| Literature DB >> 25379331 |
Aikaterini D Baka1, Nikolaos K Uzunoglu2.
Abstract
Investigation and analysis of accidents are critical elements of safety management. The over-riding purpose of an organization in carrying out an accident investigation is to prevent similar accidents, as well as seek a general improvement in the management of health and safety. Hundreds of workers have suffered injuries while installing, maintaining, or servicing machinery and equipment due to sudden re-energization of power lines. This study presents and analyzes two electrical accidents (1 fatal injury and 1 serious injury) that occurred because the power supply was reconnected inadvertently or by mistake.Entities:
Keywords: accidents; case reports; fault tree analysis; human error
Year: 2014 PMID: 25379331 PMCID: PMC4213920 DOI: 10.1016/j.shaw.2014.06.006
Source DB: PubMed Journal: Saf Health Work ISSN: 2093-7911
Lethal injuries in Greece from 2007 to 2012 [2–4]
| Lethal injuries | ||||||
|---|---|---|---|---|---|---|
| Category | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 |
| Fall | 38 | 39 | 20 | 20 | 7 | 9 |
| Electric shock, fire, explosion | 14 | 15 | 14 | 4 | 10 | 5 |
| Construction machines, various tools | 7 | 4 | 6 | 9 | 9 | 10 |
| Other | 35 | 46 | 44 | 30 | 13 | 21 |
| Total | 94 | 104 | 84 | 63 | 39 | 45 |
Fig. 1Flow diagram for accidents [5]. PPE, personal protective equipment. Note. From “Flow diagram analysis of electrical fatalities in the construction industry,” by C.-F. Chi, Y.Y. Lin, and M. Ikhwan, 2012, Saf Sci, 50, p. 1205–14. Copyright 20XX, Name of Copyright Holder. Reprinted with permission.