| Literature DB >> 21353577 |
A J Kreiner1, W Castell, H Di Paolo, M Baldo, J Bergueiro, A A Burlon, D Cartelli, V Thatar Vento, J M Kesque, J Erhardt, J C Ilardo, A A Valda, M E Debray, H R Somacal, J C Suarez Sandin, M Igarzabal, H Huck, L Estrada, M Repetto, M Obligado, J Padulo, D M Minsky, M Herrera, S J Gonzalez, M E Capoulat.
Abstract
We describe the present status of an ongoing project to develop a Tandem-ElectroStatic-Quadrupole (TESQ) accelerator facility for Accelerator-Based (AB)-BNCT. The project final goal is a machine capable of delivering 30 mA of 2.4 MeV protons to be used in conjunction with a neutron production target based on the (7)Li(p,n)(7)Be reaction. The machine currently being constructed is a folded TESQ with a high-voltage terminal at 0.6 MV. We report here on the progress achieved in a number of different areas. Copyright ÂEntities:
Mesh:
Year: 2011 PMID: 21353577 DOI: 10.1016/j.apradiso.2011.01.040
Source DB: PubMed Journal: Appl Radiat Isot ISSN: 0969-8043 Impact factor: 1.513