Literature DB >> 24718330

Performance of a pilot-scale constructed wetland for stormwater runoff and domestic sewage treatment on the banks of a polluted urban river.

Weijie Guo1, Zhu Li1, Shuiping Cheng2, Wei Liang3, Feng He3, Zhenbin Wu3.   

Abstract

To examine the performance of a constructed wetland system on stormwater runoff and domestic sewage (SRS) treatment in central east China, two parallel pilot-scale integrated constructed wetland (ICW) systems were operated for one year. Each ICW consisted of a down-flow bed, an up-flow bed and a horizontal subsurface flow bed. The average removal rates of chemical oxygen demand (CODCr), total suspended solids (TSS), ammonia (NH4(+)-N), total nitrogen (TN) and total phosphorus (TP) were 63.6, 91.9, 38.7, 43.0 and 70.0%, respectively, and the corresponding amounts of pollutant retention were approximately 368.3, 284.9, 23.2, 44.6 and 5.9 g m(-2) yr(-1), respectively. High hydraulic loading rate (HLR) of 200 mm/d and low water temperatures (<15 °C) resulted in significant decrease in removals for TP and NH4(+)-N, but had no significant effects on removals of COD and TSS. These results indicated that the operation of this ICW at higher HLR (200 mm/d) might be effective and feasible for TSS and COD removal, but for acceptable removal efficiencies of nitrogen and phosphorus it should be operated at lower HLR (100 mm/d). This kind of ICW could be employed as an effective technique for SRS treatment.

Entities:  

Mesh:

Substances:

Year:  2014        PMID: 24718330     DOI: 10.2166/wst.2014.027

Source DB:  PubMed          Journal:  Water Sci Technol        ISSN: 0273-1223            Impact factor:   1.915


  1 in total

1.  Performance of a constructed wetland as an upstream intervention for stormwater runoff quality management.

Authors:  Isa Kabenge; Godfrey Ouma; Dominic Aboagye; Noble Banadda
Journal:  Environ Sci Pollut Res Int       Date:  2018-11-09       Impact factor: 4.223

  1 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.