Settling basin design in a constructed wetland using TSS removal efficiency and hydraulic retention time.

Soyoung Lee1, Marla C Maniquiz-Redillas2, Lee-Hyung Kim3.   

Abstract

Using total suspended solid (TSS) removal efficiency and hydraulic retention time (HRT) as design parameters a design guideline of a settling basin in a constructed wetland (CW) was suggested; as well as management of sediment and particle in the settling basin. The CW was designed to treat the piggery wastewater effluent from a wastewater treatment plant during dry days and stormwater runoff from the surrounding paved area during wet days. The first settling basin (FSB) in the CW was theoretically designed with a total storage volume (TSV) of 453m(3) and HRT of 5.5hr. The amount of sediment and particles settled at the FSB was high due to the sedimentation and interception of plants in the CW. Dredging of sediments was performed when the retention rate at the FSB decreased to approximately 80%. Findings showed that the mean flow rate was 21.8m(3)/hr less than the designed flow rate of 82.8m(3)/hr indicating that the FSB was oversize and operated with longer HRT (20.7hr) compared to the design HRT. An empirical model to estimate the length of the settling basin in the CW was developed as a function of HRT and desired TSS removal efficiency. Using the minimum tolerable TSS removal efficiency of 30%, the length of the FSB was estimated to be 31.2m with 11.8hr HRT.
Copyright © 2014. Published by Elsevier B.V.

Entities:  

Keywords:  Constructed wetland; Hydraulic retention time; Particle size distribution; Settling basin design; TSS removal efficiency

Mesh:

Year:  2014        PMID: 25193826     DOI: 10.1016/j.jes.2014.07.002

Source DB:  PubMed          Journal:  J Environ Sci (China)        ISSN: 1001-0742            Impact factor:   5.565


  1 in total

1.  Performance of a constructed wetland as an upstream intervention for stormwater runoff quality management.

Authors:  Isa Kabenge; Godfrey Ouma; Dominic Aboagye; Noble Banadda
Journal:  Environ Sci Pollut Res Int       Date:  2018-11-09       Impact factor: 4.223

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.