assessing the compliance of water treatment plants with management norms. Six plants in the Vhembe District Municipality were selected; the Vondo, Malamulele, Mutshedzi, and Mutale plants (conventional), and the Dzingahe and Tshedza package plants. During the first assessment, four (Malamulele, Mutshedzi, Mutale and Dzingahe) plants scored between 44% and 49% and achieved Class 3 certification, revealing serious challenges requiring immediate intervention. Two water plants (Vondo and Tshedza, scoring 53% and 63%, respectively) were in the Class 2 category, revealing serious challenges requiring attention and improvement. During the second assessment, all plants scored between 63% and 87% (Class 2 category). The greatest improvement (30%) was noted for the Dzingahe and Tshedza plants, followed by the Malamulele plant, while the Mutale, Vondo, and Mutshedzi plants improved their scores by 20%, 17% and 14%, respectively. After corrective actions and re-measurement, no plant complied. It is recommended that Water Services Providers (WSPs) regularly apply the diagnostic tools and water safety plans as developed in order to comply with applicable standards.Entities:
Keywords: Limpopo; South Africa; drinking water; non-metropolitan city; water management; water quality
Mesh:
Substances:
Year: 2017 PMID: 28753964 PMCID: PMC5551248 DOI: 10.3390/ijerph14070810
Source DB: PubMed Journal: Int J Environ Res Public Health ISSN: 1660-4601 Impact factor: 3.390
Figure 1South African map with the locations of water treatment plants.
Figure 2Technical diagnostic tool framework developed by Momba and co-workers (2009) to assess compliance of small water treatment plants. DWAF: Department of Water Affairs and Forestry.
Ranking of the problem areas in priority order.
| Ranking of the Problem Areas in Priority Order | |
|---|---|
| 1 | Insignificant health consequence |
| 2 | Minor health consequence |
| 3 | Moderate health consequence |
| 4 | Major health consequence |
| 5 | Catastrophic health consequence |
Technical compliance assessment scoring [22].
| Criterion | Weight % |
|---|---|
| Technical Compliance Scoring | |
| 1A: Design aspects | 0.1 |
| 1B: Operation monitoring practices | 0.2 |
| 1C: Compliance (final water quality) monitoring practices | 0.3 |
| 1D: Plant monitoring practices | 0.1 |
| 1E: Maintenance practices | 0.2 |
| 1F: Risk management practices | 0.1 |
| TOTAL | 1.0 |
Technical compliance rating of the treatment plants [22].
| Total Weighted Score | Rating Description |
|---|---|
| 0–50 | |
| 50–90 | |
| 90–100 |
Monitoring of turbidity (NTU) in selected plants.
| Plant Name | Sampling Points/Sampling Period | |||||||
|---|---|---|---|---|---|---|---|---|
| First Assessment | Second Assessment | |||||||
| RW | FW | PoT | PoU | RW | FW | PoT | PoU | |
| Turbidity (NTU) | ||||||||
| Vondo Water Scheme | 3.01 | 0.99 | 1.44 | 1.39 | 3.73 | 1.45 | 1.86 | 1.81 |
| Malamulele Water Treatment Plant | 10.36 | 0.28 | 0.36 | 0.53 | 13.44 | 0.37 | 0.52 | 0.55 |
| Mutale Regional Water Plant | 5.04 | 0.40 | 0.82 | 0.78 | 4.63 | 0.72 | 1.88 | 3.10 |
| Mutshedzi Drinking Water Plant | 6.25 | 0.84 | 1.48 | 1.64 | 24.25 | 2.41 | 3.34 | 4.35 |
| Tshedza Package Plant | 4.29 | None | 0.91 | 1.24 | 16.23 | None | 1.46 | 2.55 |
| Dzingahe Package Plant | 19.61 | None | 4.03 | None | 40.65 | None | 7.89 | None |
RW: raw water, FW: filtered water, PoT: point of treatment, PoU: point of use and None: no water samples were collected.
Monitoring of temperature and pH in selected plants.
| Plant Name | Sampling Points/Sampling Period | |||||||
|---|---|---|---|---|---|---|---|---|
| First Assessment | Second Assessment | |||||||
| RW | FW | PoT | PoU | RW | FW | PoT | PoU | |
| Temperature (°C) | ||||||||
| Vondo Water Scheme | 27.6 | 27.4 | 27.2 | 27.4 | 25.5 | 25.8 | 26.6 | 27.2 |
| Malamulele Drinking Water Plant | 28.1 | 27.8 | 27.3 | 27.7 | 29.0 | 28.1 | 27.9 | 28.9 |
| Mutshedzi Drinking Water Plant | 27.9 | 28.3 | 27.3 | 28.6 | 26.9 | 27.9 | 28.6 | 29.6 |
| Mutale Regional Water Plant | 29.9 | 28.5 | 28.2 | 29.1 | 28.2 | 28.2 | 29.8 | 30.5 |
| Tshedza Package Plant | 27.1 | None | 27.8 | None | 27.8 | None | 28.0 | 30.5 |
| Dzingahe Package Plant | 27.5 | None | 27.9 | 29.9 | 30.9 | None | 29.6 | None |
| pH | ||||||||
| Vondo Water Scheme | 6.61 | 6.36 | 6.41 | 6.27 | 7.00 | 7.35 | 7.2 | 7.3 |
| Malamulele Drinking Water Plant | 7.26 | 7.45 | 6.63 | 7.04 | 7.24 | 7.52 | 7.12 | 6.89 |
| Mutshedzi Drinking Water Plant | 7.62 | 6.51 | 7.55 | 6.85 | 7.49 | 6.43 | 7.20 | 7.47 |
| Mutale Regional Water Plant | 7.54 | 6.45 | 6.64 | 6.76 | 7.60 | 7.35 | 6.20 | 7.60 |
| Tshedza Package Plant | 6.81 | None | 7.97 | 6.99 | 7.00 | None | 7.65 | 7.60 |
| Dzingahe Package Plant | 6.38 | None | 6.74 | None | 6.81 | None | 7.17 | None |
RW: raw water, FW: filtered water, PoT: point of treatment, PoU: point of use; None: no water samples were collected.
Monitoring of residual chlorine (mg/L) in selected plants.
| Plant Name | Sampling Points/Sampling Period | |||
|---|---|---|---|---|
| First Assessment | Second Assessment | |||
| PoT | PoU | PoT | PoU | |
| Residual chlorine | ||||
| Vondo Water Scheme | 0.37 | 0.23 | 0.60 | 0.35 |
| Malamulele Water Treatment Plant | 0.48 | 0.28 | 0.10 | 0.60 |
| Mutale Regional Water Plant | 0.62 | 0.44 | 1.50 | 0.75 |
| Mutshedzi Drinking Water Plant | 0.53 | 0.14 | 1.50 | 0.30 |
| Tshedza Package Plant | 0.43 | 0.24 | 0.20 | 0.20 |
| Dzingahe Package Plant | 0.69 | None | 1.00 | None |
PoT: point of treatment, PoU: point of use; None: no water samples were collected.
Microbiological monitoring of water quality in selected plants: total coliforms and Escherichia coli (MPN/100 mL). MPN: most probable number.
| Plant Name | Sampling Points/Sampling Period | |||||||
|---|---|---|---|---|---|---|---|---|
| First Assessment | Second Assessment | |||||||
| RW | FW | PoT | PoU | RW | FW | PoT | PoU | |
| Total coliforms (MPN/100 mL) | ||||||||
| Vondo Water Scheme | 625.50 | 342.00 | 236.60 | 212.20 | 485.80 | 220.00 | 133.30 | 170.00 |
| Malamulele Water Treatment Plant | 755.60 | 239.70 | 344.90 | 166.30 | 579.40 | 323.00 | 268.10 | 256.10 |
| Mutale regional Water Plant | 1553.1 | 868.80 | 377.10 | 387.90 | 495.00 | 293.00 | 172.00 | 158.00 |
| Mutshedzi Drinking Water Plant | 629.40 | 418.10 | 254.30 | 212.20 | 613.1 | 402.00 | 283.60 | 294.50 |
| Tshedza Package Plant | 1011.20 | None | 466.80 | 341.70 | 1011.20 | None | 427.30 | 211.90 |
| Dzingahe Package Plant | 960.60 | None | 454.00 | None | 791.5 | None | 304.20 | None |
| Vondo Water Scheme | 230.00 | 110.00 | 98.10 | 90.00 | 145.00 | 120.00 | 84.00 | 77.40 |
| Malamulele Water Treatment Plant | 316.20 | 193.00 | 112.00 | 136.10 | 154.80 | 116.00 | 97.00 | 93.00 |
| Mutale Regional Water Plant | 659.16 | 445.00 | 193.00 | 171.40 | 308.40 | 183.00 | 108.00 | 98.30 |
| Mutshedzi Drinking Water Plant | 213.50 | 130.00 | 98.50 | 77.50 | 277.30 | 120.00 | 90.00 | 95.00 |
| Tshedza Package Plant | 880.90 | None | 213.50 | 112.10 | 697.60 | None | 255.70 | 108.30 |
| Dzingahe Package Plant | 501.10 | None | 328.40 | None | 548.00 | None | 120.00 | None |
RW: raw water, FW: filtered water, PoT: point of treatment, PoU: point of use; None: no water samples were collected.
Statistical analysis of drinking water collected from different sampling points.
| Group | No Observation | Mean | Std. Dev | ||
|---|---|---|---|---|---|
| Chlorine (mg/L) | First assessment | 22 | 0.518 | 0.556 | 0.234 |
| Second assessment | 44 | 0.398 | 0.259 | ||
| Turbidity (NTU) | First assessment | 43 | 7.122 | 12.292 | 0.0203 |
| Second assessment | 84 | 3.282 | 6.154 | ||
| Coliforms including | First assessment | 48 | 197.621 | 342.664 | 0.1758 |
| Second assessment | 96 | 310.446 | 520.421 | ||
| Temperature (°C) | First assessment | 42 | 22.376 | 10.850 | 0.4800 |
| Second assessment | 54 | 23.910 | 10.238 | ||
| pH (pH Unit) | First assessment | 48 | 6.584 | 2.295 | 0.5391 |
| Second assessment | 89 | 6.373 | 1.672 | ||
CFU: Colony forming units; Std. Dev: Standard deviation.
Technical assessment: first assessment: period between August 2008 and June 2009.
| Name of Plant | Malamulele Drinking Water Plant | Vondo Water Scheme | Mutshedzi Water Treatment Plant | Mutale Regional Water Treatment Plant | Tshedza Package Plant | Dzingahe Package Plant |
|---|---|---|---|---|---|---|
| 1A. Design aspect (10%) | 8 | 7 | 8 | 7 | 8 | 8 |
| 1B. Operation monitoring practices (20%) | 6 | 13 | 8 | 8 | 11 | 8 |
| 1C. Compliance (final water quality) monitoring practices (30%) | 23 | 15 | 15 | 15 | 26 | 15 |
| 1D. Plant monitoring practices (10%) | 4 | 6 | 4 | 6 | 6 | 10 |
| 1E. Maintenance practices (20%) | 6 | 10 | 12 | 10 | 6 | 6 |
| 1F. Risk management practices (10%) | 0 | 0 | 0 | 0 | 0 | 0 |
| Total scores | 47% | 51% | 47% | 46% | 57% | 47% |
Technical assessment: second assessment: period between November and December 2010.
| Second Assessment Name of Plant | Malamulele Drinking Water Plant | Vondo Water Scheme | Mutshedzi Water Treatment Plant | Mutale Regional Water Treatment Plant | Tshedza Package Plant | Dzingahe Package Plant |
|---|---|---|---|---|---|---|
| 1A. Design aspect (10%) | 8 | 8 | 9 | 9 | 9 | 8 |
| 1B. Operation monitoring practices (20%) | 9 | 9 | 11 | 15 | 14 | 14 |
| 1C. Compliance (final water quality) monitoring practices (30%) | 25 | 23 | 23 | 15 | 27 | 23 |
| 1D. Plant monitoring practices (10%) | 6 | 4 | 6 | 6 | 6 | 6 |
| 1E. Maintenance practices (20%) | 14 | 17 | 13 | 17 | 16 | 14 |
| 1F. Risk management practices (10%) | 7 | 7 | 7 | 10 | 10 | 10 |
| Total scores | 69% | 68% | 69% | 72% | 82% | 75% |