Literature DB >> 20138699

Polyurethane rotating disc system for post-treatment of anaerobically pre-treated sewage.

A Tawfik1, A Klapwijk.   

Abstract

The performance of polyurethane rotating discs (RBC-1) versus polystyrene rotating discs (RBC-2) for the treatment of an up-flow anaerobic sludge blanket (UASB) reactor effluent fed with domestic wastewater was investigated. Both RBC units were operated at the same organic loading rate (OLR) of 10.5 gCOD/m(2) d. and a hydraulic retention time (HRT) of 2.5 h. The residual values of COD fractions (COD(suspended), COD(colloidal) and COD(soluble)) in the treated effluent of RBC-1 and RBC-2 were similar. However, the removal efficiency of ammonia in the RBC-1 (87 +/- 4%) was significantly higher than that found for RBC-2 i.e. 24 +/- 6%. Moreover, RBC-1 achieved a substantial removal efficiency of 99.0 +/- 1% for Escherichia coli (E. coli), while RBC-2 removed 91.2 +/- 0.3%. Based on these results, optimization of RBC-1 treating UASB reactor effluent was extensively performed. The RBC-1 was operated at an OLR's of 4.0, 11 and 23 gCOD/m(2) d. The results obtained showed that increasing the OLR from 11.0 to 23.0 gCOD/m(2) d and decreasing the HRT from 2.5 to 1.25 h significantly declined the effluent quality of COD(total) and ammonia. However, the residual values of COD(total) and ammonia remained unaffected when increasing the OLR from 4.0 to 11.0 gCOD/m(2) d and by decreasing the HRT from 5 to 2.5 h. Bacteriological examination showed that the mean residual count of E. coli remained at a level of 10(4)/100 ml, in the effluent of RBC-1 independent on the imposed HRT. Accordingly, it is recommended to operate RBC-1 for treatment of anaerobically pre-treated sewage at an OLR of 11 gCOD/m(2) d and an HRT of 2.5 h. A feed-less (ammonia limitation) period of 9.0 days followed by 9.0 days feeding with high OLR of 26 gCOD/m(2) d. (raw sewage) was investigated to elaborate, if the nitrifiers of the RBC-1 are capable to convert ammonia to nitrate after totally 18 days when retuning back to the normal operating conditions. The results of the experiment clearly show a strong and immediate detrimental effect of imposing high OLR of 26 gCOD/m(2) d on the nitrification process in the nitrifying RBC unit. However, after returning back to the original OLR of 10.6 gCOD/m(2) d, the nitrification efficiency in the RBC unit was recovered within 2-3 days. Copyright 2010 Elsevier Ltd. All rights reserved.

Entities:  

Mesh:

Substances:

Year:  2010        PMID: 20138699     DOI: 10.1016/j.jenvman.2010.01.010

Source DB:  PubMed          Journal:  J Environ Manage        ISSN: 0301-4797            Impact factor:   6.789


  2 in total

1.  Fate of parasites and pathogenic bacteria in an anaerobic hybrid reactor followed by downflow hanging sponge system treating domestic wastewater.

Authors:  A Tawfik; T El-Zamel; A Herrawy; G El-Taweel
Journal:  Environ Sci Pollut Res Int       Date:  2015-04-21       Impact factor: 4.223

2.  Performance evaluation of a full-scale upflow anaerobic sludge blanket reactor coupled with trickling filters for municipal wastewater treatment in a developing country.

Authors:  Philomina M A Arthur; Yacouba Konaté; Boukary Sawadogo; Gideon Sagoe; Bismark Dwumfour-Asare; Issahaku Ahmed; Myron N V Williams
Journal:  Heliyon       Date:  2022-08-13
  2 in total