Literature DB >> 28734634

Immediate implant placement: the fate of the buccal crest. A retrospective cone beam computed tomography study.

E Groenendijk1, T A Staas2, F E J Graauwmans3, E Bronkhorst4, L Verhamme5, T Maal6, G J Meijer7.   

Abstract

This retrospective study aimed to analyse the fate of the buccal crest after immediate implant placement (IIP) through the use of cone beam computed tomography (CBCT). In 16 consecutive patients, an implant was placed in a more palatal position after extraction, thereby creating a gap of at least 2mm between the implant and the buccal crest. Subsequently, this gap was filled with a bone substitute. Preoperatively, immediate postoperatively, and late postoperatively, a CBCT was made to measure the thickness of the buccal crest. After application of the bone substitute, the buccal crest increased in thickness from 0.9mm to 2.4mm (mean). At a mean of 103 weeks after IIP, late postoperative CBCT scans showed that the thickness of the buccal crest was compacted to 1.8mm. In the same period, the height of the buccal crest increased by 1.6mm (mean) to, on average, 1.2mm above the implant shoulder. The aesthetic outcome was analysed using the White and Pink Esthetic Score (WES and PES). Both scored high: 8.4 and 11.8, respectively. Within the limitations of this study, the results of this IIP protocol are promising. Long-term prospective research on this topic on a large number of patients is necessary.
Copyright © 2017 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.

Entities:  

Keywords:  aesthetics in dentistry; buccal crest; buccal gap; cone beam computer tomography; dental implant; immediate implant placement; implant position

Mesh:

Substances:

Year:  2017        PMID: 28734634     DOI: 10.1016/j.ijom.2017.06.026

Source DB:  PubMed          Journal:  Int J Oral Maxillofac Surg        ISSN: 0901-5027            Impact factor:   2.789


  6 in total

1.  Digital Workflow for Immediate Implant Placement and Chairside Provisionalization in the Esthetic Zone.

Authors:  Vincent J J Donker; Gerry M Raghoebar; Arjan Vissink; Henny J A Meijer
Journal:  Case Rep Dent       Date:  2022-04-01

2.  Esthetic outcome of immediately placed and nonfunctionally loaded implants in the anterior maxilla utilizing a definitive abutment: A pilot clinical trial.

Authors:  Sandra AlTarawneh; Ahmad A S Hamdan; Abeer Alhadidi; Susan Hattar; Mohammad Al-Rabab'ah; Zaid Baqain
Journal:  Dent Res J (Isfahan)       Date:  2020-03-17

3.  Buccal bone thickness at dental implants in the maxillary anterior region with large bony defects at time of immediate implant placement: A 1-year cohort study.

Authors:  Henny J A Meijer; Kirsten W Slagter; Arjan Vissink; Gerry M Raghoebar
Journal:  Clin Implant Dent Relat Res       Date:  2018-12-11       Impact factor: 3.932

4.  Soft-tissues stabilization after immediate implant; platform switch with supraperiosteal augmentation.

Authors:  Farhan Durrani; Rakhshinda Nahid; Samidha Pandey; Himani Painuly; Akanksha Shukla
Journal:  J Indian Soc Periodontol       Date:  2021-11-01

5.  Does initial buccal crest thickness affect final buccal crest thickness after flapless immediate implant placement and provisionalization: A prospective cone beam computed tomogram cohort study.

Authors:  Tristan Ariaan Staas; Edith Groenendijk; Ewald Bronkhorst; Luc Verhamme; Gerry Max Raghoebar; Gerrit Jacobus Meijer
Journal:  Clin Implant Dent Relat Res       Date:  2022-01-03       Impact factor: 4.259

6.  The Root Membrane Technique: Human Histologic Evidence after Five Years of Function.

Authors:  Miltiadis E Mitsias; Konstantinos D Siormpas; Georgios A Kotsakis; Scott D Ganz; Carlo Mangano; Giovanna Iezzi
Journal:  Biomed Res Int       Date:  2017-11-22       Impact factor: 3.411

  6 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.