Literature DB >> 21705142

Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals.

Kambiz Mokhtari1, Jun Ren, Charles Roberts, Jin Wang.   

Abstract

Ports and offshore terminals are critical infrastructure resources and play key roles in the transportation of goods and people. With more than 80 percent of international trade by volume being carried out by sea, ports and offshore terminals are vital for seaborne trade and international commerce. Furthermore in today's uncertain and complex environment there is a need to analyse the participated risk factors in order to prioritise protective measures in these critically logistics infrastructures. As a result of this study is carried out to support the risk assessment phase of the proposed Risk Management (RM) framework used for the purpose of sea ports and offshore terminals operations and management (PTOM). This has been fulfilled by integration of a generic bow-tie based risk analysis framework into the risk assessment phase as a backbone of the phase. For this reason Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) are used to analyse the risk factors associated within the PTOM. This process will eventually help the port professionals and port risk managers to investigate the identified risk factors more in detail. In order to deal with vagueness of the data Fuzzy Set Theory (FST) and possibility approach are used to overcome the disadvantages of the conventional probability based approaches.
Copyright © 2011 Elsevier B.V. All rights reserved.

Entities:  

Mesh:

Year:  2011        PMID: 21705142     DOI: 10.1016/j.jhazmat.2011.05.035

Source DB:  PubMed          Journal:  J Hazard Mater        ISSN: 0304-3894            Impact factor:   10.588


  4 in total

1.  Mine safety assessment using gray relational analysis and bow tie model.

Authors:  Qingwei Xu; Kaili Xu
Journal:  PLoS One       Date:  2018-03-21       Impact factor: 3.240

2.  Comprehensive evaluation system for stability of multiple dams in a uranium tailings reservoir: based on the TOPSIS model and bow tie model.

Authors:  Fuliang Jiang; Haonan Wu; Yong Liu; Guan Chen; Jintao Guo; Zhe Wang
Journal:  R Soc Open Sci       Date:  2020-04-08       Impact factor: 2.963

3.  A Methodology for Harmonizing Safety and Health Scales in Occupational Risk Assessment.

Authors:  Zuzhen Ji; Dirk Pons; John Pearse
Journal:  Int J Environ Res Public Health       Date:  2021-05-01       Impact factor: 3.390

4.  Fuzzy Bayesian Network-Bow-Tie Analysis of Gas Leakage during Biomass Gasification.

Authors:  Fang Yan; Kaili Xu; Xiwen Yao; Yang Li
Journal:  PLoS One       Date:  2016-07-27       Impact factor: 3.240

  4 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.