Literature DB >> 24016469

Fukushima remediation: status and overview of future plans.

S M L Hardie1, I G McKinley2.   

Abstract

The 2011 accident at the Fukushima Dai-ichi Nuclear Power Plant, Japan, released large quantities of volatile radionuclides, requiring evacuation of a 20 km zone around the reactor site plus additional areas where fallout was particularly high. After decay of shorter-lived isotopes, off-site contamination is now dominated by (134/137)Cs, with ∼1800 km(2) having external gamma doses above 5 mSv y(-1). Although the significance for health of such radiation levels is low, there has been a Government decision that these areas will be cleaned up to reduce exposure and allow displaced residents to return home. After initial tests at 2 sites, a further 11 demonstration remediation projects have been carried out. This work is coordinated by the Japan Atomic Energy Agency (JAEA), with MCM providing support in quality assessment of radioactivity measurements, evaluating the success of different clean-up methods and developing guidelines for the next multi-year phase of large-scale remediation. This work provides a unique perspective on the progress of remediation, experience gained and issues that still need to be resolved - particularly associated with management of the huge quantities of waste generated. This knowledge base will also be important for the bigger challenge of on-site remediation, which will require decades to complete. Additionally, experience and tools may be transferable to cleaning nuclear legacy sites around the world, a problem that is often forgotten in the debate on national nuclear waste management.
Copyright © 2013 Elsevier Ltd. All rights reserved.

Entities:  

Keywords:  Communication; Fukushima; Radiocaesium contamination; Remediation; Waste disposal

Mesh:

Substances:

Year:  2013        PMID: 24016469     DOI: 10.1016/j.jenvrad.2013.08.002

Source DB:  PubMed          Journal:  J Environ Radioact        ISSN: 0265-931X            Impact factor:   2.674


  3 in total

1.  High pressure decontamination of building materials during radiological incident recovery.

Authors:  William C Jolin; Matthew L Magnuson; Michael D Kaminski
Journal:  J Environ Radioact       Date:  2019-06-12       Impact factor: 2.674

2.  Managing Groundwater Radioactive Contamination at the Daiichi Nuclear Plant.

Authors:  Atsunao Marui; Adrian H Gallardo
Journal:  Int J Environ Res Public Health       Date:  2015-07-21       Impact factor: 3.390

3.  Scientific justifications for the political decision-making on environmental remediation carried out after the Fukushima nuclear accident.

Authors:  Maria R H Takeuchi; Tatsuya Hasegawa; Susie M L Hardie; Linda E McKinley; Gian Powell B Marquez; Keiichi N Ishihara
Journal:  Heliyon       Date:  2021-03-29
  3 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.