| Literature DB >> 24250340 |
Jafar Akbari1, Habibollah Dehghan, Hiva Azmoon, Farhad Forouharmajd.
Abstract
UNLABELLED: Work environment affects human productivity and his performance. The aims of this study were to investigate the effects of lighting and noise levels on human productivity in the automotive assembly industry.Entities:
Mesh:
Year: 2013 PMID: 24250340 PMCID: PMC3819755 DOI: 10.1155/2013/527078
Source DB: PubMed Journal: J Environ Public Health ISSN: 1687-9805
Average of noise, lighting, and productivity.
| Unit | Noise (dBA) | Lighting (Lx) | Productivity | ||
|---|---|---|---|---|---|
| Actual | Minimum | Proposed | |||
| Tech-en | 71.87 | 195.25 | 300 | 500 | 72.42 |
| Mac | 86.00 | 321.55 | 300 | 500 | 58.07 |
| Ni-as | 85.62 | 275.75 | 300 | 500 | 69.07 |
| War | 69.57 | 164.57 | 300 | 500 | 52.16 |
| Pro | 92.50 | 289.10 | 300 | 500 | 65.88 |
| Pr-as | 88.70 | 305.36 | 200 | 300 | 63.88 |
| Off | 70.24 | 382.55 | 200 | 500 | 72.61 |
| Com | 77.57 | 466.42 | 300 | 500 | 81.25 |
| Dri | 89.66 | 510.66 | 300 | 500 | 56.00 |
| Wel | 90.00 | 203.88 | 200 | 300 | 58.20 |
|
| |||||
| Total | 83.41 | 310.44 | — | — | 64.75 |
Actual, average measured, minimum, and proposed are standard values; lighting requirements (Lx) must be equal proposed values. Units: Tech-en: technical-engineering, Mac: machining, Ni-as: Nissan assembly, War: warehouse, Pro: production, Pr-as: pride assembly, Off: office, Com: commercial, Dri: drilling, Wel: welding.
Figure 1Relationship between noise level (dBA) and human productivity in automotive assembly industry.
Figure 2Relationship between lighting (Lux) and human productivity in automotive assembly industry.
Figure 3Relationship between age (year) and human productivity in automotive assembly industry.