| Literature DB >> 28400716 |
Michael C Dorneich1, Břetislav Passinger2, Christopher Hamblin2, Claudia Keinrath2, Jiři Vašek2, Stephen D Whitlow3, Martijn Beekhuyzen4.
Abstract
This paper presents an adaptive system intended to address workload imbalances between pilots in future flight decks. Team performance can be maximized when task demands are balanced within crew capabilities and resources. Good communication skills enable teams to adapt to changes in workload, and include the balancing of workload between team members This work addresses human factors priorities in the aviation domain with the goal to develop concepts that balance operator workload, support future operator roles and responsibilities, and support new task requirements, while allowing operators to focus on the most safety critical tasks. A traditional closed-loop adaptive system includes the decision logic to turn automated adaptations on and off. This work takes a novel approach of replacing the decision logic, normally performed by the automation, with human decisions. The Crew Workload Manager (CWLM) was developed to objectively display the workload between pilots and recommend task sharing; it is then the pilots who "close the loop" by deciding how to best mitigate unbalanced workload. The workload was manipulated by the Shared Aviation Task Battery (SAT-B), which was developed to provide opportunities for pilots to mitigate imbalances in workload between crew members. Participants were put in situations of high and low workload (i.e., workload was manipulated as opposed to being measured), the workload was then displayed to pilots, and pilots were allowed to decide how to mitigate the situation. An evaluation was performed that utilized the SAT-B to manipulate workload and create workload imbalances. Overall, the CWLM reduced the time spent in unbalanced workload and improved the crew coordination in task sharing while not negatively impacting concurrent task performance. Balancing workload has the potential to improve crew resource management and task performance over time, and reduce errors and fatigue. Paired with a real-time workload measurement system, the CWLM could help teams manage their own task load distribution.Entities:
Keywords: adaptive human-automation systems; cognitive state assessment; crew resource management; human-computer interaction; neuroergonomics; teamwork
Year: 2017 PMID: 28400716 PMCID: PMC5368254 DOI: 10.3389/fnins.2017.00144
Source DB: PubMed Journal: Front Neurosci ISSN: 1662-453X Impact factor: 4.677
Figure 1Crew Workload Manager main user interface at 30, 60, and 300 s after start.
Figure 2Example alert message associated with the CWLM.
Figure 3The SAT-B is designed for dual operation between two participants.
The task distribution independent variable description.
| Monitoring Lights | Participant | Confederate |
| Tracking | Participant | Confederate |
| Monitoring Dials | Confederate | Participant |
| Resource Management | Confederate | Participant |
| Communications | Confederate (Initially) | Participant (Initially) |
Trial scenario descriptions for Task Distribution A (left) and Task Distribution B (right).
The gray areas mark the data collection periods and are situations where the participant needed to detect and mitigate unbalanced workload. The individual task rate (1–3) of each task is described in the cells.
Conditions for a correct or incorrect sharing request.
| Asking to offload a task | Correct | Incorrect | (data not used) | Incorrect |
| Offering to accept a task | Incorrect | Correct | (data not used) | Incorrect |
| Does not ask or offer | Incorrect | Incorrect | (data not used) | Correct |
Figure 4Means and standard error bars for time spent in unbalanced workload. The star “*” indicates a significant difference between CWLM adaptation levels.
Figure 5Means and standard error bars for correct requests for task sharing. The star “*” indicates a significant difference between CWLM adaptation levels.
Figure 6Means and standard error bars for incorrect requests for task sharing.
Performance metrics for SAT-B tasks.
| Monitoring lights (ML)—Red | Median reaction time | Sec | 1.45 (0.06) | 1.46 (0.07) | 0.57 | No | |
| Monitoring lights (ML)—Green | Median reaction time | Sec | 1.48 (0.05) | 1.49 (0.07) | 0.24 | No | |
| Monitoring lights (ML)—Red | Number of errors (miss, FA) | Number | 3.25 (1.7) | 2.5 (1.4) | 0.39 | No | |
| Monitoring lights (ML)—Green | Number of errors (miss, FA) | Number | 5.08 (4.0) | 6.58 (3.5) | 0.50 | No | |
| Tracking task (T) | RMS of distance deviation from center | Distance | 82.5 (26.7) | 87.7 (31.4) | 0.23 | No | |
| Communication (C) | Median command processing time | Sec | 1.79 (.34) | 1.93 (.52) | 0.20 | No | |
| Communication (C) | Number of errors (miss, incorrect entries) | Number | 1.63 (1.34) | 1.17 (1.13) | 0.22 | No | |
| Monitoring Dials (MD) | Median reaction time | Sec | 11.1 (2.1) | 10.8 (1.1) | 0.81 | No | |
| Monitoring Dials (MD) | Number of errors (miss only)—97% of all errors | Number | 18.6 (4.9) | 18.2 (8.3) | 0.87 | No | |
| Resource Management (RM) | Integral of deviation out of dead band zones | Distance | 280 (325) | 191 (203) | 0.76 | No |