J A Alvarez1, I Ruiz, M Gómez, J Presas, M Soto.
Abstract
Different start-up procedures of an upflow anaerobic sludge bed (UASB) digester were carried out. Start-up without inoculum (experiment A) was delayed for about 120 day. The digester reached 75-85% total suspended solids (TSS) removal, 54-58% total chemical oxygen demand (TCOD) removal and 63-73% biological oxygen demand (BOD5) removal at influent concentrations of 240-340 mg TCODil-1, temperatures of 13.5-15 degrees C and hydraulic retention times (HRT) of 10-11 h. Digested sludge was used as inoculum in experiment B. After the start-up period of 75 days, digester efficiencies were 58%, 41% and 54% for TSS, TCOD and BOD5 removal, respectively, working at 169 mg TCODil-1, temperature of 14 degrees C and HRT of 11 h. The sludge bed developed and stabilised quickly when using a hydraulically adapted inoculum (experiment C), but TCOD and BOD5 removals remained low and volatile fatty acids (VFA) accumulated in the effluent.Entities:
Mesh:
Substances:
Year: 2005 PMID: 16171991 DOI: 10.1016/j.biortech.2005.07.033
Source DB: PubMed Journal: Bioresour Technol ISSN: 0960-8524 Impact factor: 9.642