Literature DB >> 20363122

Alum sludge-based constructed wetland system for enhanced removal of P and OM from wastewater: concept, design and performance analysis.

A O Babatunde1, Y Q Zhao, X H Zhao.   

Abstract

The concept, design and performance analysis of a four-stage novel constructed wetland system (CWs) capable of enhanced and simultaneous removal of phosphorus (P) and organic matter (OM) from wastewaters is described. Alum sludge, a largely available by-product of drinking water facilities using aluminium salts as coagulant was used as the media. Under a hydraulic loading rate of 1.27 m(3)/m(2) d and a range of organic loading rate of 279.4-774.7 g-BOD(5)/m(2)d and 361.1-1028.7 g-COD/m(2)d, average removal efficiencies (mean+/-SD) of 90.6+/-7.5% for BOD(5) and 71.8+/-10.2% for COD were achieved, respectively. P removal was exceptional with average removal efficiency of 97.6+/-1.9% achieved for soluble reactive P at a mean influent concentration of 21.0+/-2.9 mg/l. Overall, the system holds great promise as a novel CWs for simultaneous removal of P and OM, and at the same time, it transforms alum sludge from a waste into a useful material. Copyright 2010 Elsevier Ltd. All rights reserved.

Entities:  

Mesh:

Substances:

Year:  2010        PMID: 20363122     DOI: 10.1016/j.biortech.2010.03.066

Source DB:  PubMed          Journal:  Bioresour Technol        ISSN: 0960-8524            Impact factor:   9.642


  7 in total

Review 1.  The effects of different aeration strategies on the performance of constructed wetlands for phosphorus removal.

Authors:  Huma Ilyas; Ilyas Masih
Journal:  Environ Sci Pollut Res Int       Date:  2018-01-04       Impact factor: 4.223

2.  Use of alum water treatment sludge to stabilize C and immobilize P and metals in composts.

Authors:  R J Haynes; Y-F Zhou
Journal:  Environ Sci Pollut Res Int       Date:  2015-05-07       Impact factor: 4.223

3.  Modeling of constructed wetland performance in BOD5 removal for domestic wastewater under changes in relative humidity using genetic programming.

Authors:  Vanitha Sankararajan; Nampoothiri Neelakandhan; Sivapragasam Chandrasekaran
Journal:  Environ Monit Assess       Date:  2017-03-15       Impact factor: 2.513

4.  Enhanced phosphorus removal in intermittently aerated constructed wetlands filled with various construction wastes.

Authors:  Xia Shi; Jinlin Fan; Jian Zhang; Youhao Shen
Journal:  Environ Sci Pollut Res Int       Date:  2017-08-13       Impact factor: 4.223

5.  Achieving an extraordinary high organic and hydraulic loadings with good performance via an alternative operation strategy in a multi-stage constructed wetland system.

Authors:  Xiaohong Zhao; Yuansheng Hu; Yaqian Zhao; Lordwin Kumar
Journal:  Environ Sci Pollut Res Int       Date:  2018-02-14       Impact factor: 4.223

Review 6.  Design, Operation and Optimization of Constructed Wetland for Removal of Pollutant.

Authors:  Md Ekhlasur Rahman; Mohd Izuan Effendi Bin Halmi; Mohd Yusoff Bin Abd Samad; Md Kamal Uddin; Khairil Mahmud; Mohd Yunus Abd Shukor; Siti Rozaimah Sheikh Abdullah; S M Shamsuzzaman
Journal:  Int J Environ Res Public Health       Date:  2020-11-11       Impact factor: 3.390

7.  Promoting the bio-cathode formation of a constructed wetland-microbial fuel cell by using powder activated carbon modified alum sludge in anode chamber.

Authors:  Lei Xu; Yaqian Zhao; Liam Doherty; Yuansheng Hu; Xiaodi Hao
Journal:  Sci Rep       Date:  2016-05-20       Impact factor: 4.379

  7 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.