| Literature DB >> 25254225 |
Huirong Feng1, C W Lim2, Liqun Chen3, Xinnian Zhou4, Chengjun Zhou4, Yi Lin4.
Abstract
The current study used the improved fuzzy analytic hierarchy process to construct a sustainable deforestation development evaluation system and evaluation model, which has refined a diversified system to evaluate the theory of sustainable deforestation development. Leveraging the visual image of the system dynamics causal and power flow diagram, we illustrated here that sustainable forestry development is a complex system that encompasses the interaction and dynamic development of ecology, economy, and society and has reflected the time dynamic effect of sustainable forestry development from the three combined effects. We compared experimental programs to prove the direct and indirect impacts of the ecological, economic, and social effects of the corresponding deforest techniques and fully reflected the importance of developing scientific and rational ecological harvesting and transportation technologies. Experimental and theoretical results illustrated that light cableway skidding is an ecoskidding method that is beneficial for the sustainable development of resources, the environment, the economy, and society and forecasted the broad potential applications of light cableway skidding in timber production technology. Furthermore, we discussed the sustainable development countermeasures of forest ecosystems from the aspects of causality, interaction, and harmony.Entities:
Mesh:
Year: 2014 PMID: 25254225 PMCID: PMC4164847 DOI: 10.1155/2014/106209
Source DB: PubMed Journal: ScientificWorldJournal ISSN: 1537-744X
Figure 1A causal power flow diagram showing the parameters and dynamics of sustainable deforestation development.
Index weight distribution and results evaluation.
| Two-level index | Second weight |
Three-level |
Three- | Four-level index |
Four- | Road-cutting skidding | Cableway skidding | ||
|---|---|---|---|---|---|---|---|---|---|
| Standard | Integrated assessment value | Standard | Integrated assessment value | ||||||
|
| 0.5954 |
| 0.2763 | Integrity of forestry landscape ( | 0.0647 | 0.6600 | 0.0070 | 0.7800 | 0.0083 |
|
| 0.5954 | Water source conservation ( | 0.2046 | 0.4700 | 0.0341 | 0.5800 | 0.0421 | ||
|
| 0.1283 | Biomass of forest ( | 0.3309 | 0.5200 | 0.0131 | 0.5700 | 0.0144 | ||
|
| |||||||||
|
| 0.2763 |
| 0.3011 | Unit cost for ready (100 million yuan, reverse index) ( | 0.3106 | 0 | 0 | 1 | 0.0258 |
|
| 0.4536 | Utilization rate of forest resources ( | 0.4361 | 0.5600 | 0.0306 | 0.7800 | 0.0426 | ||
|
| 0.2453 | Increment of value of annual forest production (10,000 yuan) ( | 0.2224 | 0.3000 | 0.0045 | 0.3500 | 0.0052 | ||
|
| |||||||||
|
| 0.1283 |
| 0.2392 | Forestry area (10,000 hm2) ( | 0.1793 | 0.6300 | 0.0035 | 0.6900 | 0.0038 |
|
| 0.4422 | Improvement of scientific level ( | 0.1376 | 0.1600 | 0.0012 | 0.8600 | 0.0067 | ||
|
| 0.3186 | Reducing labor intensity ( | 0.1931 | 0.3500 | 0.0028 | 0.8900 | 0.0070 | ||
Overview of the three-scale division.
| Division | Definition | Illustration |
|---|---|---|
| 0 |
|
|
| 0.5 | Equal importance |
|
| 1 |
|
|
The evaluation table between B .
| Goal ( | Ecological benefits ( | Economic benefits ( | Social benefits ( |
|---|---|---|---|
| Ecological benefits ( | 0.5 | 1 | 1 |
| Economic benefits ( | 0 | 0.5 | 1 |
| Social benefits ( | 0 | 0 | 0.5 |
Evaluation of C .
| Goal ( |
|
|
|
|
|
|---|---|---|---|---|---|
|
| 0.5 | 0 | 0 | 0 | 0 |
|
| 1 | 0.5 | 0 | 0 | 1 |
|
| 1 | 1 | 0.5 | 0.5 | 1 |
|
| 1 | 1 | 0.5 | 0.5 | 1 |
|
| 1 | 0 | 0 | 0 | 0.5 |
Costs and various labor comparisons of light-duty cableway and road-skidding methods/(yuan).
| Skidding methods | Cutting area code | Working quantity | Ready cost | Skidding quantity | Skidding cost | Total working quantity | Fuel cost | Equipment | Day efficiency | Year efficiency | Unit cost | Cableway skidding savings rate |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Road-skidding | 122-1-3 | 158.00 | 16.26 | 1161.20 | 119.47 | 1319.2 | 7.71 | 5.00 | 0.74 | 185.74 | 148.44 | 29.50% |
| Cableway-skidding | 122-1-3 | 120.00 | 12.35 | 747.10 | 76.86 | 867.1 | 9.96 | 5.48 | 1.12 | 281.12 | 104.65 |
In addition to the total working quantity, the data are calculated by per m3 volume. “Working quantity ready” includes skidding road and setting up camps and cableways stages.