Literature DB >> 18384699

Front-line epistaxis management: let's not forget the basics.

E C Ho1, J-Y Chan.   

Abstract

OBJECTIVE: We postulated that epistaxis patients frequently have their nose packed in the accident and emergency department without any reasonable prior attempt at nasal assessment and nasal cautery.
DESIGN: Telephone survey of 104 accident and emergency departments.
RESULTS: A 100 per cent response rate was achieved. In all but one of the departments surveyed, first line management was carried out by accident and emergency doctors. Seventy-four per cent of accident and emergency doctors perform nasal cautery as first line management. Within accident and emergency departments, the availability and usage of head illumination, nasal speculums, topical anaesthesia and suction was grossly suboptimal. Only one-sixth of the accident and emergency doctors surveyed had received training in the management of epistaxis, whilst 81 per cent of accident and emergency departments would admit nasally packed patients under the ENT team.
CONCLUSION: Despite the majority of accident and emergency doctors claiming to attempt nasal cautery before packing, this is unlikely to be effective if performed without the correct equipment. Better training and equipment need to be provided to accident and emergency doctors in order to optimise the management of epistaxis patients. This could potentially reduce inappropriate admissions.

Entities:  

Mesh:

Year:  2008        PMID: 18384699     DOI: 10.1017/S0022215108002181

Source DB:  PubMed          Journal:  J Laryngol Otol        ISSN: 0022-2151            Impact factor:   1.469


  2 in total

Review 1.  Transcatheter embolization in the management of epistaxis.

Authors:  Gregory J Dubel; Sun Ho Ahn; Gregory M Soares
Journal:  Semin Intervent Radiol       Date:  2013-09       Impact factor: 1.513

2.  Is routine nasoendoscopy warranted in epistaxis patients after removal of nasal packing?

Authors:  Tafadzwa P Makarawo; David Howe; Samuel K Chan
Journal:  Allergy Rhinol (Providence)       Date:  2011-01
  2 in total

北京卡尤迪生物科技股份有限公司 © 2022-2023.