| Literature DB >> 25955389 |
Rohina Joshi1, Deversetty Praveen2, Stephen Jan1, Krishnam Raju3, Pallab Maulik4, Vivekanand Jha4, Alan D Lopez5.
Abstract
OBJECTIVE: This paper aims to determine the cost of establishing and sustaining a verbal-autopsy based mortality surveillance system in rural India.Entities:
Mesh:
Year: 2015 PMID: 25955389 PMCID: PMC4425407 DOI: 10.1371/journal.pone.0126410
Source DB: PubMed Journal: PLoS One ISSN: 1932-6203 Impact factor: 3.240
Fig 1Overall design of the verbal autopsy based mortality surveillance system.
Start-up cost of the VA based mortality surveillance (2003–2004).
| Process | Cost per death | Cost per capita | Total Costa | |||
|---|---|---|---|---|---|---|
| Indian Rupees | US dollar | Indian Rupees | US dollar | Indian Rupees | US dollar | |
|
| 45.00 | 0.99 | 0.36 | 0.01 | 67025.00 | 1475.00 |
| a) Material cost (protocol, manuals, questionnaires) | ||||||
| b) Cost for running a workshop (stationary, transportation, lunch/tea) | ||||||
| c) Trainer fee | ||||||
|
| 166.00 | 3.65 | 1.34 | 0.03 | 248400.00 | 5466.40 |
| a) Salaries of NPHWs 1day/week (45 NPHWs) | ||||||
|
| 250.00 | 5.52 | 2.02 | 0.04 | 375000.00 | 8252.40 |
| a) Physician fee for coding VAs (4 physicians) | ||||||
|
| 228.00 | 5.02 | 1.84 | 0.04 | 341742.00 | 7520.00 |
| a) Salary of project coordinator 0.5FTE | ||||||
| b) Salary of field coordinator 0.5 FTE | ||||||
| c) Photocopying of VAs | ||||||
| d) Courier costs | ||||||
|
| 68.00 | 1.49 | 0.62 | 0.00 | 101342.60 | 2230.20 |
| a) Computers, printers, phones | ||||||
| b) Office furniture | ||||||
| c) Local travel | ||||||
|
|
|
|
|
|
|
|
* Conversion rate 1USD = 44.9 Indian Rupees (at 2003 exchange rate)
Note: The lifespan of the computers, printers and phones was assumed to be 4 years; hence the entire cost of the item was included in the start-up cost. The annualized cost of office furniture was estimated after adjustment for the useful life of the equipment at a discount rate of 5%.
Cost for running the surveillance for subsequent years (2004–2007).
| Process | Cost per death | Cost per capita | Total Costa | |||
|---|---|---|---|---|---|---|
| Indian Rupees | US dollar | Indian Rupees | US dollar | Indian Rupees | US dollar | |
|
| 21.00 | 0.46 | 0.17 | 0.00 | 31012.50 | 682.50 |
| a) Material cost (protocol, manuals, questionnaires) | ||||||
| b) Cost for running a workshop (stationary, transportation, lunch/tea) | ||||||
| c) Trainer fee | ||||||
|
| 166.00 | 3.65 | 1.34 | 0.03 | 248400.00 | 5466.40 |
|
| ||||||
|
| 125.00 | 2.75 | 1.01 | 0.02 | 187500.00 | 4126.20 |
| a) Physician fee for coding VAs | ||||||
|
| 226.71 | 4.99 | 1.83 | 0.04 | 338862.00 | 7457.10 |
| a) Salary of project coordinator 0.5FTE | ||||||
| b) Salary of field coordinator 0.5 FTE | ||||||
| c) Photocopying of VAs | ||||||
| d) Courier costs | ||||||
|
| 11.00 | 0.25 | 0.09 | 0.00 | 16942.60 | 372.90 |
| a) Internet & phone connectivity | ||||||
| b) Office furniture | ||||||
| c) Local travel | ||||||
|
| 549.71 | 12.11 | 4.43 | 0.10 | 82271810. | 18105.10 |
* Conversion rate 1USD = 44.9 Indian Rupees (at 2003 exchange rate)
Total cost for running the surveillance system over four years.
| Process | Cost per death/year | Cost per capita/year | Total Costa | |||
|---|---|---|---|---|---|---|
| Indian Rupees | US dollar | Indian Rupees | US dollar | Indian Rupees | US dollar | |
|
| 27.00 | 0.59 | 0.86 | 0.02 | 160062.50 | 3522.40 |
| a) Material cost (protocol, manuals, questionnaires) | ||||||
| b) Cost for running a workshop (stationary, transportation, lunch/tea) | ||||||
| c) Trainer fee | ||||||
|
| 166.00 | 3.65 | 5.35 | 0.12 | 993600.00 | 21865.50 |
| a) Salaries of NPHWs 1day/week | ||||||
|
| 156.25 | 3.44 | 5.05 | 0.11 | 937500.00 | 20630.90 |
| a) Physician fee for coding VAs | ||||||
|
| 227.03 | 5.00 | 7.32 | 0.16 | 1358310.00 | 29891.40 |
| a) Salary of project coordinator | ||||||
| b) Salary of field coordinator | ||||||
| c) Photocopying of VAs | ||||||
| d) Courier costs | ||||||
|
| 25.25 | 0.56 | 0.89 | 0.00 | 165227.20 | 3636.00 |
| a) Internet & phone connectivity | ||||||
| b) Equipment | ||||||
| c) Local travel | ||||||
|
| 601.53 | 13.24 | 19.47 | 0.41 | 3614700.20 | 79546.20 |
* Conversion rate 1USD = 44.9 Indian Rupees (at 2003 exchange rate)