| Literature DB >> 27031989 |
Muhammad Ahsan Qureshi1, Rafidah Md Noor1, Azra Shamim2, Shahaboddin Shamshirband1, Kim-Kwang Raymond Choo3.
Abstract
Radio propagation models (RPMs) are generally employed in Vehicular Ad Hoc Networks (VANETs) to predict path loss in multiple operating environments (e.g. modern road infrastructure such as flyovers, underpasses and road tunnels). For example, different RPMs have been developed to predict propagation behaviour in road tunnels. However, most existing RPMs for road tunnels are computationally complex and are based on field measurements in frequency band not suitable for VANET deployment. Furthermore, in tunnel applications, consequences of moving radio obstacles, such as large buses and delivery trucks, are generally not considered in existing RPMs. This paper proposes a computationally inexpensive RPM with minimal set of parameters to predict path loss in an acceptable range for road tunnels. The proposed RPM utilizes geometric properties of the tunnel, such as height and width along with the distance between sender and receiver, to predict the path loss. The proposed RPM also considers the additional attenuation caused by the moving radio obstacles in road tunnels, while requiring a negligible overhead in terms of computational complexity. To demonstrate the utility of our proposed RPM, we conduct a comparative summary and evaluate its performance. Specifically, an extensive data gathering campaign is carried out in order to evaluate the proposed RPM. The field measurements use the 5 GHz frequency band, which is suitable for vehicular communication. The results demonstrate that a close match exists between the predicted values and measured values of path loss. In particular, an average accuracy of 94% is found with R2 = 0.86.Entities:
Mesh:
Year: 2016 PMID: 27031989 PMCID: PMC4816450 DOI: 10.1371/journal.pone.0152727
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Measurement Setups.
| Scenario | Tx Speed | Tr Speed | Updation | Orientation |
|---|---|---|---|---|
| Stationary | Stationary | 50 meters | Tr going away from Tx | |
| Stationary | 40 km/hr | 1 meter | Tr going away from Tx | |
| Stationary | 70 km/hr | 1 meter | Tr going away from Tx | |
| Stationary | 54 km/hr | 15 meters | Tr going away from Tx | |
| Stationary | 72 km/hr | 20 meters | Tr going away from Tx | |
| 30 km/hr | 60 km/hr | 10 meters | Tr approaching Tx and then going away |
Fig 1RSS in SC
Fig 2RSS in SC and SC
Fig 3RSS in SC
Fig 4RSS in SC
Fig 5RSS in SC
Fig 6Fresnel’s Ellipsoid.
Fig 7Path Loss (Measured vs Predicted).
Fig 8Comparison of Predicted Path Loss.
Fig 9Comparison of PDR in Road Tunnel.