Qi Li1, Yanan Zhang2, Guiping Hu3.
Abstract
This paper evaluates the economic feasibility of an integrated production pathway combining fast pyrolysis and bio-oil gasification. The conversion process is simulated with Aspen Plus® for a 2000 metric ton per day facility. Techno-economic analysis of this integrated pathway has been conducted. A total capital investment of $510 million has been estimated and the minimum fuel selling price (MSP) is $5.59 per gallon of gasoline equivalent. The sensitivity analysis shows that the MSP is most sensitive to internal rate of return, fuel yield, biomass feedstock cost, and fixed capital investment. Monte-Carlo simulation shows that MSP for bio-oil gasification would be more than $6/gal with a probability of 0.24, which indicates this pathway is still at high risk with current economic and technical situation.Entities:
Keywords: Bio-oil gasification; Fast pyrolysis; Techno-economic analysis
Mesh:
Substances:
Year: 2015 PMID: 25983227 DOI: 10.1016/j.biortech.2015.05.002
Source DB: PubMed Journal: Bioresour Technol ISSN: 0960-8524 Impact factor: 9.642