| Literature DB >> 25511210 |
S Talati1, A K Gupta, A Kumar, S K Malhotra, A Jain.
Abstract
CONTEXT: Operation theater (OT) utilization. AIMS: To analyze the time utilization and to assess the stated causes of cancellations of scheduled cases in the OT complex of a tertiary care teaching institute. SETTINGS ANDEntities:
Mesh:
Year: 2015 PMID: 25511210 PMCID: PMC4944363 DOI: 10.4103/0022-3859.147009
Source DB: PubMed Journal: J Postgrad Med ISSN: 0022-3859 Impact factor: 1.476
Specialty-wise distribution of OT tables on the fourth and fifth floors of the hospital
| Name of specialty | Total number of OT tables |
|---|---|
| General Surgery | 3 |
| Urology | 2 |
| Orthopedics | 2 |
| Plastic Surgery | 2 |
| E.N.T. | 2 |
| Neurosurgery | 3 |
| Gynecology | 2 |
OT – Operation theater
Figure 1Flow chart depicting the operative process
OT table wise percentage mean time per day spent on different parameters
| OT Table No. | Number of Days (n) | Raw utilization in minutes (mean/day ± SD) | Time spent on supportive services in minutes (mean/day ± SD) | Time spent on actual surgery in minutes (mean/day ± SD) | Total time for the procedure in minutes (mean/day ± SD) |
|---|---|---|---|---|---|
| 1 | 6 | 373.67 (77.84±11.53) | 52.33 (10.90±3.53) | 249.33 (51.94±21.95) | 398.33 (82.99±11.31) |
| 2 | 6 | 347.67 (72.43±20.32) | 49.83 (10.38±3.60) | 269 (56.04±18.19) | 364.83 (76.01±19.43) |
| 3 | 6 | 388 (80.83±10.23) | 57.83 (12.05±2.89) | 283.17 (58.99±11.37) | 403.33 (84.03±10.90) |
| 4 | 6 | 394.5 (82.19±5.17) | 67 (13.96±2.87) | 287.17 (59.83±5.77) | 420.33 (87.57±5.01) |
| 5 | 6 | 400.67 (83.47±7.73) | 74.33 (15.49±7.32) | 290 (60.42±15.25) | 432.17 (90.04±5.71) |
| 6 | 6 | 379.5 (79.06±24.59) | 54.83 (11.42±7.29) | 286.83 (59.76±23.61) | 391.67 (81.60±23.76) |
| 7 | 6 | 407.5 (84.90±7.36) | 60 (12.5±6.00) | 317.5 (66.15±10.37) | 428.33 (89.24±7.30) |
| 8 | 6 | 411.67 (85.76±14.29) | 46.17 (9.62±3.82) | 332.17 (69.20±15.34) | 428.33 (89.24±11.54) |
| 9 | 6 | 424.5 (88.44±8.34) | 43.67 (9.1±2.71) | 353.33 (73.61±8.20) | 450 (93.75±5.71) |
| 10 | 6 | 412.83 (86.01±5.75) | 56.33 (11.74±4.15) | 297.33 (61.94±5.14) | 439.17(91.49±6.89) |
| 11 | 6 | 355.5 (74.06±9.32) | 51.33 (10.69±2.64) | 263.33 (54.86±8.39) | 390.83 (81.42±9.37) |
| 12 | 6 | 448.67 (93.47±8.14) | 77.83 (16.22±4.10) | 338.83 (69.55±7.82) | 464.5 (96.77±7.28) |
| 13 | 6 | 414.33 (86.32±10.85) | 67.67 (14.1±5.98) | 318 (66.25±15.69) | 432.83 (90.17±9.00) |
| 14 | 6 | 412.5 (85.94±10.20) | 61.67 (12.85±6.99) | 316.67 (65.97±16.27) | 423.33(88.20±10.47) |
| 15 | 6 | 3.5.33 (63.61±20.95) | 53.33 (11.11±3.07) | 215 (44.79±20.62) | 330 (68.75±18.80) |
| 16 | 6 | 385.33 (80.28±16.93) | 49 (10.21±2.99) | 300.17 (62.53±16.82) | 413.33 (86.11±18.50) |
| Over all | 96 | 391.39 (81.54±14.00) | 57.70 (12.02±4.74) | 294.55 (61.37±15.40) | 413.21 (86.09±13.38) |
OT – Operation theater
OT table-wise percentage mean room turnover time per day
| OT table no. | Number of days (n) | Room turnover time in minutes (mean/day ± SD) |
|---|---|---|
| 1 | 6 | 24.67 (5.14±4.28) |
| 2 | 4 | 25.75 (5.36±3.30) |
| 3 | 6 | 15.33 (3.20±1.04) |
| 4 | 6 | 25.83 (5.37±2.95) |
| 5 | 6 | 31.5 (6.5± 3.71) |
| 6 | 3 | 24.33 (5.5±1.95) |
| 7 | 5 | 25 (5.21±3.53) |
| 8 | 4 | 25 (5.21±3.40) |
| 9 | 6 | 25.5 (5.31±3.77) |
| 10 | 6 | 26.33 (5.49±1.60) |
| 11 | 6 | 35.33 (7.36±2.10) |
| 12 | 5 | 19 (3.96±0.79) |
| 13 | 4 | 27.75 (5.78±4.80) |
| 14 | 3 | 21.67 (4.51±3.18) |
| 15 | 5 | 29.6 (6.17±4.28) |
| 16 | 6 | 28 (5.83±1.86) |
| Overall | 81 | 25.86 (5.39±2.96) |
OT – Operation theater
Delays in starting of OT on time in the morning
| OT table no. | Number of delays |
|---|---|
| 1 | 1 |
| 2 | 1 |
| 3 | 0 |
| 4 | 0 |
| 5 | 0 |
| 6 | 0 |
| 7 | 0 |
| 8 | 2 |
| 9 | 2 |
| 10 | 0 |
| 11 | 3 |
| 12 | 0 |
| 13 | 2 |
| 14 | 1 |
| 15 | 2 |
| 16 | 1 |
| Total | 15 |
OT – Operation theater
Reasons and the number of delays in starting the operation table in the morning
| Reason for delay | Number of delays | % |
|---|---|---|
| Patient shifted late from the ward | 7 | 46.66 |
| Patient reported late | 4 | 26.67 |
| Administrative cause-instruments not ready; OT light not functioning properly etc. | 2 | 13.33 |
| Emergency case was operated in the night so OT started late in the morning | 1 | 6.67 |
| Critical condition of the patient | 1 | 6.67 |
| Total | 15 | 100 |
Cancellations on various OT tables
| OT table no. | Surgeries done | Cancelled surgeries | Total scheduled cases | Cancellation (%) |
|---|---|---|---|---|
| 1 | 20 | 6 | 26 | 23 |
| 2 | 13 | 9 | 22 | 40.09 |
| 3 | 13 | 3 | 16 | 18.75 |
| 4 | 19 | 3 | 22 | 13.63 |
| 5 | 19 | 5 | 24 | 20.83 |
| 6 | 13 | 7 | 20 | 35 |
| 7 | 12 | 5 | 17 | 29.41 |
| 8 | 16 | 2 | 18 | 11.11 |
| 9 | 14 | 3 | 17 | 17.65 |
| 10 | 24 | 8 | 32 | 25 |
| 11 | 23 | 7 | 30 | 23.33 |
| 12 | 13 | 8 | 21 | 38.10 |
| 13 | 11 | 3 | 14 | 21.43 |
| 14 | 10 | 3 | 13 | 23.08 |
| 15 | 14 | 1 | 15 | 6.67 |
| 16 | 18 | 0 | 18 | 0 |
| Total | 252 | 73 | 325 | 22.5 |
OT – Operation theater
Stated reasons for cancellations
| Reason for cancellation | Number | Percent (%) |
|---|---|---|
| Lack of operating time | 57 | 78.1 |
| Patient unfit | 6 | 8.2 |
| Patient absent | 3 | 4.1 |
| Work-up pending | 3 | 4.1 |
| Patient non-fasting | 3 | 4.1 |
| Scheduling error | 1 | 1.4 |
| Total | 73 | 100 |