An Estimation of Construction and Demolition Debris in Seoul, Korea: Waste Amount, Type, and Estimating Model.

Seongwon Seo1, Yongwoo Hwang2.   

Abstract

Construction and demolition (C&D) debris is generated at the site of various construction activities. However, the amount of the debris is usually so large that it is necessary to estimate the amount of C&D debris as accurately as possible for effective waste management and control in urban areas. In this paper, an effective estimation method using a statistical model was proposed. The estimation process was composed of five steps: estimation of the life span of buildings; estimation of the floor area of buildings to be constructed and demolished; calculation of individual intensity units of C&D debris; and estimation of the future C&D debris production. This method was also applied in the city of Seoul as an actual case, and the estimated amount of C&D debris in Seoul in 2021 was approximately 24 million tons. Of this total amount, 98% was generated by demolition, and the main components of debris were concrete and brick.

Entities:  

Year:  1999        PMID: 28060625     DOI: 10.1080/10473289.1999.10463863

Source DB:  PubMed          Journal:  J Air Waste Manag Assoc        ISSN: 1096-2247            Impact factor:   2.235


  1 in total

1.  Analysis of Waste Generation Characteristics during New Apartment Construction-Considering the Construction Phase.

Authors:  Young-Chan Kim; Yuan-Long Zhang; Won-Jun Park; Gi-Wook Cha; Jung-Wan Kim; Won-Hwa Hong
Journal:  Int J Environ Res Public Health       Date:  2019-09-19       Impact factor: 3.390

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.