Rasoul Yarahmadi1, Parvin Moridi2, YarAllah Roumiani3.
Abstract
BACKGROUND: Research project risks are uncertain contingent events or situations that, if transpire, will have positive or negative effects on objectives of a project. The Management of Health and Safety at Work (MHSW) Regulations 1999 require all employers and the self-employed persons to assess the risks from their work on anyone who may be affected by their activities. Risk assessment is the first step in risk-management procedure, and due to its importance, it has been deemed to be a vital process while having a unique place in the researchbased management systems.Entities:
Keywords: Laboratory site; Risk management; Total risk
Year: 2016 PMID: 27284544 PMCID: PMC4898878
Source DB: PubMed Journal: Med J Islam Repub Iran ISSN: 1016-1430
Comparison of risk levels (before and after effort) with residual and mitigated risk in 9 groups laboratory field
| Laboratory field | Mitigation effort | Risk levels (%) | Initial risk | Residual risk | Mitigated risk % | ||||||
| Negligible | Low | Moderate | Substantial | High | Very High | Unacceptable | |||||
| 1 | Before | 8 | 11 | 17 | 47 | 15 | 0 | 2 | 92 | --- | 69 |
| After | 77 | 15 | 0 | 6 | 0 | 2 | 0 | --- | 23 | ||
| 2 | Before | 0 | 3 | 32 | 58 | 7 | 0 | 0 | 100 | --- | 38 |
| After | 38 | 16 | 32 | 14 | 0 | 0 | 0 | --- | 62 | ||
| 3 | Before | 1 | 5 | 30 | 37 | 26 | 1 | 0 | 99 | --- | 83 |
| After 1 | 84 | 6 | 1 | 9 | 0 | 0 | 0 | --- | 16 | ||
| 4 | Before | 2 | 9 | 8 | 44 | 27 | 8 | 2 | 98 | --- | 57 |
| After | 59 | 33 | 2 | 0 | 6 | 0 | 0 | --- | 41 | ||
| 5 | Before | 2 | 10 | 2 | 42 | 42 | 2 | 0 | 98 | --- | 54 |
| After | 56 | 25 | 12 | 0 | 0 | 7 | 0 | --- | 44 | ||
| 6 | Before | 6 | 12 | 24 | 45 | 10 | 3 | 0 | 94 | --- | 44 |
| After | 50 | 14 | 19 | 17 | 0 | 0 | 0 | --- | 50 | ||
| 7 | Before | 3 | 12 | 16 | 37 | 30 | 2 | 0 | 97 | --- | 75 |
| After | 78 | 14 | 2 | 6 | 0 | 0 | 0 | --- | 22 | ||
| 8 | Before | 1 | 10 | 12 | 39 | 30 | 5 | 0 | 99 | --- | 86 |
| After | 87 | 7 | 2 | 3 | 1 | 0 | 0 | --- | 13 | ||
| 9 | Before | 2 | 10 | 9 | 33 | 36 | 8 | 2 | 98 | --- | 81 |
| After | 83 | 10 | 2 | 4 | 1 | 0 | 0 | --- | 17 | ||
Comparison of statistical parameters (mean, SD, t test) in 9 groups laboratory fields (as total risk estimation) before and after mitigation efforts with occupational health, safety and environmental approach
| Laboratory field | Total Risk Estimation | |||
| Occupational safety and health aspects | Environment aspects | |||
| Before mitigation effort | After mitigation effort | Before mitigation effort | After mitigation effort | |
| 1 | 6.85 | 2.00 | 22.08 | 4.80 |
| 2 | 8.55 | 1.80 | 15.80 | 4.80 |
| 3 | 10.06 | 1.00 | 13.44 | 5.10 |
| 4 | 12.89 | 0.90 | 20.90 | 6.30 |
| 5 | 14.80 | 0.80 | 14.48 | 6.10 |
| 6 | 15.55 | 2.00 | 14.7 | 5.10 |
| 7 | 16.38 | 4.70 | 13.44 | 5.10 |
| 8 | 19.82 | 0.70 | 17.76 | 4.60 |
| 9 | 21.11 | 0.90 | 18 | 5.92 |
| Mean | 14 | 1.64 | 16.73 | 5.31 |
| SD | 4.8 | 1.26 | 3.1 | 0.62 |
| Paired –t test | p<0.0001 | p<0.0001 | ||
Weight distribution of control priorities, independent engineering and management measures at laboratory sites, by focusing on health-safety and the environment
| Laboratory field | Priority of act | |||||
| Occupational safety and health | Environment | |||||
| Risk priority numerals | Administrative methods numbers |
Engineering | Risk priority numerals |
Administrative methods |
Engineering methods | |
| 1 | 85 | 19 | 66 | 5 | 1 | 4 |
| 2 | 101 | 26 | 75 | 5 | 1 | 4 |
| 3 | 41 | 11 | 30 | 5 | 2 | 3 |
| 4 | 66 | 16 | 50 | 11 | 4 | 7 |
| 5 | 130 | 50 | 80 | 27 | 0 | 27 |
| 6 | 47 | 22 | 25 | 6 | 2 | 4 |
| 7 | 40 | 10 | 30 | 5 | 4 | 1 |
| 8 | 97 | 40 | 57 | 13 | 1 | 12 |
| 9 | 92 | 32 | 60 | 9 | 1 | 8 |
| sum | 699 | 226 | 473 | 86 | 16 | 70 |
| Ratio (%) | 100 | 32.3 | 67.7 | 100 | 18.6 | 81.4 |
Fig. 1
Fig. 2
Fig. 3