Seok J Yoon1, Hsing K Lin2, Gang Chen1, Shinjea Yi3, Jeawook Choi4, Zhenhua Rui5.
Abstract
BACKGROUND: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys.Entities:
Keywords: accident rate; benefit of occupational health and safety management system; construction health and safety; occupational health and safety management system; work-related victims
Year: 2013 PMID: 24422176 PMCID: PMC3889079 DOI: 10.1016/j.shaw.2013.10.002
Source DB: PubMed Journal: Saf Health Work ISSN: 2093-7911
Fig. 1Accident rate (work-related victims/100 workers).
Fig. 2Accident rate (work-related victims/100 workers).
Fig. 3Fatal accident/10,000 workers.
General characteristics of the respondents (n = 72)
| Characteristics | Job position | |||||
|---|---|---|---|---|---|---|
| Site general manager | OHS manager | |||||
| % | % | |||||
| Construction types | Housing and office | 24 | 66.7 | 24 | 66.7 | — |
| Transportation | 10 | 27.8 | 10 | 27.8 | ||
| Plant | 2 | 5.6 | 2 | 5.6 | ||
| Gender | M | 36 | 100.0 | 35 | 97.2 | >0.9999* |
| F | 0 | 0.0 | 1 | 2.8 | ||
| Age group (y) | <30 | 0 | 0.0 | 6 | 16.7 | <0.0001* |
| 30–39 | 0 | 0.0 | 24 | 66.7 | ||
| 40–49 | 29 | 80.6 | 6 | 16.7 | ||
| 50–59 | 7 | 19.4 | 0 | 0.0 | ||
| No. of workers | <100 | 6 | 16.7 | 6 | 16.7 | — |
| 100–199 | 5 | 13.9 | 5 | 13.9 | ||
| 200–399 | 14 | 38.9 | 14 | 38.9 | ||
| 400–599 | 8 | 22.2 | 8 | 22.2 | ||
| >600 | 3 | 8.3 | 3 | 8.3 | ||
| Major | Environment | 0 | 0.0 | 2 | 5.6 | <0.0001* |
| Safety | 0 | 0.0 | 24 | 66.7 | ||
| Health or hygiene | 0 | 0.0 | 0 | 0.0 | ||
| Engineering | 35 | 97.2 | 9 | 25.0 | ||
| Management | 0 | 0.0 | 0 | 0.0 | ||
| Other | 1 | 2.8 | 1 | 2.8 | ||
| OHSMS training | Yes | 35 | (97.2) | 35 | (97.2) | >0.9999* |
| No | 1 | (2.8) | 0 | (0.0) | ||
| Unknown | 0 | (0.0) | 1 | (2.8) | ||
| Necessity of OHSMS. | Yes | 36 | 100.0 | 35 | 97.2 | >0.9999* |
| No | 0 | 0.0 | 1 | 2.8 | ||
Fisher exact test and Pearson Chi-square test were performed to examine the statistical difference for the participant's demographic factors and awareness between site general managers and OHS managers. For reference, the Pearson Chi-square test is generally conducted for the comparison between the groups of categorical variables, but when the sample number is small (i.e., when the frequency in the cell is small), the Pearson Chi-square test could lead to incorrect result. In that case, the Fisher exact test was carried out.
OHS, occupational health and safety; OHSMS, occupational health and safety management system.
* p value by Fisher exact test.
Motivation for developing company's own OHSMS (n = 72)
| Factors | Job position | ||||
|---|---|---|---|---|---|
| Site general manager | OHS manager | ||||
| % | % | ||||
| Motivation for developing OHSMS | 0.0002* | ||||
| Lack of health and safety management system | 15 | 41.7 | 24 | 66.7 | |
| Social responsibility and legal issues | 7 | 19.4 | 5 | 13.9 | |
| Elimination and management of health and safety risks | 12 | 33.3 | 4 | 11.1 | |
| Reduce the cost of health and safety management | 1 | 2.8 | 2 | 5.6 | |
| Responding and complying with interested party | 1 | 2.8 | 1 | 2.8 | |
OHS, occupational health and safety; OHSMS, occupational health and safety management system.
* p value by Fisher exact test.
Implementation of OHSMS (n = 72)
| Parameters | Job position | ||||
|---|---|---|---|---|---|
| Site general manager | OHS manager | ||||
| % | % | ||||
| Implementation methods | |||||
| Itself | 18 | 50.0 | 18 | 50.0 | |
| Part of support from consulting firm | 12 | 33.3 | 12 | 33.3 | |
| Support from consulting firm | 6 | 16.7 | 6 | 16.7 | |
| Cost of OHSMS implementation and certification | 0.2214 | ||||
| Inexpensive | 10 | 27.8 | 8 | 22.2 | |
| Reasonable cost | 24 | 66.7 | 20 | 55.6 | |
| Expensive | 1 | 2.8 | 6 | 16.7 | |
| Other | 1 | 2.8 | 2 | 5.6 | |
| External support needed for implementing OHSMS | 0.0007 | ||||
| Policy | 1 | 2.8 | 2 | 5.6 | |
| Risk assessment | 33 | 91.7 | 20 | 55.6 | |
| Legal compliance | 1 | 2.8 | 2 | 5.6 | |
| Goals and plans | 0 | 0.0 | 7 | 19.4 | |
| Organization and responsibility | 0 | 0.0 | 0 | 0.0 | |
| Training and communication | 0 | 0.0 | 1 | 2.8 | |
| Documentation | 0 | 0.0 | 1 | 2.8 | |
| Implementation management | 1 | 2.8 | 0 | 0.0 | |
| Inspection and correction | 0 | 0.0 | 0 | 0.0 | |
| Audit | 0 | 0.0 | 0 | 0.0 | |
| Management review | 0 | 0.0 | 3 | 8.3 | |
| Any problem with the implementation of OHSMS | 0.0022 | ||||
| Yes | 12 | 33.3 | 25 | 69.4 | |
| No | 24 | 66.7 | 11 | 30.6 | |
| If you have problems, what kind of problem | 0.0029 | ||||
| Complicated documentation management | 0 | 0.0 | 10 | 40.0 | |
| Noncompliance with existing OHSMS | 4 | 33.3 | 6 | 24.0 | |
| More complicated (organization, operation, etc.) | 7 | 58.3 | 3 | 12.0 | |
| No measurement of visible achievements | 0 | 0.0 | 3 | 12.0 | |
| Nominal certification | 0 | 0.0 | 2 | 8.0 | |
| Excessive cost of obtaining and maintaining certification | 1 | 8.3 | 0 | 0.0 | |
| No needs of external buyers | 0 | 0.0 | 0 | 0.0 | |
| No incentives | 0 | 0.0 | 1 | 4.0 | |
OHS, occupational health and safety; OHSMS, occupational health and safety management system.
p value by Fisher exact test.
p value by Pearson Chi-square test.
Effectiveness of implementing and management benefits of OHSMS (n = 72)
| Factors | Job position | ||||
|---|---|---|---|---|---|
| Site general manager | OHS manager | ||||
| % | % | ||||
| Effectiveness of implementing OHSMS | 0.0326* | ||||
| Prevention of accidents | 17 | 47.2 | 11 | 30.6 | |
| Legal compliance | 5 | 13.9 | 12 | 33.3 | |
| Effective on-site safety and health management | 5 | 13.9 | 8 | 22.2 | |
| Improving quality | 3 | 8.3 | 5 | 13.9 | |
| Improving productivity | 5 | 13.9 | 0 | 0.0 | |
| Reducing management costs | 0 | 0.0 | 0 | 0.0 | |
| Improving safety consciousness of management | 1 | 2.8 | 0 | 0.0 | |
| Improving safety consciousness of workers | 0 | 0.0 | 0 | 0.0 | |
| Improving company's image | 0 | 0.0 | 0 | 0.0 | |
| Management benefits of OHSMS | 0.0317* | ||||
| Products | 10 | 27.8 | 3 | 8.3 | |
| Process | 8 | 22.2 | 17 | 47.2 | |
| Production | 9 | 25.0 | 9 | 25.0 | |
| Marketing | 2 | 5.6 | 4 | 11.1 | |
| Loss control | 7 | 19.4 | 2 | 5.6 | |
| R and D | 0 | 0.0 | 1 | 2.8 | |
OHS, occupational health and safety; OHSMS, occupational health and safety management system.
* p value by Fisher exact test.
OHSMS awareness of various construction types (n = 72)
| Factors | Construction types | ||||||
|---|---|---|---|---|---|---|---|
| Housing and office | Transportation | Plant | |||||
| % | % | % | |||||
| Motivation of developing OHSMS | 0.0191* | ||||||
| Lack of health and safety management system | 29 | 60.4 | 9 | 45.0 | 1 | 25.0 | |
| Social responsibility and legal issues | 5 | 10.4 | 7 | 35.0 | 0 | 0.0 | |
| Elimination and management of health and safety risks | 12 | 25.0 | 2 | 10.0 | 2 | 50.0 | |
| Reduce the cost of health and safety management | 2 | 4.2 | 1 | 5.0 | 0 | 0.0 | |
| Responding and complying with interested party | 0 | 0.0 | 1 | 5.0 | 1 | 25.0 | |
| Implementation methods | 0.0025* | ||||||
| Itself | 30 | 62.5 | 4 | 20.0 | 2 | 50.0 | |
| Part of support from consulting firm | 14 | 29.2 | 8 | 40.0 | 2 | 50.0 | |
| Support from consulting firm | 4 | 8.3 | 8 | 40.0 | 0 | 0.0 | |
| Cost of OHSMS implementation and certification | 0.0448* | ||||||
| Inexpensive | 16 | 33.3 | 2 | 10.0 | 0 | 0.0 | |
| Reasonable cost | 26 | 54.2 | 16 | 80.0 | 2 | 50.0 | |
| Expensive | 3 | 6.3 | 2 | 10.0 | 2 | 50.0 | |
| Other | 3 | 6.3 | 0 | 0.0 | 0 | 0.0 | |
| Effectiveness of implementing OHSMS | 0.0051* | ||||||
| Prevention of accidents | 23 | 47.9 | 4 | 20.0 | 1 | 25.0 | |
| Legal compliance | 11 | 22.9 | 4 | 20.0 | 2 | 50.0 | |
| Effective on-site safety and health management | 10 | 20.8 | 3 | 15.0 | 0 | 0.0 | |
| Improving quality | 3 | 6.3 | 5 | 25.0 | 0 | 0.0 | |
| Improving productivity | 1 | 2.1 | 4 | 20.0 | 0 | 0.0 | |
| Reducing management costs | — | — | — | — | — | — | |
| Improving safety consciousness of management | 0 | 0.0 | 0 | 0.0 | 1 | 25.0 | |
| Improving safety consciousness of workers | — | — | — | — | — | — | |
| Improving company's image | — | — | — | — | — | — | |
| Management benefits of OHSMS | 0.0338* | ||||||
| Products | 12 | 25.0 | 1 | 5.0 | 0 | 0.0 | |
| Process | 17 | 35.4 | 8 | 40.0 | 0 | 0.0 | |
| Production | 12 | 25.0 | 4 | 20.0 | 2 | 50.0 | |
| Marketing | 4 | 8.3 | 2 | 10.0 | 0 | 0.0 | |
| Loss control | 2 | 4.2 | 5 | 25.0 | 2 | 50.0 | |
| R and D | 1 | 2.1 | 0 | 0.0 | 0 | 0.0 | |
OHSMS, occupational health and safety management system.
* p value by Fisher exact test.