| Literature DB >> 28610578 |
Freddie Ssengooba1, Justine Namakula2, Vincent Kawooya2, Suzanne Fustukian3.
Abstract
BACKGROUND: In post-conflict settings, many state and non-state actors interact at the sub-national levels in rebuilding health systems by providing funds, delivering vital interventions and building capacity of local governments to shoulder their roles. Aid relationships among actors at sub-national level represent a vital lever for health system development. This study was undertaken to assess the aid-effectiveness in post-conflict districts of northern Uganda.Entities:
Keywords: Aid assessment tool; Aid-effectiveness; Post-conflict; Sub-national level; Uganda
Mesh:
Year: 2017 PMID: 28610578 PMCID: PMC5470258 DOI: 10.1186/s12992-017-0251-7
Source DB: PubMed Journal: Global Health ISSN: 1744-8603 Impact factor: 4.185
Correlations between items in the aid-effectiveness instrument
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | |
|---|---|---|---|---|---|---|---|---|---|
| 1 PRIOR6a | 1 | ||||||||
| 2 MOU6 | 0.59 | 1 | |||||||
| 3 EXPTIM6 | 0.80 | 0.64 | 1 | ||||||
| 4 NEEDS6 | 0.40 | 0.42 | 0.35 | 1 | |||||
| 5 RESLTS6 | 0.52 | 0.47 | 0.51 | 0.60 | 1 | ||||
| 6 ADPROC6 | 0.53 | 0.38 | 0.51 | 0.27 | 0.44 | 1 | |||
| 7 FEEDBK6 | 0.37 | 0.39 | 0.39 | 0.39 | 0.50 | 0.31 | 1 | ||
| 8 COORD6 | 0.32 | 0.22 | 0.24 | 0.30 | 0.31 | 0.25 | 0.37 | 1 | |
| 9 REPRTS6 | 0.41 | 0.36 | 0.37 | 0.41 | 0.45 | 0.39 | 0.45 | 0.27 | 1 |
aSee bracketed variables names in Table 1 - right column
Construct validity for the measurement instrument
| AE Domain and definition | District level concerns | Questions developed to assess the domain at sub-national level |
|---|---|---|
| Ownership/Alignment | Respectful relationship that addressing local needs. | 1. To what extent did resources received from XX address the main priorities of your organization? (PRIOR6) |
| Harmonization | Competition and duplication of activities; limited coverage, by-passing LGs in implementation | 3. To what extent did XX organization use pre-existing admin procedures (e.g. reporting tools, bank accounts etc.) of your organization? (ADPROC6) |
| Managing results | Realistic targets and performance feedback | 5. To what extent was your organization aware about the results expected by XX from your organization? (RESLTS6) |
| Mutual accountability | Changing performance expectations; | 7. To what extent was the resources from XX come within the expected time last year? (EXPTIM6) |
| Overall evaluation | Satisfaction with dyadic aid relationships | 10. Overall, to what extent are you satisfied about your relationship with XX organization? (RELATN6) |
Fig. 1Sampling procedure for the 384 organization ties in the study
Fig. 2Functional categorization of organization ties in the study sample
The item response reliability (N = 379): Cronbach’s Alpha = 0.862
| Mean | S.D. | Cronbach’s Alpha if Item is Deleted | Scale Mean if Item Deleted | |
|---|---|---|---|---|
| PRIOR6a | 2.57 | 1.834 | 0.837 | 19.37 |
| MOU6 | 1.87 | 2.132 | 0.847 | 20.07 |
| EXPTIM6 | 2.41 | 1.916 | 0.839 | 19.53 |
| NEEDS6 | 2.75 | 1.777 | 0.853 | 19.19 |
| RESLTS6 | 3.12 | 1.858 | 0.841 | 18.81 |
| ADPROC6 | 1.65 | 1.819 | 0.853 | 20.29 |
| FEEDBK6 | 2.62 | 1.862 | 0.852 | 19.31 |
| COORD6 | 2.09 | 1.818 | 0.867 | 19.85 |
| REPRTS6 | 2.86 | 1.89 | 0.854 | 19.08 |
aSee bracketed variables names in Table 1 - right column
Fig. 3Mean and confidence interviews for items in the instrument (N = 373)
Models: linear regression: dependent variable: satisfaction with alter
| Models: | Admin Agents | Fund Holders | Health Providers | Support Agents | Overall |
|---|---|---|---|---|---|
| Coefficient | B | B | B | B | B |
| (Constant) | 1.773 | 0.667 | 2.504 | 0.76 | 1.728 |
| Priorities addressed (PRIOR6) | 0.013 | 0.29*** | −0.097 | 0.127 | 0.048 |
| Having MOU (MOU6) | 0.052 | 0.051 | 0.072 | −0.122 | 0.024 |
| Resource Timeliness (EXPTIM6) | 0.05 | −0.055 | 0.019 | 0.219* | 0.009 |
| Negotiate priorities (NEEDS6) | 0.092 | 0.206*** | −0.024 | 0.268** | 0.105*** |
| Expected results (RESULTS6) | 0.24*** | 0.183** | 0.307*** | 0.247* | 0.253*** |
| Different Admin procedures (ADPROC6) | 0.004 | 0.055 | −0.031 | −0.061 | −0.066* |
| Received Feedback (FEEDBK6) | 0.005 | 0.066 | 0.108* | −0.151 | 0.113*** |
| Coordinated support (COORD6) | 0.105** | −0.107* | −0.034 | 0.17* | 0.024 |
| Submits reports (REPRT6) | 0.052 | 0.186*** | 0.063 | 0.103 | 0.088*** |
| R2 | 0.481 | 0.714 | 0.422 | 0.74 | 0.477 |
| N | 114 | 84 | 90 | 52 | 379 |
| Model | .001 | .001 | .001 | .001 | .001 |
* 5-10 percent P value, ** below 0.1 - 5 percent P value, *** below 0.1 percent P value