Literature DB >> 27390649

Complexity of line-seru conversion for different scheduling rules and two improved exact algorithms for the multi-objective optimization.

Yang Yu1, Sihan Wang1, Jiafu Tang2, Ikou Kaku3, Wei Sun4.   

Abstract

Productivity can be greatly improved by converting the traditional assembly line to a seru system, especially in the business environment with short product life cycles, uncertain product types and fluctuating production volumes. Line-seru conversion includes two decision processes, i.e., seru formation and seru load. For simplicity, however, previous studies focus on the seru formation with a given scheduling rule in seru load. We select ten scheduling rules usually used in seru load to investigate the influence of different scheduling rules on the performance of line-seru conversion. Moreover, we clarify the complexities of line-seru conversion for ten different scheduling rules from the theoretical perspective. In addition, multi-objective decisions are often used in line-seru conversion. To obtain Pareto-optimal solutions of multi-objective line-seru conversion, we develop two improved exact algorithms based on reducing time complexity and space complexity respectively. Compared with the enumeration based on non-dominated sorting to solve multi-objective problem, the two improved exact algorithms saves computation time greatly. Several numerical simulation experiments are performed to show the performance improvement brought by the two proposed exact algorithms.

Entities:  

Keywords:  Exact algorithm; Manufacturing; Scheduling rule; Space complexity; Time complexity

Year:  2016        PMID: 27390649      PMCID: PMC4916081          DOI: 10.1186/s40064-016-2445-5

Source DB:  PubMed          Journal:  Springerplus        ISSN: 2193-1801


  2 in total

1.  A synergetic combination of small and large neighborhood schemes in developing an effective procedure for solving the job shop scheduling problem.

Authors:  Mehrdad Amirghasemi; Reza Zamani
Journal:  Springerplus       Date:  2014-04-16

2.  Meta-heuristic algorithms for parallel identical machines scheduling problem with weighted late work criterion and common due date.

Authors:  Zhenzhen Xu; Yongxing Zou; Xiangjie Kong
Journal:  Springerplus       Date:  2015-12-18
  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.